SAFETY/UPPER MISSISSIPPI RIVER/ATON/SEC UMR BNM 0037-26

united states coast guard

MOR MM 114.3

THE MO PAC RR DRAWBRIDGE WILL BE UNABLE TO OPEN STARTING 0700 30MAR26 THRU 10APR26 AT 1700 DUE TO BRIDGE REPAIRS, INCLUDING THE REPLACEMENT OF THE LIFITING CABLES.

MARINERS ADVISED TO TRANSIT THE AREA WITH CAUTION.


BT