Onsite Industry Update—Sept. 13, 2023

Having trouble viewing this email? View it as a Web page.

Onsite Industry Update

Ensure your drainfield meets setbacks to the building foundation

When the drainfield is upslope from a building foundation with foundation drains, it must be at least 30 feet away. See Table 4 in Environmental Health Code, Chapter 2 for more info.

When to submit a redesign vs. resubmittal

If you make changes to your design before we approve it, submit the revised design as a resubmittal to the existing application.

If you make changes to your design after we approve it, submit your revised design as a redesign application.

Questions? Contact us at ehsepticsystems@tpchd.org.

New terralift policy

You can now request a second terralift to reduce drainfield clogging. A certified Operation and Maintenance (O&M) firm, septic designer or engineer can request a second terralift if they meet conditions. Learn more in our Second Terralift Policy, effective Aug. 15, 2023.

Questions? Contact us at omseptic@tpchd.org.

Check the status of your application online

Stay up to date on your application. You can regularly check the status online at eco.tpchd.org/#/pa2/search. 

Questions?

Visit tpchd.org/septic or contact us at ehsepticsystems@tpchd.org or (253) 649-1925.