|
We invite you to review and comment on documents, and attend an open house about the Rayonier Mill cleanup on the shores of Port Angeles. The study area of this site is moving to the next phase of cleanup. Your feedback is an important part of this process.
Public Comment Period Start: Thursday, June 12 at 8:00 AM End: Tuesday, August 12 at 11:59 PM
How to Submit Comments
We encourage you to share your comments using one of the following methods:
Preferred: Submit comments online at go.ecology.wa.gov/comment2270
Alternatively, you can send your comments by mail or email to:
Marian Abbett, Site Manager Washington Department of Ecology PO Box 47775 Olympia, WA 98504-7775 Email: Marian.Abbett@ecy.wa.gov
Documents Available for Review
-
Consent Decree (6.4 MB): To move the cleanup forward, Ecology will enter into a legal agreement called a consent decree with the parties responsible for cleanup—Rayonier A.M. Properties LLC and Rayonier Advanced Materials (collectively referred to as “RAMP” or “Rayonier”). The consent decree is a legal agreement that would require RAMP to carry out Ecology’s Interim Action Plan.
-
Draft Interim Action Plan (12.6 MB): Ecology’s proposed cleanup plan for the study area. It includes a schedule and cleanup requirements.
-
State Environmental Policy Act (SEPA) Determination of Non-Significance (2.4 MB): Ecology determined the proposed cleanup is not likely to cause significant environmental harm. We considered environmental, historical, and cultural factors in this process.
A fact sheet (1.6 MB) summarizing these documents is available to help guide your review. These documents and more information are also available at Ecology’s Rayonier Mill cleanup webpage.
After the public comment period, we will carefully consider and respond to comments. We will finalize the documents, including any changes based on public comments, then file with the Superior Court for entry as an Order. At that point, Rayonier will submit required cleanup plans to Ecology following the schedule outlined in the consent decree and Interim Action Plan.
Public Meeting and Open House
Ecology will host a public meeting and open house during the comment period to provide information, answer questions, and accept written comments.
Date: Tuesday, July 8, 2025
Time: 5:00 PM to 8:00 PM
- Presentation begins at 6:00 PM followed by a Q&A session
- Open house before and after the presentation
Location: Field Arts & Events Hall, Donna M. Morris Theater
201 W Front Street, Port Angeles, WA 98362
A recorded version of the presentation will be shared ahead of our July 8th event. We'll send an email with the link as soon as it's available.
Contact Information
For assistance or information regarding the public comment period:
For media inquiries:
Thank you for taking the time to provide us with your comments.
Best wishes,
|