I Line Updates
|
May 21, 2026
|
|
|
This email notification will provide frequent updates throughout the RapidRide I Line construction happening in Renton, Kent, and Auburn. |
|
|
In this update you can find
|
|
Visit our website for information in Español - Spanish, 한국어 -Korean, русский - Russian, українська - Ukrainian, 简体中文 - Simplified Chinese, tiếng việt - Vietnamese, Af Soomali - Somali. |
|
King County Executive Zahilay Announces Free Rides on Waterfront Shuttle Starting May 21 Ahead of FIFA World Cup 26™ in Seattle
 King County Executive Girmay Zahilay and Seattle Mayor Katie B. Wilson are kicking off Seattle’s soccer summer early with the launch of free rides on new waterfront shuttle service beginning May 21 through Labor Day.
Operated by King County Metro and sponsored by the Seattle FIFA World Cup 2026™ Local Organizing Committee (SeattleFWC26), the new shuttle will provide frequent, car-free connections between Seattle Center, Waterfront Park, Pioneer Square, Seattle Stadium, and the Chinatown-International District.
During Seattle’s six FIFA World Cup 2026™ matches, Metro will also offer subsidized free rides on separate Match Day shuttles with fares sponsored by SeattleFWC26 and its partners to help move fans and visitors throughout downtown.
RapidRide I Line is coming to Renton, Kent and Auburn
King County Metro has begun construction to build 17 miles of new RapidRide service in Renton, Kent, and Auburn. Once I Line is in service in 2027 it will provide connections to the Renton Transit Center, Kent Transit Center and Auburn Station. The I Line will also connect riders to the RapidRide F Line, Sound Transit buses; Sounder Train; and local bus service, making it easier for people to travel to and from regional destinations and access a network of local bus routes. Metro is building RapidRide I Line to meet a critical need for improved north-south transportation options in south King County. Visit our new website to check out our interactive map and learn about the passenger stations, and other improvements this project will bring!
|
|
|
What to expect during construction
|
|
|
Construction activity, mainly along roads and sidewalks, is underway. Typical work hours are Monday through Friday, 7:00 am to 5:00 pm, with some nighttime and weekend work. Construction may cause temporary changes or disruptions to your usual access or travel patterns along the RapidRide I Line route. The contractor will work in designated construction zones with potential temporary local impacts over the course of the project.
During construction, you can expect:
-
Temporary parking restrictions
-
Periodic lane and driveway closures
-
Large machinery and truck activity
-
Construction staging and parking impacts near some construction sites
-
Some sidewalk, intersection, and lane closures
-
Detours for people walking, biking, and rolling
-
Temporary bus detours and bus stop relocations for Route 160 and other area transit and bus routes.
-
Flaggers to direct traffic around work areas
|
|
RENTON
 Installation of concrete pedestrian ramp at 108th and 180th
Talbot Rd S & S 32nd St
- What crews are doing- east side
- Sidewalk removal
- Forming and pouring shelter footings
- Sidewalk paving
SE Carr Rd & Wells Ave S & Mills Ave S
- What crews are doing- north side
- Forming shelter footings
- Sidewalk replacement
SE Carr Rd & 105th Pl SE
- What crews are doing- north side
- Forming and pouring shelter footings
- What crews are doing- south side
- Traffic control set up
- Saw cutting
- Sidewalk, curb replacement paving
- Electrical underground work
- Forming shelter footing
108th Ave SE & SE 180th St
- What crews are doing- south side
- Saw cutting and sidewalk removal
- Forming and pouring shelter footings
- Electrical underground work
- Paving new sidewalk
- What crews are doing- north side
KENT
 Installation of new bus station and tech pylon foundation at Central Ave S and 259th St
108th Ave SE & SE 200th St
- What crews are doing- east side
- Forming and pouring shelter footings
- Electrical underground work
108th Ave SE & SE 216th St
- What crews are doing- east side
108th Ave SE & SE 220th St
- What crews are doing- east side
- Sidewalk, curb, and gutter paving
- Roadway paving
- What crews are doing- west side
- Saw cutting, sidewalk, curb, and gutter removal
- Sidewalk, curb, and gutter paving
- Roadway paving
Benson Rd SE & SE 224th St
- What crews are doing- east side
- Saw cutting, curb, gutter, and sidewalk removal
- Underground electrical work
- Forming and pouring shelter footings
- Sidewalk and curb paving
104th Ave SE & SE 248th St
- What crews are doing- east side
- Storm drainage installation
- Electrical underground work
- Grading and forming shelter footings
- Curb and sidewalk paving, roadway paving
- What crews are doing- west side
- Saw cutting and removal of curb, gutter, sidewalk, roadway pavement
- Electrical underground work
- Grading and forming shelter footings
- Curb, sidewalk, and roadway paving
104th Ave SE & SE 235th St
- What crews are doing- east side
- Removing curb, gutter, and sidewalk
- Removing retaining wall
- Installing storm drainage
- Forming and pouring shelter footings
- Underground electrical work
- Sidewalk and curb paving
Canyon Dr SE & 94th Ave SE
- What crews are doing
- Curb, gutter, and sidewalk removal
- Forming and pouring shelter footings
- Shelter drainage installation
- Sidewalk paving
Central Ave S & S 259th St
- What crews are doing- east side
- Asphalt roadway demolition
- Storm drainage installation
- Underground electrical work
- Roadway demolition and grading
- Pouring sidewalk, curb, gutter, and parking lot curb
- Roadway paving
- What crews are doing- west side
- Saw cutting
- Sidewalk, curb, and gutter demolition
- Pouring sidewalk, curb, gutter, and shelter footings
- Roadway paving
AUBURN
 Installation of curb and gutter line at Auburn Way and 1st St
Auburn Way N & 22nd St NE
- What crews are doing – east side
- Sidewalk removal
- Forming and pouring shelter footings
- Shelter drainage installation
- Light pole installation
Auburn Way N & 2nd St NE
- What crews are doing – west side
- Installing light pole bases
Auburn Transit Center
- What crews are doing
- Saw cutting and demolition
2nd St SW and A St SW
- What crews are doing- east side
- Electrical underground work
|
|
ORCA Business Programs
Metro provides different ORCA programs that can support large or small businesses. ORCA transit benefits offer flexibility, freedom and value. Visit our website to find the right program for your business.
|
|
 |
 |
|
Reduced Fares Programs
Metro provides reduced fares for students, seniors, low-income riders, or someone looking for a more affordable way to access transit. Check out the different lower fare options and learn if you qualify to apply.
|
Youth ORCA Card
Click to edit this All youth 18 and younger can ride transit for free! Youth are encouraged to use a Youth ORCA card or alternatively show their Student ID when they ride transit. Visit FreeYouthTransitPass.com to learn how youth can obtain a Youth ORCA card and ride transit for free.text.
|
|
 |
|
|
Renton
 |
|
11th Annual Renton Career Fair May 21 | 3PM-6PM | Renton Technical College
The City of Renton, in partnership with Renton Technical College, the Renton Chamber of Commerce, and the Renton School District, is proud to host the 11th Annual Renton Career Fair.
This two-day career fair will bring together students, alumni, and community members to meet 60+ employers from a variety of industries, including business, childcare, construction, healthcare, manufacturing, and transportation. Learn more.
|
Kent
 |
|
Kent International Festival May 30 | 10AM | Accesso ShoWare Center
Celebrate Kent's rich culture and its status as the nation's 8th most diverse city. This event is one of Kent's signature events and features music, on-stage performances, local ethnic food trucks, and a host of cultural information and merchant booths. Admission is free. Learn more. |
Auburn
 |
|
Memorial Day Service May 25 | 10AM to 11AM | Memorial Flag Plaza at Mountain View Cemetery
The public is cordially invited to attend a special Memorial Day Service on Monday, May 25 at 10:00 AM. The Cemetery is also offering special office hours during the Memorial Day weekend to assist families. Learn more.
|
|
|
Questions about construction?
|
|
|
|
|