|
The Arizona Department of Transportation advises drivers who travel Interstate 40 in Flagstaff to continue planning for ongoing lane restrictions from the junction with I-17 (milepost 195) to Country Club Drive (milepost 201) through the end of July.
The following overnight restrictions will occur from 7 p.m. Sunday, June 20, to 6 a.m. Wednesday, June 23:
-
Eastbound I-40 will be narrowed to one lane in work areas between Butler Avenue (milepost 198) and Country Club Drive (milepost 201).
- The speed limit will be reduced to 45 mph.
- A 16-foot vehicle-width restriction will be in place.
The following around-the-clock restrictions will occur from 7 p.m. Monday, June 21, to 6 a.m. Friday, June 25:
-
Westbound I-40 will be narrowed to one lane in work areas between Country Club Drive (milepost 201) and Butler Avenue (milepost 198).
- The speed limit will be reduced to 45 mph.
- A 16-foot vehicle-width restriction will be in place.
The following overnight restrictions will occur from 7 p.m. Wednesday, June 23, to 6 a.m. Friday, June 25:
-
Westbound I-40 will be narrowed to one lane in work areas between Country Club Drive (milepost 201) and Butler Avenue (milepost 198).
- The speed limit will be reduced to 45 mph.
- A 16-foot vehicle-width restriction will be in place.
The following overnight restrictions will occur from 7 p.m. Sunday, June 27 to 6 a.m. Friday, July 2:
-
Westbound I-40 will be narrowed to one lane in work areas between west of Butler Avenue (milepost 198) and the junction with I-17 (milepost 195).
- The speed limit will be reduced to 45 mph.
- A 16-foot vehicle-width restriction will be in place.
The following around-the-clock restrictions will occur from 7 p.m. Monday, June 28, to 6 a.m. Friday, July 2:
-
Westbound I-40 will be narrowed to one lane in work areas near the junction with I-17 (between mileposts 196 – 195).
- The speed limit will be reduced to 45 mph.
- A 16-foot vehicle-width restriction will be in place.
The pavement preservation work is part of a larger ADOT project currently underway to improve the roadway and traffic interchanges along a 10-mile stretch of I-40 between Interstate 17 (milepost 195) and Walnut Canyon Road (milepost 205). Since 2016, ADOT has replaced about 90 miles of pavement and repaired, upgraded or replaced 35 bridges along I-40. For more information, visit the project webpage: azdot.gov/I40WalnutCanyonRd
ADOT advises drivers to slow down and use caution around personnel and equipment while pavement repairs are underway.
|