Full Closure – US101 NB & SB MP 0.00 to MP 3.33 (Astoria-Megler/Columbia River Bridge – Astoria)

Having trouble viewing this email? View it as a Web page.

Full Closure – US101 NB & SB MP 0.00 to MP 3.33 (Astoria-Megler/Columbia River Bridge – Astoria)

 

For more information: (503) 373-0000, option 1 for information about over-dimension loads; (503) 378-6699 for information about registration services 

 

October 11, 2024

ASTORIA – On Sunday October 13, this section of US101 northbound and southbound, (the Astoria-Megler Bridge), will be closed from 8:30 a.m. to 11:00 a.m.
for the Great Columbia Crossing 10K run/walk.

 

Detour

No vehicles except emergency vehicles will be allowed to use the bridge during this time frame. Motor carriers will need to avoid traveling through this area during the restricted days/hours, or use authorized alternate routes.

US101 NB & SB MP 0.00 to MP 3.33 (Astoria-Megler Bridge)
trip check

For help determining authorized alternate routes, contact the agency’s Over Dimension Permit Unit, (503) 373-0000, Monday through Friday from 7 a.m. to 5 p.m. For current construction and travel information, visit www.tripcheck.com or dial 511.