Section 5
Evening and nighttime temporary lane closures on SR 522 in Kenmore
Beginning May 18, Sound Transit will conduct two months of evening and nighttime lane closures on SR 522 (NE Bothell Way) between the 61st Ave NE and 80th Ave NE intersections. This work will take place on weekdays, between 6 p.m. and 6 a.m. The work zone map is below.
Traffic lane shifts will change as work progresses. Signage will be present to indicate all lane closures. This is not a full closure, so the road will remain open to traffic.
The evening and nighttime work will allow the contractor to construct water and utility infrastructure at the Stride station locations in Kenmore. This work must be done at night, as daytime work hours are not long enough to set up and complete the work.
What
When
-
Weekdays: 6 p.m.- 6 a.m.
- May 18 - July 31
Where
- Traffic lanes on SR 522 (NE Bothell Way) between the 61st Ave NE and 80th Ave NE intersections.
More info
- Expect normal construction noise.
- Drivers, cyclists, and pedestrians should follow posted signs and directions.
- Plan ahead, leave early, and allow extra time to reach your destination.
-
Dates and times are subject to change due to inclement weather or unforeseen issues.
- WSDOT controlled signals will remain in standard operation. Traffic barrels and signage will be in place to ensure the safety of crews and vehicles using the road.
|
|
Section 7
Your safety is our priority.
Getting around construction zones can be a challenge. Whether you are walking, rolling, cycling or driving, please stay safe.
|
|
Section 8
Have an after-hours construction concern?
Call our 24-hour hotline: 888-298-2395
|
|
Section 9
After-hours construction hotline: 888-298-2395
|
|
|
|