Starting Monday, Nov. 30, crews will shift eastbound traffic into the center turn lane along Beardslee Blvd between NE 185th St and 110th Ave NE. The crosswalk will also be closed at Beardslee Blvd and NE 185th St. Pedestrians will need to use the crosswalk at 110th Ave NE.
Work is scheduled Monday through Friday from 7 a.m. to 8 p.m. through spring 2027 and includes utility work, roadway and sidewalk improvements, and station construction. See the map below for the work area.
Beardslee Blvd will remain open to traffic, and access to driveways will be maintained. Left turns out of business and residences onto eastbound Beardslee Blvd between NE 185th St and 110th Ave NE will be restricted. Pedestrians will be detoured to crosswalks at the Beardslee Blvd and 110th Ave NE intersection to get around the work.
Businesses and residences will remain open and accessible throughout construction.
The affected King County Metro bus stop on Beardslee Blvd between NE 185th St and 110th Ave NE will be temporarily moved west of the existing station.
Travel conditions may change during construction. Drivers, cyclists, and pedestrians should follow posted signs and allow extra time for travel.
Building road improvements is key to ensuring the Stride S3 buses can move through the route more quickly. This work will allow Sound Transit to deliver fast, frequent, and reliable rapid transit service along S3. For more information on Stride S3 bus service, visit the Stride webpage.