I-35 from FM 3009 to FM 1518
Southbound
- Through Saturday, December 7, long-term closure (24/7). Right lane closure on the southbound frontage road of I-35 from Pawlin Drive to Corporate Drive for roadway work.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes, entrance ramp closure, and exit ramp closure of I-35 from Roy Richard Drive (FM 3009) to Schertz Parkway for paving and barrier work. Traffic should use next entrance and exit ramps.
- Monday, November 4, 9 p.m. to 5 a.m. Left lane closure on southbound mainlanes of I-35 from Tri County Parkway to Alamo Parkway for illumination repairs.
I-35 from FM 1518 to Loop 1604
Northbound
- Through Saturday, August 2, 2025, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for construction work.
- Through Sunday, December 8, long-term closure (24/7). Right lane closure on northbound mainlanes of I-35 at Forum Parkway for construction work.
- Through Sunday, December 8, long-term closure (24/7). Right lane closure on northbound exit ramp and left lane closure on northbound frontage road from Forum Access Road to Olympia Parkway for construction work.
- Through Monday, May 5, 2025, long-term closure (24/7). Exit ramp closure on northbound I-35 to Evans Road for construction work.
- Sunday, November 3, until Friday, November 8, 9 p.m. to 5 a.m. Full closure on westbound frontage road of Loop 1604 at Agora Parkway to northbound frontage road I-35 at Forum Access, full closure of northbound collector and full closure of Forum Parkway intersection on I-35 for structures work, traffic should follow detour signs.
- Sunday, November 3, until Friday, November 8, 9 p.m. to 5 a.m. Full closure on westbound frontage road of Loop 1604 at Agora Parkway to northbound frontage road I-35 at Olympia Parkway for bridge structure work. Traffic should follow detours.
- Sunday, November 3, until Saturday, November 9, 8 p.m. to 5 a.m. Full closure of northbound frontage road and exit ramp closure of I-35 from Forum Parkway to Olympia Parkway for column cap work. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for bridge cap and column work. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramps and entrance ramp closure of I-35 from Forum Parkway to Evans Road for bridge structure work. Traffic should use next entrance and exit ramp.
- Monday, November 4, until Thursday, November 7, 9 p.m. to 5 a.m. Full closure on westbound frontage road of Loop 1604 at Agora Parkway to northbound frontage road I-35 at Olympia Parkway for bridge structure work. Traffic should follow detour signs.
Southbound
- Through Sunday, May 25, 2025, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
- Sunday, November 3, until Friday, November 8, 8 p.m. to 6 a.m. Multiple lane closures (3) on southbound mainlanes and multiple entrance ramp closures of I-35 from Olympia Parkway to Forum Parkway for base repair, milling and overlay operations.
- Sunday, November 3, until Wednesday, November 6, 9 p.m. to 5 a.m. Full closure of southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge deck work. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Corporate Drive to Evans Road and full closure of eastbound and westbound lanes of Evans Road at I-35 for bridge structure work. Traffic should follow detour signs.
- Sunday, November 3, until Tuesday, November 5, 9 p.m. to 5 a.m. Full closure on southbound frontage road, exit ramp closure of I-35 from Evans Road to Arcadia Drive, full closure of northbound to southbound turnaround at Evans Road at I-35 and full closure on the westbound lanes on Evans Road at I-35 for bridge column and cap work. Traffic should follow detour signs.
- Sunday, November 3, until Wednesday, November 6, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping, barrier, temporary pavement, and demolition works. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Schertz Parkway to Forum Parkway for bridge structure work.
- Sunday, November 3, until Thursday, November 7, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for striping, and barrier work. Traffic should follow detour signs.
- Sunday, November 3, until Thursday, November 7, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for striping and barrier work. Traffic should follow detour signs.
- Monday, November 4, until Thursday, November 7, 9 p.m. to 6 a.m. Full closure on southbound frontage road, exit ramp closure of I-35 from Evans Road to Arcadia Drive, full closure of northbound to southbound turnaround at Evans Road, and full closure of westbound lanes of Evans Road at I-35 for beam setting. Traffic should follow detour signs.
- Monday, November 4, until Thursday, November 7, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Forum Parkway to McMorris Boulevard for bridge structure work.
- Tuesday, November 5, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure on southbound I-35 collector distributor to Loop 1604 and full closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge column and cap work. Traffic should follow detour signs.
- Wednesday, November 6, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Forum Parkway and full closure on westbound frontage Loop 1604 to northbound frontage I-35 at Forum Parkway for bridge structure work. Traffic should follow detour signs.
- Thursday, November 7, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure on southbound frontage road, entrance ramp, and exit ramp closure of I-35 from Corporate Drive to Schertz Parkway and southbound to northbound turnaround at Corporate Drive for bridge substructure work. Traffic should follow detour signs.
- Thursday, November 7, until Saturday, November 9, 8 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge structure, striping and barrier work.
I-35 and Loop 1604 Interchange
Northbound
- Sunday, November 3, until Wednesday, November 6, 9 p.m. to 5 a.m. Full closure of westbound Loop 1604 connector ramp to northbound I-35 for bridge structure work. Traffic should follow detour signs.
- Sunday, November 3, until Thursday, November 7, 9 p.m. to 5 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
- Sunday, November 3, until Wednesday, November 6, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 connector ramp to northbound I-35 for bridge substructure work. Traffic should follow detour signs.
- Monday, November 4, until Thursday, November 7, 9 p.m. to 5 a.m. Full closure on westbound I-35 collector ramp at the Loop 1604 interchange, full closure on northbound I-35 to westbound Loop 1604 connector ramp, full closure on southbound I-35 to westbound Loop 1604 connector ramp, and full closure of northbound and southbound lanes of IKEA-RBFCU Parkway at Loop 1604 for bridge structure work. Traffic should follow detour signs.
- Monday, November 4, until Wednesday, November 6, 9 p.m. to 5 a.m. Full closure on westbound I-35 collector ramp at the Loop 1604 interchange and full closure on northbound I-35 to westbound Loop 1604 connector ramp for bridge structure work. Traffic should follow detour signs.
- Monday, November 4, until Thursday, November 7, 9 p.m. to 5 a.m. Full closure of northbound I-35 collector ramp at the Loop 1604 interchange for drilled shaft work. Traffic should follow detour signs.
Southbound
- Sunday, November 3, until Saturday, November 9, 8 p.m. to 6 a.m. Full closure on southbound frontage road from Arcadia Drive to Olympia Parkway, entrance ramp closure at Old Austin Road, full closure on westbound I-35 collector ramp and northbound I-35 to westbound Loop 1604 connector ramp, full closure on southbound I-35 to westbound Loop 1604 connector ramp, full closure on eastbound frontage road from entrance ramp to IKEA-RBFCU Parkway and full closure of northbound and southbound lanes of IKEA-RBFCU Parkway at Loop 1604 for deck, overhangs, column work. Traffic should follow detour signs.
- Sunday, November 3, until Thursday, November 7, 9 p.m. to 5 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for wall demolition, and bridge structure work. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure on southbound I-35 to westbound Loop 1604 connector ramp closure for drainage, striping and barrier work. Traffic should follow detour signs.
- Sunday, November 3, until Tuesday, November 5, 8 a.m. to 6 p.m. Full closure on eastbound collector ramp of Loop 1604 at I-35 interchange and full closure of southbound I-35 connector ramp to eastbound Loop 1604 for steel girder work. Traffic should follow detour signs.
- Monday, November 4, until Thursday, November 7, 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 collector ramp at I-35 interchange and full closure on southbound I-35 to eastbound Loop 1604 connector ramp for barrier work. Traffic should follow detour signs.
- Monday, November 4, until Wednesday, November 6, 9 p.m. to 5 a.m. Full closure on southbound collector ramp of I-35 at the Loop 1604 interchange for column and cap work. Traffic should follow detour signs.
- Tuesday, November 5, until Thursday, November 7, 9 p.m. to 6 a.m. Full closure on southbound frontage road, exit ramp closure of I-35 from Evans Road to Arcadia Drive, full closure on northbound to southbound turnaround at Evans Road and a full closure on the westbound lanes on Evans Road at I-35 for cap setting. Traffic should follow detour signs.
- Tuesday, November 5, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 to southbound I-35 connector ramp for wall demolition and curb, sidewalk, and pavement work. Traffic should follow detour signs.
- Wednesday, November 6, until Saturday, November 9, 8 p.m. to 6 a.m. Full closure on eastbound mainlanes of Loop 1604 at I-35 interchange, full closure on eastbound collector ramps of Loop 1604 at I-35 interchange and full closure of southbound I-35 connector ramp to eastbound Loop 1604 for steel girder work. Traffic should follow detour signs.
- Thursday, November 7, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure of westbound Loop 1604 connector ramp to southbound I-35 for bridge structure work. Traffic should follow detour signs.
Loop 1604 from I-35 Interchange to Nacogdoches Road
Eastbound
- Through Monday, March 31, 2025, long-term closure (24/7). Left lane closure on eastbound frontage road of Loop 1604 from Lookout Road to IKEA-RBFCU Boulevard for construction.
- Monday, November 4, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure of Lookout Road intersection and turnarounds at Loop 1604 for bridge deck work. Traffic should follow detour signs.
- Monday, November 4, until Friday, November 8, 9 p.m. to 5 a.m. Alternating lane closures on eastbound mainlanes of Loop 1604 from Nacogdoches Road to Pat Booker Road for bridge column work.
- Monday, November 4, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on eastbound Loop 1604 connector ramps to I-35 and entrance ramp closure of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for bridge structure work. Traffic should follow detour signs.
- Monday, November 4, until Friday, November 8, 9 p.m. to 5 a.m. Full closure on eastbound mainlanes of Loop 1604 from Union Pacific Railroad to Pat Booker Road for bridge deck work. Traffic should follow detour signs.
Westbound
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for bridge deck work. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Alternating lane closures on westbound mainlanes of Loop 1604 from Pat Booker Road to Nacogdoches Road for bridge deck and barrier work.
- Monday, November 4, until Wednesday, November 6, 9 p.m. to 5 a.m. Full closure on westbound mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for cap and column work. Traffic should follow detour signs.
- Sunday, November 3, until Wednesday, November 6, 8 p.m. to 6 a.m. Full closure on westbound mainlanes of Loop 1604 at I-35 for welding works at steel girders. Traffic should follow detour signs.
I-35 from Loop 1604 to Toepperwein Road
Northbound
- Through Monday, February 3, 2025, long-term closure (24/7). Full closure on I-35 northbound collector exit ramp and left lane closure on I-35 northbound frontage road from Pat Booker Road to Loop 1604 for bridge work.
- Through Monday, February 3, 2025, long-term closure (24/7). Entrance ramp closure from Shin Oak Drive to Pat Booker Road for bridge work.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes, exit ramp closure of I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge structure work. Traffic should use next exit and entrance ramps.
- Sunday, November 3, until Friday, November 8, 9 p.m. to 5 a.m. Full closure on northbound frontage road of I-35 from Shin Oak Drive to Pat Booker Road for drill shaft work. Traffic should follow detour signs.
- Sunday, November 3, 9 p.m. to 5 a.m. Full closure of I-35 Access Road bridge near Shin Oak Drive at I-35 for bridge deck work. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure of northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Pat Booker Road to Loop 1604 for bridge structure work. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple mainlane closures (3) on northbound I-35, multiple lane closures (2) northbound I-35 frontage road and exit ramp closure of I-35 from Toepperwein Road to Pat Booker Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should use next entrance and exit ramp.
- Monday, November 4, until Friday, November 8, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for bridge structure work.
Southbound
- Through Monday, June 30, 2025, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from Pat Booker Road to Toepperwein Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow next entrance and exit ramp.
- Monday, November 4, 9 p.m. to 5 a.m. Right lane closure on southbound frontage road of I-35 from I-35 Access Road to Albrecht Lane for utilities work.
- Monday, November 4, until Thursday, November 7, 9 p.m. to 5 a.m. Full closure of southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic should follow detour signs.
I-35 from Toepperwein Road to O’Connor Road
Northbound
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on northbound frontage road and exit ramp of I-35 from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodation will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on northbound frontage road, and entrance ramp closure on I-35 from O’Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodation will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure of eastbound and westbound lanes of Toepperwein Road at I-35 for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on northbound frontage road, and entrance ramp on I-35 from O’Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, exit ramp closure and entrance ramp closure of I-35 from O’Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should use next entrance and exit ramp.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound mainlanes, multiple lane closures (2) on northbound I-35 frontage road and exit ramp closure of I-35 from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should use next entrance and exit ramp.
- Wednesday, November 6, until Saturday, November 9, 8 p.m. to 6 a.m. Full closure on westbound collector ramp of Loop 1604 at I-35 interchange and full closure of northbound I-35 connector ramp to westbound Loop 1604 for steel girder work. Traffic should follow detour signs.
Southbound
- Through Friday, January 3, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Crownpoint Drive for construction work.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on southbound frontage road and entrance ramp closure from Judson Road to Crownpoint Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow next entrance and exit ramp.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from Judson Road to O’Connor Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should use next entrance and exit ramp.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on southbound frontage road and exit ramp closure from Crownpoint Drive to O’Connor Road for cap form erection work. Accommodations will be made for local traffic. Traffic should follow detour signs.
I-35 from O’Connor Road to Thousand Oaks Drive
Northbound
- Through Saturday, November 9, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Starlight Terrace to Weidner Road for construction work.
- Through Saturday, December 7, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Weidner Road to O'Connor Road for construction work.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple lane closure (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, right lane closure on eastbound O’Connor Road, entrance ramp closure, and exit ramp closure of I-35 from Weidner Road to O’Connor Road for drainage and drilled shaft work. Accommodations will be made for local traffic. Traffic should use next entrance and exit ramp.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, alternating lane closures (2) on northbound I-35 frontage road and exit ramp closure of I-35 from Thousand Oaks Drive to Weidner Road for drainage and drilled shaft work. Accommodations will be made for local traffic. Traffic should use next entrance and exit ramp.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on northbound frontage road, southbound to northbound turnaround closure, northbound to southbound turnaround closure, entrance ramp closure, and exit ramp closure of I-35 from Starlight Terrace to Weidner Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Monday, November 4, 9 a.m. to 3 p.m. Right lane closure on westbound Weidner Road at northbound frontage road of I-35 for traffic signal equipment.
- Wednesday, November 6, until Saturday, November 9, 8 p.m. to 7 a.m. Full closure on eastbound Loop 1604 connector ramps to I-35. Full closure on eastbound frontage road, and entrance ramp closure of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway and full closure of northbound and southbound lanes of IKEA-RBFCU Parkway at Loop 1604 for setting girders. Traffic should follow detour signs.
Southbound
- Through Saturday, December 7, long-term closure (24/7). Right lane closure on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for bridge work.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on southbound frontage road of I-35 from O’Connor Road to Tech Com Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Tech Com Drive to Weidner Road for cap form erection work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from O’Connor Road to Weidner Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from Weidner Road to Thousand Oaks Drive for drainage and drilled shaft work. Accommodations will be made for local traffic. Traffic should use next entrance and exit ramp.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on southbound frontage road, entrance ramp closure, and exit ramp closure of I-35 from Weidner Road to Thousand Oaks Drive for sidewalk and curb installation work. Traffic should follow detour signs.
I-35 from Thousand Oaks Drive to I-410 North Interchange
Northbound
- Sunday, November 3, until Saturday, November 9, 8 p.m. to 6 a.m. Full closure northbound frontage road of I-35 from Crestway Drive to Weidner Road and full closure of Starlight Terrace intersection at I-35 for drainage and drilled shaft work. Traffic should follow the detour signs.
Southbound
- Through Saturday, November 30, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
- Through Saturday, December 7, long-term closure (24/7). Northbound to southbound turnaround closure at Thousand Oaks for construction work.
- Sunday, November 3, until Saturday, November 9, 8 p.m. to 6 a.m. Full closure on southbound frontage road, exit ramp closure of I-35 from Thousand Oaks Drive to Randolph Boulevard and northbound to southbound turnaround closure at I-35 and Thousand Oaks Drive for column, and cap work. Traffic should follow detour signs.
- Tuesday, November 5, until Saturday, November 9, 8 p.m. to 7 a.m. Full closure on southbound frontage road, exit ramp closure, and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Randolph Boulevard for bridge girders setting. Traffic should follow detour signs.
I-35 and I-410 North Interchange
Northbound
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure of eastbound I-410 connector ramp to northbound mainlanes of I-35 for cap work. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure of northbound I-35 connector ramp to westbound I-410 and entrance ramp closure from Randolph Boulevard for cap work. Traffic should follow detour signs.
I-410 North from I-35 Interchange to Starcrest Drive
Eastbound
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure of westbound I-410 mainlines from Perrin Beitel to Quail Creek Drive for bridge deck work. Traffic should use the frontage road.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel, exit ramp closure, and connector ramp from Austin Highway (Loop 368) northbound to I-410 westbound frontage road for column work. Traffic should follow detour signs.
Westbound
- Through Sunday, December 1, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure of eastbound frontage to westbound frontage connector ramp on I-410 from Austin Highway (Loop 368) to Perrin Creek, full closure on southbound frontage of I-35 to westbound frontage of I-410 at Randolph and full closure of northbound frontage to westbound I-410 at Perrin Creek for column and cap work. Traffic should follow detour signs.
- Sunday, November 3, until Saturday, November 9, 9 p.m. to 7 a.m. Full closure of eastbound frontage road on I-410 from Perrin Beitel to Walzem Road for cap work. Traffic should follow detour signs.
I-35 from I-410 North Interchange to Walzem Road
Northbound
- Through Tuesday, December 3, long- term closure (24/7). Left lane closure on northbound frontage road of I-35 from Randolph Boulevard to Starlight Terrace for bridge work.
Southbound
- Through Saturday, December 7, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Randolph Boulevard to Fratt Road for construction work.
- Monday, November 4, until Saturday, November 9, 9 p.m. to 5 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Walzem Road for installing deck panels. Traffic should follow detour signs.
I-35 from Walzem Road to Eisenhauer Road
Northbound
- Sunday, November 3, until Friday, November 8, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 frontage road between Eisenhauer Road and Walzem Road for drilled shaft work. Traffic should take previous entrance ramp.
- Sunday, November 3, until Friday, November 8, 9 p.m. to 5 a.m. Multiple left lane closures (2) on northbound I-35 frontage from Galahad Drive to Walzem Road for drilled shaft work.
- Sunday, November 3, until Friday, November 8, 9 p.m. to 5 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Galahad Drive to Walzem Road for drilled shaft work.
- Monday, November 4, until Friday, November 8, 9 p.m. to 5 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Galahad Drive to Walzem Road for drilled shaft work.
- Monday, November 4, until Friday, November 8, 9 p.m. to 5 a.m. Turnaround closure on northbound I-35 frontage road at Walzem Road for drilled shaft work.
- Wednesday, November 6, until Friday, November 8, 9 p.m. to 5 a.m. Exit ramp closure on northbound I-35 mainlanes between Eisenhauer Road and Walzem Road for barrier work. Traffic should use prior exit ramp.
- Wednesday, November 6, until Friday, November 8, 9 p.m. to 5 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Eisenhauer Road to Galahad Drive for barrier work.
- Thursday, November 7, 9 p.m. to 5 a.m. Left lane closure on northbound I-35 mainlanes from Petroleum Drive to Eisenhauer Road for roadway work.
- Friday, November 8, 11 p.m. to 7 a.m. Entrance ramp closure on northbound I-35 frontage road between Eisenhauer Road and Walzem Road for drilled shaft work. Traffic should take previous entrance ramp.
- Friday, November 8, 11 p.m. to 7 a.m. Left lane closure on northbound I-35 frontage from Galahad Drive to Walzem Road for drilled shaft work.
- Friday, November 8, 11 p.m. to 7 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Galahad Drive to Walzem Road for drilled shaft work.
- Friday, November 8, 11 p.m. to 7 a.m. Turnaround closure on northbound I-35 frontage road at Walzem Road for drilled shaft work.
Southbound
- Friday, November 8, until Monday, November 11, 9 p.m. to 5 a.m. Multiple lane closures (2) closure on southbound and northbound I-35 mainlanes from Walzem Road to Rittiman Road for roadway work.
I-35 from Eisenhauer Road to Rittiman Road
Northbound
- Monday, November 4, 9 p.m. to 5 a.m. Left lane closure on northbound I-35 frontage road from Rittiman Road to Barrel Creek for drainage work.
- Monday, November 4, until Wednesday, November 6, 9 p.m. to 5 a.m. Multiple lane closures (2) on northbound I-35 frontage road from Rittiman Road to Barrel Creek and the northbound to southbound I-35 turnaround at Rittiman Road for striping work.
- Monday, November 4, until Sunday, November 17, 2024, long-term closure (24/7). Left lane closure on northbound I-35 frontage road from Rittiman Road to Barrel Creek for drainage work.
- Tuesday, November 5, until Thursday, November 7, 9 p.m. to 5 a.m. Alternating lane closures on northbound I-35 frontage road from Rittiman Road to Barrel Creek and the northbound to southbound I-35 turnaround at Rittiman Road for barrier work.
- Tuesday, November 5, until Thursday, November 7, 9 p.m. to 5 a.m. Turnaround closure at northbound I-35 frontage road at Rittiman road for traffic signal work.
I-35 from Rittiman Road to I-410 South Interchange
Northbound
- Monday, November 4, until Wednesday, November 6, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 frontage road between Winnco Drive and Rittiman Road for barrier work. Traffic should use next entrance ramp.
Southbound
- Through Tuesday, November 19, 2024, long-term closure (24/7). Southbound to northbound I-35 turnaround closure at Rittiman Road for drainage work.
- Friday, November 8, 11 p.m. to 5 a.m. Full closure of southbound I-35 frontage road at Rittiman Road and right lane closure on eastbound Rittiman Road for drainage work. Traffic should follow detour signs.
I-35 and I-410 South Interchange
Southbound
- Sunday, November 3, until Friday, November 8, 9 p.m. to 5 a.m. Alternating lane closures on southbound I-35 connector ramp to southbound I-410 South for drilled shaft and column work.
- Sunday, November 3, until Friday, November 8, 9 p.m. to 5 a.m. Right lane closure on southbound I-35 connector ramp to southbound I-410 for cap work.
- Friday, November 8, 11 p.m. to 7 a.m. Alternating lane closures on southbound I-35 connector ramp to southbound I-410 South for drilled shaft and column work.
- Friday, November 8, 11 p.m. to 7 a.m. Right lane closure on southbound I-35 connector ramp to southbound I-410 for cap work.
I-35 from I-410 South to Petroleum Drive
Northbound
- Wednesday, November 6, 9 p.m. to 5 a.m. Left lane closure on northbound I-35 mainlanes from Petroleum Drive to Eisenhauer Road for roadway work.
Southbound
- Monday, November 4, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 mainlanes from Fairdale to Petroleum Drive for roadway work.
- Monday, November 4, until Thursday, November 7, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 frontage road from Holbrook Road to Petroleum Drive for cap work.
- Tuesday, November 5, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 mainlanes from Fairdale to Petroleum Drive for roadway work.
I-410 South from I-35 to Binz Engleman Road
Northbound
- Sunday, November 3, until Friday, November 8, 9 p.m. to 5 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for debris work.
- Sunday, November 3, until Tuesday, November 5, 9 p.m. to 5 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for sweeping work.
- Monday, November 4, until Friday, November 8, 9 p.m. to 5 a.m. Multiple lane closures (2) on northbound and southbound I-35 mainlanes from George Beach Avenue to Walzem Road and on I-410 from Binz Engleman Road to Space Center Drive for pavement work.
- Monday, November 4, until Wednesday, November 6, 9 p.m. to 5 a.m. Exit ramp closure on northbound I-35 mainlanes between George Beach Avenue and Winnco Drive for barrier work. Traffic should use prior exit ramp.
- Monday, November 4, until Wednesday, November 6, 9 p.m. to 5 a.m. Left lane closure on northbound I-35 frontage road from George Beach Avenue to Winnco Drive for barrier work.
- Friday, November 8, 11 p.m. to 7 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for debris work.
- Friday, November 9, 11 p.m. to 7 a.m. Multiple lane closures (2) on northbound and southbound I-35 mainlanes from George Beach Avenue to Walzem Road and on I-410 from Binz Engleman Road to Space Center Drive for pavement work.
- Saturday, November 10, 9 p.m. to 8 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for debris work.
Southbound
- Thursday, November 7, until Friday, November 8, 9 p.m. to 5 a.m. Exit ramp closure on southbound I-410 to Binz Engleman Road for barrier work. Traffic should use previous exit ramp
- Thursday, November 7, until Friday, November 8, 9 p.m. to 5 a.m. Left lane closure on southbound I-410 frontage road from I-35 to Winnco Drive for barrier work.
- Thursday, November 7, until Friday, November 8, 9 p.m. to 5 a.m. Right lane closure on southbound I-410 mainlanes from Winnco Drive to Binz Engleman Road for barrier work.
- Friday, November 8, 11 p.m. to 7 a.m. Exit ramp closure on southbound I-410 to Binz Engleman Road for barrier work. Traffic should use previous exit ramp
- Friday, November 8, 11 p.m. to 7 a.m. Left lane closure on southbound I-410 frontage road from I-35 to Winnco Drive for barrier work.
- Friday, November 8, 11 p.m. to 7 a.m. Right lane closure on southbound I-410 mainlanes from Winnco Drive to Binz Engleman Road for barrier work.
OTHER LANE CLOSURES
- For your information, there are other lane closures underway within the I-35 NEX project this week, but they are not expected to affect traffic or create notable delays.
|