 Traffic impacts
-
Altman Road (between Pipeline Road and Oxbow Drive) through mid-October: Road closure Monday through Saturday during work hours with signed detours for through traffic to use Oxbow Drive or Lusted Road. School buses and emergency vehicles will be flagged through the work area as needed. Flaggers will provide local residents access from Lusted Road. Outside of work hours, the road will be open to one-way northbound-only traffic.
-
Dodge Park Boulevard (east of Cottrell Road to east of Altman Road) through end of October: Flagged two-way traffic Monday through Saturday to install new water pipeline in the public right-of-way on the south side of the road. Normal traffic will resume outside of work hours.
What to expect:
- Flaggers and temporary traffic controls to direct traffic
- Surveyors working in the public right-of-way
- Local and emergency access will be maintained
Proceed with caution
3. Cottrell Road south of Dodge Park Boulevard: We're aware of the uneven road surface (a dip) on Cottrell Road between Dodge Park Boulevard and Bluff Road. We're planning to repave the road in mid-September. Signs with lights have been added to alert drivers in the interim. Please use caution when driving through this section of the road. Cottrell Road north of Lusted Road will resume being used as a haul route.
Other work happening the week of August 25
Staff will be at the project work sites during shift hours to perform various tasks. Work hours will be between 7 a.m. and 6 p.m., Monday through Saturday.
Filtration facility site activities include:
-
Increased construction truck traffic traveling to and from the site
-
Off-hauling soils to permitted locations using approved haul routes, including to a location off Lusted Road near Cottrell Road
- Delivering equipment, large piping, aggregate, and other materials to the site
- Installing concrete for process building slabs, buried pipelines, and electrical ductbanks
- Excavating and grading for non-process buildings
- Excavating and preparing subgrade for overflow pond concrete installation
- Installing and encasing underdrain piping for process buildings
- Installing large-diameter piping and completing rebar formwork and initial concrete pours for process areas
- Ongoing stormwater management and erosion control
- As needed street sweeping
- Ongoing 24/7 site security
- Excavating finished water pipeline connection on City property north of Carpenter Lane
Finished water pipeline site activities include:
- Installing new water pipeline in public right-of-way along south side of Dodge Park Boulevard
- Ongoing stormwater management and erosion control
- As needed street sweeping
Finished water intertie site activities include:
- Remobilizing construction equipment
- Ongoing stormwater management and erosion control
Raw water tunnel/pipeline site activities include:
- Surveyors working along Lusted Road near the county line
- Delivering equipment and materials to the site
- Excavating raw water pipeline portal
- Ongoing stormwater management and erosion control
Bull Run Filtration: neighbor update meeting (August 2025)
At the August 13 meeting, community members heard an update on pipeline and facility construction progress and planned activities. The team also discussed traffic management and safety steps in the project area and upcoming road and lane closures while new pipelines are being installed in the right-of-way.
Visit the August 2025 Neighbor Update Meeting webpage to see the meeting presentation and recording.
Bull Run Filtration: coffee with the contractor
The Water Bureau will host an informal drop-in session where project neighbors can chat with representatives of the construction teams, ask questions, and hear about recent progress and upcoming work. There is no presentation, so stop in anytime between 9 and 10:30 a.m.
Date: Thursday, September 11, 2025
Time: 9-10:30 a.m.
Where: Multnomah County Grange #71, 30639 SE Bluff Road, Gresham
Can't make this neighbor update meeting? Join us at the next in-person event October 9.
|
|
Get construction text alerts
Sign up to receive text notifications about temporary lane closures and other construction traffic information related to the Bull Run Filtration project.
|
|
|
The Bull Run Filtration Project will remove Cryptosporidium and other contaminants from the Bull Run water supply, producing cleaner, safer water for the one million people who use our water now and for future generations. The project is required by the federal Safe Drinking Water Act and must be in operation by September 30, 2027, through a bilateral compliance agreement with the Oregon Health Authority.
To learn more, visit portland.gov/water/filtration.
|
|
|
Know someone who would be interested in updates about the Bull Run Treatment Projects? Please share the news!

The City of Portland is committed to providing meaningful access. To request translation, interpretation, modifications, accommodations, or other auxiliary aids or services, or to file a complaint of discrimination, contact 503-823-4000 (311), Relay Service & TTY: 711
Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्याख्या 口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas Translation and Interpretation: 503-823-4000 (311), Relay: 711
This email was sent from an unmonitored inbox. Please do not reply. Instead, contact us at bullrunprojects@portlandoregon.gov.
|
|
|
|