Fall Quarter | October 24, 2026
|
|
Construction projects in your area
|
|
|
These projects are either in construction or starting soon. More details are added to project pages throughout the work. |
|
 |
|
Project #20658 Clark / Lott / Berwyn
Water main replacement project in Bustleton. This project started in September 2026.
|
 |
|
Project #41186 Buckley Terrace Flood Relief
Water main and sewer replacement project to help relief flooding in Bustleton. This project should be complete in late 2027.
|
 |
|
Project #20650 Somerton Transmission Piping and Standpipes
This water transmission main project is part of our Water Revitalization Plan. Work was completed in Somerton in Mid 2026. Phase 2 is coming soon.
|
 |
|
Project #20565 Edison / Grant
This water main replacement project was in construction from early 2025 to Spring 2026.
|
|
|
Interested in other PWD work?
|
|
|
|
Explore our interactive construction map for detailed information about all planned water, sewer, and green infrastructure projects throughout Philadelphia. Our project pages include a map, contact info, and resources.
|
|
Water mains
We actively replace water mains that deliver safe drinking water throughout our system. Reliable mains mean fewer main breaks that damage our roads.
Sewers
Sewers are often replaced alongside water mains to reduce disturbance in neighborhoods. Collecting and treating wastewater is part of how we protect our waterways.
Green Stormwater Infrastructure (GSI)
GSI is installed to help manage stormwater and follow laws for reducing pollution. Inlets and basins are added underground to soak up water runoff. Green features provide benefits for our environment, communities, and economy.
|
|
|
Construction impacts on residents
|
|
|

Direct impact area: Streets with active construction
- Equipment and noise from 7 a.m. to 4 p.m.
- Open trenches in the street and/or sidewalk
- Loss of water, with 24-hour notice given for any shutoffs lasting more than 30 minutes
- Closed blocks and temporary no parking, with access for residents
- Temporary pavements during off-site work
- Change in trash pickup locations
General impact area: Local vicinity that may feel the impacts of active construction
- Temporary pavements and road closures in the neighborhood
- Periodic loss of parking
- Loss of water, with 24-hour notice given for any shutoffs lasting more than 30 minutes
|
|
Lead and service lines
During planned water main construction, we offer to replace any lead or galvanized metal service lines from our water main all the way to the customer’s meter. This service is offered free of charge. Learn more about lead service lines.
Your council district
You're receiving this because your ZIP code is within Council District 10. If your ZIP code overlaps multiple districts, you'll get newsletters for each. If needed, you can update your ZIP code here.
Spread the word!
We want as many residents as possible to get updates on projects in their neighborhood! Encourage your neighbors to sign up for the Construction Newsletter with their ZIP code.
Is there information you'd like to see in these quarterly updates or do you have questions? Send an email to water.projects@phila.gov.
|
|
Was this information helpful?
|
|
You're receiving this email because you signed up for PWD General News or Alerts and Notifications updates with your ZIP code. |
|
|
|