|
Evening and nighttime road closure on 61st Ave NE between SR 522 and NE 175th St
Starting Wednesday, May 20 through Friday, May 22, Sound Transit will close 61st Avenue NE between SR 522 (NE Bothell Way) and NE 175th Street from 6 p.m. to 6 a.m. for nighttime saw cutting across the road.
This work is necessary to prepare for upcoming trenching and utility work. This work must be done at night, as daytime work hours are not long enough to set up and complete the work.
Eastbound drivers can access 175th Street via 65th Avenue NE. (see the attached map)
Westbound drivers can access 175th Street via 68th Avenue NE or take the detour on 60th Avenue NE around the block and turn left on to eastbound SR 522 at 61st Avenue NE. (see the attached map)
The sidewalk between SR 522 and NE 175th Street on 61st Avenue NE will remain open during this work. This work will not affect the Burke-Gilman Trail.
What
When
- 6 p.m. Wednesday, May 20 – 6 a.m. Thursday, May 21
- 6 p.m. Thursday, May 21 – 6 a.m. Friday May 22
Where
- 61st Ave NE between SR 522 (NE Bothell Way) and NE 175th St.
More info
- Expect normal construction noise.
- Drivers, cyclists, and pedestrians should follow posted signs and directions.
- Plan ahead, leave early, and allow extra time to reach your destination.
-
Dates and times are subject to change due to inclement weather or unforeseen issues.
- WSDOT controlled signals will remain in standard operation. Traffic barrels and signage will be in place to ensure the safety of crews and vehicles using the road.
|
|
Your safety is our priority.
Getting around construction zones can be a challenge. Whether you are walking, rolling, cycling or driving, please stay safe.
|
|
Have an after-hours construction concern?
Call our 24-hour hotline: 888-298-2395
|
|
After-hours construction hotline: 888-298-2395
|
|
|
|