To install curb, gutter, ADA ramps and a crosswalk, crews closed S. 9th St. west of Martin Luther King Jr. Way for a half-block to the alley. Please follow the detour on S. J St. The curb and gutter work on the west side of MLK Jr. Way from S. 10th St. to S. 7th St. is expected to be completed by March 18. S. 8th St. will close from MLK Jr. Way west to the alley for work at the traction power substation on Friday, March 11.
Crews continue working on the St. Joseph Station and installing pavement on MLK Jr. Way. MLK Jr. Way is closed to southbound traffic from S. 15th St. to S. 19th St. During the weekend of March 12, MLK Jr. Way will be closed in both directions from S. 17th St. to S. 19th St. for track repair and station work. Please follow the detour on S. J St. – thank you.
Crews are installing curb and gutter at the corners of 5th Street and the east side of Martin Luther King Jr. Way near Tacoma General Hospital. Access is open to hospitals, medical centers and the emergency department. To enter Tacoma General and the Emergency Department, please follow S. 5th St. down the hill and then exit through the alley to 6th Avenue. To access Kaiser Permanente, follow S. J St. to S. 3rd St. Please allow a little extra time to reach your appointment – thank you. MLK Jr. Way is closed northbound to thru-traffic from 6th Ave. to S. 3rd St. The travelling public should follow the detour on S. J St.
Crews will start installing signals at the Stadium Way/I-705 intersection on Thursday, March 10. Crews continue installing curb and gutter on the north side of Division Avenue from MLK Jr. Way to Yakima Ave. Crews will install underground fiber along the existing Tacoma Link route during the weekend at night. In addition, crews are grounding Link power poles along the route, and may close some parking spaces while working near the poles. We’re inspecting the work and making adjustments, as needed. MLK Jr. Way may experience "rolling closures" as the inspectors move along the route.
What
Construction and traffic restrictions at Division Avenue, Martin Luther King Jr. Way, S. 8th Street, and S. 9th Street
When
Week of March 8
Where
- Division Avenue from Martin Luther King Jr. Way to Yakima Ave – traffic restrictions.
- Martin Luther King Jr. Way from 6th Avenue to S. 3rd St. – northbound lane closure to thru-traffic. Access open to Emergency Department, hospitals and medical facilities.
- Martin Luther King Jr. Way from S. 10th St. to S. 7th St. – traffic restrictions.
- S. 8th Street from MLK Jr. Way to the alley – street closure on Friday, March 11.
- S. 9th Street west of MLK Jr. Way for about a half block – street closure.
- Martin Luther King Jr. Way from S. 15th St. to S. 19th St. – southbound lane closure.
More
- Driveway and pedestrian access is maintained, although some sidewalks and crosswalks will be temporarily closed. Pedestrian detours will be in place.
- Buses will follow detour routes. Visit PierceTransit.org for information.
- Construction noise related to removing pavement and operating equipment.
- Large construction equipment or materials may be in the right-of-way.
- Work will generally take place during the daytime hours unless otherwise noted. Daytime hours during the week are 7 a.m. to 9 p.m. The contractor usually works less hours.
- Businesses are open during construction.
- Plan ahead and allow extra time to reach your destination.
- Due to inclement weather or unforeseen issues, dates and times are subject to change.
Contact us
Outreach Specialist: liz.ellis@soundtransit.org or 253-208-0586 After-hours construction hotline: 888-298-2395
Learn how to stay safe around our construction sites.
|