SAFETY/400 MILES SOUTH EAST OF NANTUCKET/CONSTRUCTION/CCGD1 BNM 0017-25
U.S. Coast Guard sent this bulletin at 03/25/2025 06:44 AM EDT
ORANGE MARINE WILL BE CONDUCTING CABLE REPAIR OPERATIONS ON ANJANA SUBMARINE CABLE SYSTEM WILL BE CONDUCTED BY C/S SOPHIE GERMAIN FROM MARCH 2, 2025, IN WORKING AREA DEFINED BY BELOW POSITIONS:
37-20.8539N, 064-24.6542W; 37-10.3741N, 064-8.7435W; 37-17.8731N,063-45.5115W; 37-30.6993N, 063-43.0950W.
DURING THIS OPERATION THE CABLE SHIP WILL BE ENGAGED IN SUBMARINE CABLE OPERATION, AND THEREFORE A WIDE BERTH OF 2 NM IS REQUESTED.
CANCEL AT//181000Z APR 25//
BT
