Proposed hip to gable in rear part of roof. Small Dormer off north facing side of roof. Installation of balcony off rear and cladding for insulation and protection of property. | Date Decided: 22/06/2023
2 Brook Meadow High StreetNewton PopplefordEX10 0EQ
Proposed link single garage conversion incorporating addition of enlarged pitched roof (revision to planning permission 23/0565/FUL) | Date Decided: 22/06/2023
Change of use from former barn/garage with pottery/artist studio above to classroom/workshop for pottery/art classes with permanent pottery/art studio above. | Date Decided: 22/06/2023
Mature Scots pine2 lowest 1st order branches on the south side that appear to be dead, remove both branches1st order branch emanating just below the main bifurcation on the south side, and giving rise to pendulous branches that overhang the neighbouring garden, reduce the extent of second and third order branches overhanging the neighbouring garden by approximately 1.5m, to suitable growth points 1st order branch on the west side just also emanating just below the main bifurcation, remove deadwood but retain all the live growth | Date Decided: 21/06/2023
Partial reserved matters application (layout, scale, appearance and landscaping) pursuant to outline planning permission 14/0330/MOUT for 32 houses, 24 apartments (with bin and cycle stores), a fibre cabinet associated roads and parking | Date Decided: 21/06/2023
Proposed single storey rear extension, internal alterations and conversion of attic space to form bedroom and bathroom, with the addition of one dormer window and three rooflights | Date Decided: 21/06/2023
Repairs to roof and walls of outbuilding. Build new roof structure. Replace broken tiles with reclaimed. Rebuild collapsed stone walls and make good other walls using lime mortar. Replace rotten timber with black-painted, feather-edge boarding. | Date Decided: 21/06/2023
Repairs to roof and walls of outbuilding; build new roof structure; replace broken tiles with reclaimed; rebuild collapsed stone walls and make good other walls using lime mortar; replace rotten timber with black-painted, feather-edge boarding | Date Decided: 21/06/2023
Erection of a summer house to side. Erection of 6ft fence to north and east of pedestrian access gate on east side. Construction of wooden access steps from footpath to adjacent garden. | Date Decided: 20/06/2023
Proposed deck to the front with modified access, demolition of the existing conservatory to the rear, external fenestration alterations and internal alterations to the layout. | Date Decided: 20/06/2023
Proposed development of an outbuilding incidental to the enjoyment of the dwellinghouse at Southdown House. The Proposed outbuilding corresponds with the parameters for permitted development laid out within Schedule 2 Part 1 Class E of the Town and Country Planning (General Permitted Development) (England) Order 2015. | Date Decided: 20/06/2023
Redevelopment for 54 retirement living apartments and 6 retirement living cottages, including communal facilities, access, car parking and landscaping and 178sqm of commercial use (Class E) | Date Decided: 20/06/2023
T1: lime - shorten back over neighbour's roof, leaving 2m clearance. Reduce and re-shape by approximately 1m to leave a natural form by pruning to second order branches. | Date Decided: 20/06/2023
Replacement dwelling and removal of existing garage roof with a low flat roof replacement. (re-submission of alterations and extensions scheme 22/1732/FUL as new build). | Date Decided: 19/06/2023
Variation of condition no. 7 (approved planning permission 12/2444/VAR to allow independent occupation of holiday accommodation and alternative access arrangements) to increase the number of holiday units on the site. | Date Decided: 19/06/2023
Construction and operation of a ground mounted solar farm, with permission being required for 40 years, comprising solar arrays, equipment housing, sub-station, fencing, ancillary equipment, landscaping and associated development | Date Decided: 16/06/2023
Replacement of three windows and two doors, application of external cladding and installation of wood-burning stove and flue. | Date Decided: 16/06/2023
T1: Oak - reduce side lateral limbs to give approximately 3m clearance to house and to reduce overhang of room. Reduce 3 lowest limbs, at same height, reducing by approximately 2m lengths, diameter cuts of up to 7cm. Reduce tips of limbs above by approximately 1.5m with diameter cuts of 5cm. T2: Oak - reduce 2 lowest over-extending limbs by 2m with cut diameters of up to 6cm.T3: Oak - reduction of small lowest limb by 20mm; cut diameters up to 50mm. | Date Decided: 16/06/2023