|
FOR IMMEDIATE RELEASE September 8, 2026 |
Molly Onufer Press Secretary molly.onufer@pittsburghpa.gov |
|
Rialto Street to be Closed to Vehicles During Lowrie Street Bridge Repairs
Pittsburgh, PA – The City of Pittsburgh Department of Mobility and Infrastructure (DOMI) has scheduled repairs of the Lowrie Street Bridge in Troy Hill beginning on Monday, September 14th, 2026. Rialto Street, located under the bridge, is expected to be closed to vehicles for 1-2 months while the bridge’s abutments are repaired.
The bridge superstructure (concrete beams and concrete deck) was replaced in 2020-2021, but the bridge has maintained a “poor” rating due to the condition of the abutments, which support each end of the bridge.
The planned work will require a long-term vehicular closure of Rialto Street between Ley Street and Route 28 while the contractor completes the following work:
-
Replacing aged and deteriorated stones with local quarry sandstone
Repairs, and the closure, are expected to take 1-2 months. Pedestrian access will be maintained throughout construction, but vehicular traffic will be detoured via Route 28, Chestnut Street and Troy Hill Road. The Lowrie Street Bridge is expected to remain open throughout construction.
###
|
|
|
|