Crews are installing curb and gutter on the west side of Stadium Way from Division Avenue to S. 4th Street. As part of the track work, crews also are pouring concrete for the roadway in the Division Ave and Stadium Way intersection. The southbound lane on Stadium Way is closed between Broadway and S. 4th St. Northbound Stadium Way is open from I-705 to Tacoma Ave. To access parking garages on Stadium Way, please turn left to enter or exit the garages – thank you.
The contractor is installing curb and gutter on the west side of MLK Jr. Way from S. 19th St. to S. 16th St., as well as overhead wires in the center of MLK Jr. Way from S. 19th St. to S. 15th St. The northbound lane on MLK Jr. Way is closed from S. 19th to S. 16th St. Parking will not be available on either side of the street during the wire work. In addition, crews are installing signals at S. 9th St. and MLK Jr. Way intersection, and will start installing signals at the Earnest Brazill St. intersection as soon as Aug. 17.
On Commerce Street, crews are installing track, curb, gutter, paving and the platform for the Old City Hall Station. On E. 25th Street, crews are installing track, curb, gutter, and paving. Crews will start cleaning rail on Division Avenue as soon as Aug. 19.
Looking ahead, the contractor will start installing curb and gutter on the east side of MLK Jr. Way from S. 13th St. to S. 10th St. as soon as Aug. 23. To minimize construction impacts to the community at the Hilltop Summer Splash on Aug. 21, the contractor will start this work after that event. Sound Transit proudly sponsors the Hilltop Summer Splash, and encourages you to support businesses and connect with neighbors at this fun event!
What
Construction and traffic restrictions at Commerce Street, S. 7th Street, Stadium Way, Division Avenue, Martin Luther King Jr. Way, S. 9th Street, Earnest Brazill St., and E. 25th Street.
When
Week of August 16
Where
- Commerce Street from I-705 to S. 9th St. – southbound lane closure.
- Commerce Street from crosswalk north of Theater District Station to S. 7th St. – northbound lane closed to thru traffic during working hours (generally 7 a.m. to 5 p.m.).
- S. 7th Street at Commerce Street – no left-turn.
- Stadium Way from Broadway to S. 4th St – southbound lane closed. Please follow the detour on Tacoma Ave., St. Helens or Broadway.
- Division Avenue from Broadway to Stadium Way – closed to thru traffic.
- Division Avenue from MLK Jr. Way to Yakima Ave – traffic restrictions.
- Martin Luther King Jr. Way and S. 9th Street intersection – traffic restrictions.
- Martin Luther King Jr. Way and Earnest Brazill St. intersection – traffic restrictions.
- Martin Luther King Jr. Way from S. 19th St. to S. 16th St – northbound lane closure.
- E. 25th Street from E. G St. to E. J St. – eastbound lane closure.
- E. 25th Street from E. G St. to E. J St. – street closure on Saturday, Aug. 21.
More
- Driveway and pedestrian access is maintained, although some sidewalks and crosswalks will be temporarily closed. Pedestrian detours will be in place.
- Buses will follow detour routes. Visit PierceTransit.org for information.
- Construction noise related to removing pavement and operating equipment.
- Large construction equipment or materials may be in the right-of-way.
- Work will generally take place during the daytime hours unless otherwise noted. Daytime hours during the week are 7 a.m. to 9 p.m. The contractor usually works less hours.
- Businesses are open during construction.
- Plan ahead and allow extra time to reach your destination.
- Due to inclement weather or unforeseen issues, dates and times are subject to change.
Contact us
Outreach Specialist: liz.ellis@soundtransit.org or 253-208-0586 After-hours construction hotline: 888-298-2395
Learn how to stay safe around our construction sites.
|