I-35 from FM 3009 to FM 1518
Southbound
- Through Saturday, January 25, 2025, long-term closure (24/7). Right lane closure on the southbound frontage road of I-35 from FM 3009 to Schertz Parkway for roadway work.
I-35 from FM 1518 to Loop 1604
Northbound
- Through Saturday, August 2, 2025, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for construction work.
- Through Monday, May 5, 2025, long-term closure (24/7). Exit ramp closure on northbound I-35 to Evans Road for construction work.
Southbound
- Through Sunday, May 25, 2025, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure on westbound I-35 collector ramp and northbound I-35 to westbound Loop 1604 connector ramp, full closure on southbound I-35 to westbound Loop 1604 connector ramp, full closure on eastbound frontage road from entrance ramp to IKEA-RBFCU Parkway and full closure of northbound and southbound lanes of IKEA-RBFCU Parkway at Loop 1604, exit ramp closure to Olympia Parkway for deck, overhangs, column work.
Loop 1604 from I-35 Interchange to Nacogdoches Road
Eastbound
- Through Monday, March 31, 2025, long-term closure (24/7). Left lane closure on eastbound frontage road of Loop 1604 from Lookout Road to IKEA-RBFCU Boulevard for construction.
I-35 from Loop 1604 to Toepperwein Road
Northbound
- Through Monday, February 3, 2025, long-term closure (24/7). Full closure on I-35 northbound collector exit ramp and left lane closure on I-35 northbound frontage road from Pat Booker Road to Loop 1604 for bridge work.
- Through Monday, February 3, 2025, long-term closure (24/7). Entrance ramp closure from Shin Oak Drive to Pat Booker Road for bridge work.
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple mainlane closures (3) on northbound I-35, multiple lane closures (2) on northbound I-35 frontage road and exit ramp closure from Toepperwein Road to Pat Booker Road for drilled shaft, column, and cap work.
Southbound
- Through Monday, June 30, 2025, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure from Pat Booker Road to Toepperwein Road for bridge deck work.
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Shin Oak Drive to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
I-35 from Toepperwein Road to O’Connor Road
Northbound
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, exit ramp closure and entrance ramp closure from O’Connor Road to Judson Road for drilled shaft, column, and cap work.
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes, multiple lane closures (2) on northbound I-35 frontage road and exit ramp closure from Judson Road to Toepperwein Road for drilled shaft, column, and cap work.
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road and exit ramp from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, and entrance ramp from O’Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
Southbound
- Through Friday, January 3, 2025, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Crownpoint Drive for construction work.
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure from Toepperwein Road to Judson Road for bridge deck work.
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure from Judson Road to O’Connor Road for drilled shaft, column, and cap work.
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
I-35 from O’Connor Road to Thousand Oaks Drive
Northbound
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, alternating lane closures (2) on northbound I-35 frontage road and exit ramp closure from Thousand Oaks Drive to Weidner Road for drainage and drilled shaft work.
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, multiple lane closures (2) of northbound I-35 frontage road, entrance ramp closure, and exit ramp closure from Weidner Road to O’Connor Road for drainage and drilled shaft work.
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road, entrance ramp, and exit ramp from Starlight Terrace to Weidner Road, southbound to northbound turnaround at I-35 and Starlight Terrace intersection, northbound to southbound turnaround at I-35 and Weidner Road intersection for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
Southbound
- Through Saturday, January 25, 2025, long-term closure (24/7). Right lane closure on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for bridge work.
- Through Thursday, May 22, 2025, long-term closure (24/7). Entrance ramp closure on southbound I-35 from O’Connor Road for bridge work.
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for drilled shaft, column, and cap work.
- Sunday, December 22, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure from Weidner Road to Thousand Oaks Drive for drainage and drilled shaft work.
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from O’Connor Road to Tech Com Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Tech Com Drive to Weidner Road for cap form erection work. Accommodations will be made for local traffic. Traffic should follow detour signs.
I-35 from Thousand Oaks Drive to I-410 North Interchange
Northbound
- Through Tuesday, January 28, 2025, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Randolph Boulevard to Starlight Terrace for bridge work.
Southbound
- Through Tuesday, April 1, 2025, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
- Through Saturday, February 1, 2025, long-term closure (24/7). Southbound to northbound turnaround closure at Thousand Oaks for construction work.
I-410 North Interchange
Northbound
- Sunday, December 22, 9 p.m. to 5 a.m. Full closure of eastbound I-410 connector ramp to northbound I-35 mainlanes for cap work. Traffic should follow detour signs.
I-410 North from I-35 Interchange to Starcrest Drive
Westbound
- Through Tuesday, April 1, 2025, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
I-35 from I-410 North Interchange to Walzem Road
Northbound
- Sunday, December 15, until Saturday, December 21, 9 p.m. to 7 a.m. Southbound to northbound turnaround closure at Walzem Road and I-35, alternating lane closures (2) on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for cap work. Traffic should follow detour signs.
Southbound
- Sunday, December 15, until Saturday, December 21, 9 p.m. to 5 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Walzem Road for deck work. Traffic should follow detour signs.
- Monday, December 16, until Saturday, December 21, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Randolph Boulevard to Fratt Road and full closure of Randolph Boulevard at I-35 intersection for drilled shaft work. Traffic should follow detour signs.
I-35 from Walzem Road to Eisenhauer Road
Northbound
- Friday, December 27, 11 p.m. to 7 a.m. Alternating lane closures (2) on northbound I-35 frontage road from Eisenhauer Road to Galahad Drive for utility work.
- Friday, December 27, 11 p.m. to 7 a.m. Exit ramp closure on northbound I-35 mainlanes to Walzem Road for drilled shaft work. Traffic should use prior exit ramp.
- Friday, December 27, 11 p.m. to 7 a.m. Multiple lane closures (2) on northbound I-35 frontage road from Eisenhauer Road to Galahad Drive for drilled shaft work.
- Saturday, December 28, 9 p.m. to 8 a.m. Exit ramp closure on northbound I-35 mainlanes to Walzem Road for drilled shaft work. Traffic should use prior exit ramp.
- Saturday, December 28, 9 p.m. to 8 a.m. Multiple lane closures (2) on northbound I-35 frontage road from Eisenhauer Road to Galahad Drive for drilled shaft work.
OTHER LANE CLOSURES
- For your information, there are other lane closures underway within the I-35 NEX project this week, but they are not expected to affect traffic or create notable delays.
|