|
Wokingham Borough Connect
Upcoming roadworks
Barkham
Multi-way lights – Barkham Ride Barkham
These lights will be in place at the junction of Commonfield Lane from 18 to 21 April, 9.30am to 4pm. This is to allow Gigaclear to carry out installation of chamber in verge.
Charvil
Multi-way lights – Old Bath Road Charvil
These lights will be in place between Park Lane and Pipistrelle Lane on 17 April, 9.30am to 3.30pm. This is to allow Openreach safe access to underground structure to allow for gully works .
2-way lights – Old Bath Road Charvil
The lights will be in place between Park View Drive South and Gingells Farm Road from 18 to 19 April, 9.30am to 4pm to remove a post.
Earley
2-way lights – Church Road Earley
The lights will be in place between High Tree Drive and Palmerstone Road 17 April, 9.30am to 4pm. This is to adjust ironworks.
https://one.network/?GB133676247
Multi-way lights – Church Road Earley
These lights will be in place at the junction of Embery Way from 19 to 20 April to allow Thames Water to carry out remedial works in the carriageway.
Finchampstead
Multi-way lights – Nine Mile Ride Finchampstead
These lights will be in place at the junction with Whitehorse Lane from 14 to 18 April, 9.30am to 4pm. This is to allow Gigaclear to excavate to clear blocked duct.
Sindlesham
Multi-way lights – Mole Road Sindlesham
These lights will be in place at the junction of Mill Lane on 17 April, 9.30am to 4pm to adjust ironworks.
https://one.network/?GB133676539
Road Closure – Mole Road Sindlesham
The closure will be in place between Mill Lane and King Street Lane from 21 to 22 April, 8pm to 6am to carry out resurfacing remedial and ancillary works
Swallowfield
Road Closure – The Street Swallowfield
The closure will be in place between Trowes Lane and Basingstoke Road on 18 April, 8am to 6pm to carry out structural maintenance resurfacing and ancillary works.
Multi-way lights – Swallowfield Street Swallowfield
These lights will be in place at the junction with Basingstoke Road from 18 to 20 April, 10am to 4pm. This is to allow Gigaclear to carry out a chamber to install.
Three Mile Cross
Road Closure – Great Lea Three Mile Cross
The closure will be in place between Hartley Court Road and Mereoak Lane from 17 to 18 April, 8pm to 6am. This is to carry out remedial resurfacing.
https://one.network/?GB133306289
Winnersh
2-way lights – Robin Hood Lane Winnersh
The lights will be in place between Sherwood Road and Arbor Lane from 23 to 27 April, 7am to 6pm. This is to allow Thames Water to carry out a disconnection.
Wokingham
Road Closure – Seaford Road Wokingham
The closure will be in place between Westcott Road and Goodchild Road on 17 April, 9am to 3pm. This is to allow Thames Water to replace a defective manhole cover in the carriageway.
Multi-way lights – London Road Wokingham
These lights will be in place between Rances Lane and Binfield Road from 17 to 18 April, 9.30am to 3.30pm. This is to allow Openreach to replace a pole.
https://one.network/?GB132821152
Road Closure – Wiltshire Road Wokingham
The closure will be in place between Rectory Road and Peach Street from 17 to 18 April, 8am to 6pm to carry out resurfacing remedial and ancillary works.
https://one.network/?GB133306339
Road Closure – Rectory Road Wokingham
The closure will be in place between Shute End and Wiltshire Road from 18 to 19 April, 8pm to 6am to carry out resurfacing remedials and ancillary works.
Road Closure – Shute End Wokingham
The closure will be in place between Station Road and Rectory Road from 19 to 20 April, 8pm to 6am to carry out resurfacing remedial works.
Road Closure – Easthampstead Road Wokingham
The closure will be in place between Peach Street to Denton Road from 20 to 21 April, 8pm to 6am to carry out resurfacing remedial and ancillary works.
https://one.network/?GB133306449
Multi-way lights – Molly Millars Lane Wokingham
These lights will be in place between Oaklands Drive and Barkham Road from 17 to 20 April, 9.30am to 4pm. This is to allow Virgin Media to clear blockage in footway.
Woodley
Multi-way lights – Miles Way Woodley
These lights will be in place at the junction of Hawker Way on 14 April, 9.30am to 4pm. This is to carry out a carriageway patch.
https://one.network/?GB133692000
Multi-way lights – Loddon Bridge Road Woodley
These lights will be in place at the junction of The Ridgeway from 17 to 28 April, 8am to 6pm. This is to allow The Electricity Network Company Ltd to carry out excavation works.
Multi-way lights – Miles Way Woodley
These lights will be in place at the junction of The Bader Way from 17 to 18 April, 9.30am to 4pm to replace posts and chevrons.
Multi-way lights – Western Avenue Woodley
These lights will be in place at the junction of Butts Hill Road from 23 April to 9 May, 7.30am to 4.30pm. This is to allow SGN to carry out gas main connection.
Keeping up to date
- For planned and emergency roadworks, follow our Twitter and Facebook pages
- To find out about roadworks near you, visit One.network
- For active and sustainable travel, including events, training and resources, visit MyJourney Wokingham
- Visit our major new roads page for plans and updates
- For information on re-surfacing and reactive carriageway repairs visit our pothole and road repairs page
-
You can report any issues with roads and streets online, including street lights, problems with traffic lights, potholes, damaged street furniture, problems with road markings and removal of dead animals.
- On our parking and permits page, you can find information including car parks and costs around the borough, resident parking permits, park and ride services and appealing a parking fine.
- Our transport and travel page includes information on applying for a senior citizen or disabled person's bus and train pass and local public transport information.
- The blue parking badges page has information on applying for, using, replacing and returning your blue badge.
|
|
|
|