|
NE 185th St closed for new right-of-way alignment striping
From Friday, May 31, through Sunday, June 2, Sound Transit will be performing a weekend road closure of NE 185th St from 5th Ave NE to 8th Ave NE for striping of the new NE 185th St right-of-way alignment. The work is part of the Lynnwood Link Extension.
What
-
Closure of NE 185th St from 5th Ave NE to 8th Ave NE will remain in place for 48 hours to complete the work. Detour routes are in place for drivers (see map).
-
Local access will be provided to residents that live within the road closure limits.
-
Residents should expect construction noise from equipment being operated with louder noise such as an MMA truck, a thermoplastic truck, a paint truck, a hydro blaster, an air compressor, a generator, and light plants.
-
If work is delayed beyond the provided dates, a new road closure will be scheduled and a new flyer will be provided to residents.
-
Some bus routes may be affected. Please check the King County Metro website for details.
Where
When
-
Entire weekend:
-
Starting on Friday, May 31, at 11:59 p.m., and reopening on Sunday, June 2, 11:59 p.m.
Contact us
|
|
Your safety is our priority.
Getting around construction zones can be a challenge. Whether you are walking, rolling, cycling or driving, please stay safe.
|
|
Have an after-hours construction concern?
Call our 24-hour hotline: 888-298-2395
|
|
|
|