News Blog: Investing in East Portland in 2020 and beyond
Portland Bureau of Transportation sent this bulletin at 12/31/2019 01:15 PM PST
Click to view a larger version of this map. ![]() Projects Completed in 2019Fixing Our Streets: Halsey-Weidler Streetscape Project Location: NE Weidler and Halsey streets between 100th and 114th avenues Scope: Paving, new crosswalks, transit islands, protected bike lanes, rebuilt signals, and ADA ramps. Status: Completed summer 2019 Budget: $5.5 million
Paving SE Harold Street (111th to 136th) Location: SE Harold Street between 111th and 136th avenues Scope: Paving Status: Completed summer 2019 Budget: $200,000
Fixing Our Streets: NE 148th Avenue Sidewalks Location: NE 148th Avenue between Glisan and Halsey streets Scope: Sidewalks Status: Completed fall 2019 Budget: $1.7 million
Fixing Our Streets: I-205 at Glisan Intersection Safety Improvements Location: I-205 at NE Glisan Street Scope: Paving, upgraded I-205 trail crossing Status: Completed spring 2019 Budget: $300,000
SE Holgate Street and 104th Avenue Traffic Signal Rebuild Location: SE Holgate Street at 104th Avenue Scope: New traffic signal and ADA ramps Status: Completed spring 2019 Budget: $500,000 ![]() Projects Currently Under ConstructionNE Marine Drive Corridor Safety Improvements Location: NE Marine Drive between 112th and 185th avenues Scope: Corridor safety updates, including graded pedestrian crossings, filling in trail gaps, a new traffic signal at 122nd Avenue, reduced speed limit, enhanced bike facilities, and two new rapid-flashing beacons. Status: 90% complete. Expected to be complete by February 2020. Budget: $1.5 million
Outer Division Multimodal Safety Project (Phase 1) Location: SE Division Street between 99th and 162nd avenues Scope: Street lighting, sidewalk infill, and new pedestrian crossings. Status: 85% complete. Expected to be complete spring 2020. Budget: $3.5 million
Location: NE and SE 130s, between I-84 and SE Powell Boulevard Scope: New crossing treatments, traffic calming, ADA ramps, and wayfinding signage Status: 85% complete. Expected to be complete spring 2020 Budget: $2 million
East Portland Traffic Signal Upgrades Location: Nine intersections on 102nd Avenue from SE Washington Street to NE Sandy Boulevard; and seven intersections on NE 122nd Avenue from NE Airport Way to East Burnside Street Scope: Upgrade signal heads to increase visibility and improve safety Status: 97% complete Budget: $2.5 million
East Portland Pedestrian Safety Crossings Locations: NE 85th Avenue at Sandy Boulevard; NE 91st Avenue at Sandy Boulevard; and SE Stark Street at 155th Avenue Scope: New pedestrian crossings Status: 90% complete. Crossings will be operational when power is connected spring 2020. Budget: $3 million
Fixing Our Streets: HOP Neighborhood Greenway Location: NE Holladay, Oregon, and Pacific streets (HOP) between 99th and 128th avenues Scope: Traffic calming, ADA ramps, and wayfinding signage Status: 80% complete. Construction will be complete Spring 2020. Budget: $1.1 million
Portland Gravel Street Service Location: Gravel streets throughout East Portland Scope: Grade and gravel existing gravel streets Status: Currently in Year 2 of a 3-year cycle ![]() Projects Beginning Construction in 2020Fixing Our Streets: SE 136th Paving and Sidewalks to Opportunity Location: SE 136th Avenue from Division Street to Foster Road Scope: Paving, sidewalks, curb ramps, protected bike lanes, street trees Status: Design complete. Construction May – December 2020 Budget: $8.5 million
East Portland Access to Employment and Education Project Location: SE Market Street between 92nd and 130th avenues Scope: 100s Neighborhood Greenway; 150s Neighborhood Greenway; SE Market Street sidewalks and ADA ramps. Status: Design complete. Construction starts summer 2020 Budget: $11 million
Fixing Our Streets: 122nd Avenue Corridor Multimodal and Safety Project Location: 122nd Avenue from NE Shaver Street to SE Foster Road Scope: Corridor safety improvements, street lighting infill, and repurposing a parking lane to a bus priority lane. Status: Design underway. Construction expected late fall 2020. Budget: $3 million
Fixing Our Streets and Safe Routes to School: SE 174th Avenue sidewalks Location: SE 174th Avenue between Stark and Main streets Scope: New sidewalks Status: Design underway. Construction expected late fall 2020 Budget: $2.4 million
Location: NE Glisan Street between 102nd and 162nd avenues Scope: Corridor safety upgrades, new and upgraded pedestrian crossings. Status: Phase 1 will be complete January 2020. Phase 2 begins fall 2020. Budget: $400,000
Location: NE Halsey Street between 114th and 162nd avenues Scope: New pedestrian crossings, ADA ramps, sidewalk infill and protected bike lanes, with no change to the number of travel lanes. Status: Design at 95%. Construction expected to start spring 2021. Budget: $4 million
Fixing Our Streets: Outer Division Multimodal Safety Project (Phase 2) Location: SE Division Street between 80th and 162nd avenues Scope: New pedestrian crossings, protected bike lanes, and corridor safety improvements. Status: Design at 95%. Construction expected fall 2020. Budget: $10.5 million
Fixing Our Streets and Safe Routes to School: NE Shaver Street sidewalks Location: NE Shaver Street from 115th Avenue to Parkrose Middle School Scope: Sidewalk infill along south side of Shaver Status: Design underway. Construction expected late fall 2020 Budget: $200,000
Fixing Our Streets and Safe Routes to School: New traffic signals Locations: NE 113th Avenue at Glisan Street; SE 86th Avenue at Washington Street; SE 148th Avenue at Main Street; Scope: New signalized crossings Status: Design at 30%. Construction expected late fall 2020. Budget: $2.5 million
Fixing Our Streets: NE 102nd Avenue Corridor Safety Improvements Location: NE 102nd Avenue from Weidler Street to Sandy Boulevard Scope: Corridor safety upgrades Status: Phase 1 completed summer 2019. Phase 2 with more permanent elements scheduled for 2020. Budget: $300,000
Fixing Our Streets: 4M Neighborhood Greenway Location: SE Mill, Millmain, and Main streets (4M) between 130th and 174th avenues Scope: Sidewalk infill, tree planting, bike lanes and pavement markings, speed bumps, and wayfinding signage Status: Design at 30%. Construction expected late fall 2020. Budget: $1.5 million
Fixing Our Streets: New traffic signal at SE 146th Avenue and Stark Street Location: SE 146th Avenue and Stark Street Scope: New traffic signal Status: Design complete. Construction begins spring 2020. Budget: $1 million
NE 87th Avenue and Glisan Street Crossing Improvement Location: NE 87th Avenue and Glisan Street Scope: New rapid-flashing beacon Status: Construction begins spring 2020 Budget: $350,000
SE 102nd Avenue and Woodstock Street Local Improvement District (LID) Locations: SE 102nd Avenue from Woodstock Boulevard to Foster Road; SE Woodstock Boulevard from 101st Avenue to 93 feet east of SE 102nd Avenue. Scope: Paving Status: Construction expected fall 2020 ![]() Projects in the Pipeline: Opportunities for Engagement in 2020162nd Avenue Safety and Access to Transit Project Location: SE 162nd Avenue from Stark Street to Powell Boulevard Scope: Corridor safety improvements and improved pedestrian crossings Status: Beginning Design. Construction expected spring 2021. Budget: $1.5 million
Build Portland: Safer Outer Stark Location: SE Stark Street between 109th and 162nd avenues Scope: Paving, corridor safety upgrades Status: Project development and public involvement throughout 2019. Design begins winter 2020. Construction expected 2022.
Build Portland: Foster-Woodstock Couplet East Location: SE Foster Road and Woodstock Boulevard between I-205 and 101st Avenue Scope: Pedestrian crossings, bicycle upgrades, ADA curb ramps, and traffic signals Status: Design began fall 2019. Construction expected 2021.
Division-Midway Neighborhood Street Improvements Location: Selected gravel streets in the Division-Midway and Powellhurst-Gilbert area Scope: Pave certain gravel streets Status: Public outreach and design start spring 2020. Construction expected 2022.
NE Halsey Safety and Access to Transit Project Location: NE Halsey Street between 65th and 92nd avenues Scope: Signal improvements, intersection redesigns, bus stop improvements and high-priority crossings, bikeway on Halsey from 65th to 92nd, multiuse path connection from 82nd Avenue. Status: Design began fall 2019. Construction expected 2022.
Jade-Montavilla Connected Centers Scope: Biking and walking upgrades in the Jade and Montavilla districts Status: Design begins winter 2020. Construction expected 2022. Budget: $7.1 million
Location: NE 97th Avenue from E Burnside to NE Davis streets; E Burnside Street from 9400 block to NE 97th Avenue Scope: New street, sidewalk, and stormwater infrastructure Status: Construction expected 2021 Budget: $5.7 million
Location: NE Couch Street between 97th and 99th avenues; NE Davis Street between 97th and 100th avenues. Scope: New street, sidewalk, and stormwater infrastructure: Status: Construction expected 2022 Budget: $8.9 million
![]() The Portland Bureau of Transportation (PBOT) is the steward of the city’s transportation system, and a community partner in shaping a livable city. We plan, build, manage, and maintain an effective and safe transportation system that provides access and mobility. www.portlandoregon.gov/transportation The City of Portland complies with all non‐discrimination, Civil Rights laws including Civil Rights Title VI and ADA Title II. To help ensure equal access to City programs, services and activities, the City of Portland will reasonably modify policies/procedures and provide auxiliary aids/services to persons with disabilities. Call 503-823-5185, TTY 503-823-6868 or Oregon Relay Service: 711 with such requests, or visit http://bit.ly/13EWaCg |