 Traffic controls include:
-
Dodge Park Boulevard (between Cottrell Road and Altman Road) on Saturday 12/14: Single-lane closure with flagged two-way traffic while crews complete potholing to confirm utility locations.
-
Lusted Road/Altman Road intersection: Full closure during shift hours to allow for pipeline construction. Through traffic will be detoured to Oxbow Drive/Hosner Road or to Pleasant Home Road/Dodge Park Boulevard. Local farm traffic and school buses will be flagged through as needed. The intersection will be reopened to regular traffic outside shift hours.
-
Lusted Road (between Hosner Road and Altman Road): Single-lane closure with flagged one-way westbound traffic while crews install water lines on the south side of Lusted Road between the intertie site and Altman Road intersection. Eastbound traffic will be detoured to Oxbow Drive or Dodge Park Boulevard--school buses and farm traffic will be flagged through west to east during shift hours as needed.
-
Lusted Road (near county line): Single-lane closure with flagged two-way traffic to allow for temporary widening within the Lusted Road right-of-way.
What to expect:
- Signage and temporary traffic controls to direct traffic
- Local and emergency access will be maintained
- Flaggers will prioritize school buses and farm traffic
Construction activity for week beginning December 16, 2024
Construction work hours will be between 7 a.m. and 6 p.m., Monday through Saturday. Deliveries and work to prepare or secure the sites for the day may occur outside of these hours.
Work at the filtration facility site includes:
What to expect:
- 24-hour site security
- Increased traffic near the site
- Construction noise and vibration near the site
- Street sweeper operating on Carpenter Lane
Work at the finished water pipeline site on Carpenter Lane includes:
- Installing caisson launch shaft for pipeline
What to expect:
- Increased traffic near the site
- Construction noise and vibration near the site
Work at the raw water pipeline/tunnel site on Lusted Road near the Clackamas/Multnomah county line includes:
- Delivering equipment and materials to the site
- Installing fencing and temporary utilities
- Installing soldier piles for tunnel construction
What to expect:
- Increased traffic near the site
- Flaggers for traffic safety when vehicles are entering and exiting the site
- Construction noise and vibration near the site
- Street sweeper operating on Lusted Road
Work at the finished water intertie site and in the City-owned easement east of Altman Road between Lusted Road and Dodge Park Boulevard includes:
What to expect:
- Increased traffic near the site
- Flaggers for traffic safety when vehicles are entering and exiting the site
- Construction noise and vibration near the site
- Street sweeper operating on Lusted Road
Work schedules are subject to change depending on weather and other field conditions. For the latest information about current and upcoming construction activities, visit portland.gov/FiltrationConstruction.
Bull Run Filtration: Neighbor Update Meeting (January 2025)
The Water Bureau will host an online community meeting to update neighbors on progress and upcoming construction work for the Bull Run Filtration projects.
Date: Thursday, January 9, 2025
Time: 6 pm
Where: Zoom (register here)
Can't make the meeting this time? Join us for the in-person Coffee with the Contractor on February 13.
|
|
Get construction text alerts
Sign up to receive text notifications about temporary lane closures and other construction traffic information related to the Bull Run Filtration project.
|
|
|
The Bull Run Filtration Project will remove Cryptosporidium and other contaminants from the Bull Run water supply, producing cleaner, safer water for the one million people who use our water now and for future generations. The project is required by the federal Safe Drinking Water Act and must be in operation by September 30, 2027, through a bilateral compliance agreement with the Oregon Health Authority.
To learn more, visit portland.gov/water/filtration.
|
|
|
Know someone who would be interested in updates about the Bull Run Treatment Projects? Please share the news!

The City of Portland is committed to providing meaningful access. To request translation, interpretation, modifications, accommodations, or other auxiliary aids or services, contact 503-823-7432, Relay: 711.
Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्याख्या 口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas Translation and Interpretation: 503-823-7432, Relay: 711
This email was sent from an unmonitored inbox. Please do not reply. Instead, contact us at bullrunprojects@portlandoregon.gov.
|
|
|
|