Construction of a single storey rear extension which would extend beyond the rear wall of the original house by 5m, for which the maximum height would be 2.8m and for which the height of the eaves would be 2.8m. | Date Decided: 18/04/2024
T1 Ash; sectional fell to ground level. T1 is showing early stages of Ash Die-back with die back in the crown. T1 has not been able to mature as has been overshadowed and out-competed by the adjacent larger trees, it also has been compromised at the base with a cavity developing.T2 Ash; sectional fell to ground level. T2 is showing onset stage of Ash Die-back, with die-back in the crown and stress related growth. | Date Decided: 18/04/2024
Erection of 7 dwellings, through the demolition and conversion of existing barns and construction of new dwellings and associated works. | Date Decided: 17/04/2024
General agricultural building for storage of machinery and fodder, steel portal frame building with Yorkshire boarding and concrete panels. | Date Decided: 17/04/2024
Proposed new roof dormer to East (front) elevation, proposed new side facing first floor window, and new roof-light on North elevation, new side facing roof-light on south elevation (roof). | Date Decided: 17/04/2024
Removal of condition no.4 (Agricultural Occupancy Condition) from planning permission 83/P1768 - Change Of Use To Agricultural Contractor's Depot. Following approved 23/1793/CPE, The condition needs to be removed to allow the dwelling to be occupied as an unrestricted C3 dwelling | Date Decided: 17/04/2024
Construction of four commercial, business and service units (Class E) and nine dwellings with associated access, parking and infrastructure | Date Decided: 16/04/2024
Internal re-organisation of farmhouse including: Ground floor: Relocation of kitchen and dining room. Enlarge window on side (west) elevation to form patio door. Remove horizontal ceilings to Kitchen and install rooflight on East elevation. First Floor: Remove sub-division of end bedroom (6). Create new bathroom and ensuite shower room. | Date Decided: 16/04/2024
Remedial works for repair of wall and re-rendering. Replacing cracked shopfront window pane. Repairing and replacing cracked and splintered timbers of window frame, plinth block and pilaster | Date Decided: 16/04/2024
Eyre Court Hotel 2 Queen StreetSeatonDevonEX12 2NY
Construction of single storey front extension and demolition of bay window to be replaced with bi-fold lobby on south-east elevation. | Date Decided: 15/04/2024
Listed building consent for rear extension (part two storey, part one storey) with replacement of 1980s link section, creation of new entrance, replacement fenestration to 1980s element, building and installation of eco plant room to house low carbon heating system and renewable technologies. Replacement rendering to old cottage and improved drainage. | Date Decided: 15/04/2024
Rear extension (part two storey, part one storey) with replacement of 1980s link section, creation of new entrance, replacement fenestration to 1980s element, building and installation of eco plant room to house low carbon heating system and renewable technologies. Replacement rendering to old cottage and improved drainage. | Date Decided: 15/04/2024
Sycamore: shorten back on south side by approximately 2m. Reason - to leave a more balanced form.Ash: reduce height and side branches by approximately 2-3m to a suitable side branch. Reason - to relieve weight and lessen the likelihood of branch breakage.Elm: remove to as near ground level as possible. Reason - dying. | Date Decided: 15/04/2024
Installation of 6 CCTV Cameras located externally around all four elevations of the Minster Church, and an aerial fitted to the parapet on the south side, with associated works. | Date Decided: 12/04/2024