|
West end alleyway work on Sept. 11
On Friday, Sept. 11, from 7 a.m. to 3:30 p.m., Sound Transit’s contractor will work at the west end of the alleyway located on A Street, NW between 1st Street NW and 2nd Street NW. Construction will take place near the railroad tracks at the west end of the alleyway.
The work crew will maintain pedestrian access and access to parking spaces near the alleyway during this period. Please allow extra time when entering or exiting the area, as construction crews may need time to temporarily move equipment to provide access.
What
- Construction at the west end of alleyway located on A Street NW between 1st Street NW and 2nd Street NW.
When
Where
- West end of the alleyway, located on A Street NW, between 1st Street NW and 2nd Street NW.
More
- During construction, the work crew will maintain pedestrian access and access to parking spaces near the alleyway.
- Please allow for extra time when entering or exiting the area, as construction crews may need time to temporarily move equipment to provide access.
Contact us
Outreach Specialist: auburngarage@soundtransit.org or (206) 689-4877
After-hours construction hotline: 888-298-2395
|
|
Your safety is our priority.
Getting around construction zones can be a challenge. Whether you are walking, rolling, cycling or driving, please stay safe.
|
|
Have an after-hours construction concern?
Call our 24-hour hotline: 888-298-2395
|
|
|
|