Your Southsea Coastal Scheme update
|
|
3 October 2026
|
|
|
 Our promenade on Speakers' Corner to South Parade Pier (Frontage 5 East) is nearly complete, and we've continued making good progress over the last fortnight.
Of the 116 concrete promenade slabs on this frontage, 104 have now been poured. The remaining slabs are expected to take around two weeks to complete, with work currently planned for the end of November. These slabs are located in the middle of the frontage, which has been used as a temporary access ramp for plant machinery.
|
|
|
The pre-cast unit installation on Frontage 5 East is almost complete! Just a small middle section is left to complete. As mentioned above, we have been using this section as a ramp for our plant to travel up and down to each level whilst installing units and pouring concrete. Now we have broken out this temporary ramp we are preparing the area for the placement of the final pre-cast concrete units.
|
|
|
If you have travelled along South Parade in the last week or two, you will have noticed that it is looking lovely and green!
We have been busy installing a beautiful array of planting with species which are happy in coastal environments.
In total on Frontage 5 East, once planting is complete, we will have installed 4,696 plants!
|
|
We have now completed all concrete seating on Frontage 5 East, including table benches, lounger benches and larger viewing benches by the pier and steps. Together, these provide seating for dozens of people, with more seating currently being manufactured off site and due to be installed shortly, including integrated planter benches and cube seats.
In short, there will be plenty of places to sit and enjoy the seafront. All concrete bench bases will later be clad in timber.
|
Come and talk to us about the next phase of the Southsea Coastal Scheme, from South Parade Pier to St. George's Road.
Our team will be at CourtX in Southsea to share information about upcoming work and answer any questions you may have.
Visit us on:
- Thursday 23 October, 2pm to 7pm
- Friday 24 October, 12 noon to 5pm
We look forward to seeing you there.
|
|
A colourful new public artwork has been installed on by the Clarence Pier car park as part of the Navigate public art programme, linked to the Southsea Coastal Scheme.
Created by artist Flora Duley and shaped through community workshops, Call For Play features ten playful sculptures inspired by Portsmouth’s seaside heritage and designed to encourage people to explore and interact with the promenade
|
There’s still time to share your views on the use of BBQs and amplified music in Southsea’s seafront spaces, but the consultation closes on 11 October.
Whether you use Southsea Common, Canoe Lake or Castle Field regularly, or simply visit from time to time, now is your chance to help shape future discussions about how these popular spaces are managed.
|
|
|