- Tuesday 1 September - Monday 14 September: road closure in Harrow Road at the junction of Middleton Boulevard for Cadent Gas works
- Thursday 3 September - Friday 25 September: parking bay suspension and road closure in Beeston Road and University Boulevard between Lace Street and university south entrance for carriageway resurfacing works
- Monday 7 September - Tuesday 15 September: lane closure outside the car park in North Church Street for National Grid works
- Monday 7 September - Thursday 17 September: road closure and parking suspension in Hucknall Road between Bestwood Road and Southglade Road for carriageway works
- Monday 7 September - Friday 25 September: road closure and parking bay suspension on the junction of Sneinton Boulevard, Colwick Road, Meadow Lane and Sneinton Heritage for resurfacing works
- Monday 7 September - Friday 2 October: 24-hour rolling lane closure in Wollaton Road between Middleton Boulevard and Eton Grove for Cadent Gas works
- Thursday 10 September - Monday 14 September: urgent lane closure in Shakespeare Street opposite South Sherwood Street to opposite North Sherwood Street for National Grid works
- Friday 11 September - Sunday 13 September: road closures and parking suspensions in Gill Street, Hampden Street, Dryden Street, Peel Street and Clarendon Street to facilitate the continuous flow of traffic through the city centre during the universities' main arrivals weekend
- Friday 11 September - Sunday 13 September: parking bay suspension and lane closure between Wollaton Street and Clarendon Street for student arrivals
- Saturday 12 September - Monday 14 September: road closure 20m either side of the level crossing in St Albans Road for Network Rail track works
- Monday 14 September - Friday 18 September: three-way signals in Highbury Road with pedestrian crossing between Main Street and Church Lane for removal of vegetation over railway bridge
- Friday 18 September: two-way signals in Bramcote Lane between Kevin Road and Woodbank Drive for highways works
- Friday 18 September: two-way temporary signals in Carlton Road between Linnell Street and Alma Road for tree maintenance works
- Sunday 20 September: parking bay suspension and road closure in Wilford Lane between Ashdown Close and the Wilford Lane tram stop for Severn Trent works
- Monday 21 September - Wednesday 30 September: road closures and parking bay suspensions in High Church Street for new National Grid electricity sub station installation
- Monday 21 September: road closure in Beechdale Road between Robins Wood Road and Bathurst Drive for highways works
- Wednesday 23 September - Thursday 24 September: lane closure in Queens Drive on the approach to the traffic light junction of Electric Avenue for Severn Trent works
- Monday 28 September - Friday 23 October: 24-hour rolling lane closure in Middleton Avenue between Fairham Drive and Wemyss Gardens for Cadent Gas works
- Wednesday 30 September - Saturday 3 October: 24-hour two-way temporary lights in Woodborough Road between Westville Gardens and St Ann's Hill for National Grid works
- Ongoing works as part of the Streets for People and Highways Planned Maintenance programmes.
- Check out the Highways Map on the website here. Â
Initial works started on Wednesday (9 September) as Homes England makes preparations to demolish the former NCP car park in Maid Marian Way.
The demolition programme is a vital step in clearing the way for the once-in-a-generation transformation of Broad Marsh, which will create new homes, workspaces and public spaces in the heart of the city.
It builds on the progress already made around the site, including the new Nottingham College hub, Central Library, bus station and Green Heart public realm. It comes as Homes England continues its search for a development partner and brings forward meanwhile uses to activate the site.
Works will include:
- Lane closures at the Castle Gate junction (lane two northbound and lane three southbound)
- Temporary four-way signals at the southern junction with Canal Street, Wilford Street and Castle Boulevard. Some pavements will be temporarily unavailable, but pedestrians will still be able to navigate the area. Cycle lanes will remain open, although cyclists will be asked to dismount for a short distance through the works
From the end of September, a contraflow system will be in place which will see traffic diverted from one side of Maid Marian Way to the other while the section of the car park that sits above the road is brought down.
Vehicles will initially move on to the northbound side of the road close to St Nicâs Church where a single lane will operate in each direction. From early to mid-November, this will switch to the southbound side of the road to allow demolition work to complete on the remainder of the NCP car park, and for works to start on the former college site.
A short period of highway reinstatement works will be carried out from the end of November to the start of December, when Maid Marian Way will fully reopen ahead of the Christmas period.
Bus stops in the immediate vicinity may be subject to temporary suspensions during the works, so customers are advised to check with their transport provider.
Get the latest via Homes England
Essential reconstruction and resurfacing works will be taking place on the inbound A60 Mansfield Road from next week.
The stretch affected is between the Goose Fair Island and Mapperley Road / Forest Road East.
As part of the scheme funded by the East Midlands Combined County Authority, and delivered by Nottingham City Council, overnight roadworks will take place from Monday (14) until Friday 25 September.
The road will be closed between 8pm and 6am while the improvements are carried out. There will be no works on the nights of Saturday 19 and Sunday 20 September, and the scheme is expected to be completed by 6am on Friday 25 September.
During the closures, a diversion route along Gregory Boulevard, Alfreton Road, through the city centre via Upper Parliament Street, South Sherwood Street and Mansfield Road will be in place. Outbound traffic will not be affected however there will be lane restrictions in place alongside the works area.
Bus services into the city will be following diversion routes, therefore bus stops FO07, FO08, FO09, FO10, J1 and G3 will not be in operation during the hours stated. Outbound services are not affected.
Read more here
A seven-week programme of works to improve bus reliability in Meadows Way started on Monday (7 September).
The works, at the junction of Meadows Way, Bathley Street and Arkwright Street, will reduce congestion, improve journey times and enhance facilities for pedestrians and cyclists while maintaining the benefits already delivered for local bus services.Â
Nottingham City Council has secured funding from the Department for Transport to support the Greater Nottingham Bus Service Improvement Plan which aims to:
- improve the reliability and punctuality of local bus services
- encourage increased use of buses, which are key to providing access to jobs and opportunities, supporting local businesses and new housing developments
- reduce congestion on the road network.
Meadows Way is a very busy bus route and buses are experiencing delays heading towards the city centre.
To enable the works to be completed as quickly and safely as possible, Bathley Street is now closed at its junction with Arkwright Street for approximately seven weeks. A signed diversion route will be in place throughout the closure period.
Read more here
The East Midlands Combined County Authority (EMCCA) has announced that Queen's Drive park-and-ride will close this weekend.
The closure, which is to allow National Grid works, will affect NCTâs 49 service to Nottingham city centre. The site is expected to reopen at 6am on Monday. Please plan ahead and allow extra time for your journey where necessary.
National Highways is continuing to prepare for its A52 Nottingham junctions scheme, which will deliver major improvements at Wheatcroft and Nottingham Knight.
To enable the main construction works, utility companies started diverting services at Wheatcroft junction on Monday (7 September). These works are expected to continue for around three months with lane closures in place from Monday to Friday.
Here's what's happening:
- Monday 21 September (8am) to Friday 25 September (6pm): A section of Flawforth Lane where it joins the A52 at Wheatcroft Junction will be fully closed.
- Friday 25 September to Monday 28 September, 8pm to 6am each night: Part of the A52 (Gamston Link Road) at Wheatcroft Junction will be closed overnight. The road will reopen during the day between closures.
Signed diversion routes will be in place.
Traffic management, including lane closures and a temporary 40mph speed limit, will also be in place on sections of the A52 while work is carried out.
Improvements are being made to Sneinton Hermitage and the Colwick Road bus corridor.
These works are designed to improve bus reliability, make stops more accessible for passengers and help reduce congestion at known traffic bottlenecks along the route.
To carry out the works safely, temporary traffic lights will be in operation during parts of the programme and some on-street parking will need to be suspended temporarily in specific locations while construction is taking place.
Access for residents, businesses and pedestrians will be maintained throughout the works wherever possible, and all traffic movements will continue to be accommodated.
Works started on Monday 24 August and are expected to take around six weeks to complete.
Read more about the improvements here...
Travelling by train?
- Latest Travel updates and planned engineering works from East Midlands trains
- Sunday 13 September: buses replace morning East Midlands Railway services in the Nottingham area. More here
- Sunday 13 September: amended East Midlands Railway services to, from and via London St Pancras, affecting Nottingham. More here
- Monday 14 September - Friday 18 September: amended late-night and early-morning East Midlands Railway services to and from London St Pancras, affecting Nottingham. More here
Â
Service information
|