ODOT Southwest Oregon Construction Report for March 26-April 1, 2023

Having trouble viewing this email? View it as a Web page.

Placing girders on Oakland Bridge

OAKLAND – Contractors are seen placing girders on the new Oakland Bridge in this drone image from Wednesday, March 22. The bridge will be located on a new alignment north of the original 1925 bridge (left). Construction began in February of last year and all work is expected to be completed by summer of 2024. ODOT PHOTO

 

Southwest Oregon Construction Report for March 26-April 1, 2023

 

The following report includes ODOT highways in Josephine, Jackson, Coos, Curry and Douglas counties. Projects are listed in the following order: highway, location, project name. Project construction costs are added in parenthesis as appropriate.

Pedestrian routes: Where traffic is routed through or around a work zone, pedestrians, including those with disabilities, will also be provided routes through or around the work zone.

Know before you go! Visit www.TripCheck.com for road conditions and traffic cameras or dial 5-1-1. Visit the ODOT website at www.oregon.gov/ODOT/ for more information.

 

COOS COUNTY

OREGON 42 (Coos Bay-Roseburg Highway), MP 35.5, Frenchie Creek Bridge ($3.9 million)

This project will replace the existing culvert at Frenchie Creek with a 95-foot long concrete bridge.

Highway traffic has been routed onto a bypass alignment. Watch for a traffic signal at the work zone and expect brief delays.

OREGON 542 (Powers Highway), MP 18-19 (Powers), ADA curb ramp replacement ($1.3 million)

This project will improve safety for pedestrians in Powers by bringing several highway curb ramps along Oregon 542 into compliance with the Americans with Disabilities Act.

Watch for intermittent lane and shoulder closures along Oregon 542 through Powers due to sidewalk construction.

U.S. 101 (Oregon Coast Highway), MP 239 (Coos Bay), Bunker Hill sidewalks and Flanagan signal ($2.7 million)

This project will improve safety and the flow of traffic by upgrading pedestrian facilities and replacing the traffic signal at Flanagan Road.

Watch for nighttime lane closures on U.S. 101 through the work zone, from 7 p.m. until 6:30 a.m. (northbound) and 9 a.m. (southbound), Sunday night to Friday morning. Alternate pedestrian routes will be identified and posted during sidewalk closures.

U.S. 101 (Oregon Coast Highway), MP 274.0-274.1 (Bandon), ADA curb ramp replacement ($4.2 million)

This project will improve safety for pedestrians in Bandon by bringing several highway curb ramps around the entrance to Old Town Bandon and Chicago Ave SE into compliance with the Americans with Disabilities Act. The project also will replace ADA sidewalk ramps in Reedsport, Gardiner, Elkton and Drain.

Watch for intermittent lane and shoulder closures along U.S. 101 in the vicinity of the entrance to Old Town Bandon. Alternate routes will be identified for pedestrians during sidewalk construction.

 

CURRY COUNTY

OREGON 255 (Carpenterville Highway), MP 324.4-347.1, Utility installation and line maintenance

During April and May, workers will install and repair utility lines along the northern area of Carpenterville Highway between Pistol River Loop and Burnt Hill Drive. Watch for intermittent lane and shoulder closures and expect delays of 10-15 minutes. Flaggers will provide traffic control as needed. All work is expected to be completed by May 19.

U.S. 101 (Oregon Coast Highway), MP 300-301 (Port Orford), Garrison Slough to Cemetery Loop Road paving and pedestrian improvements ($4.35 million)

This project will pave U.S. 101 through Port Orford, replace ADA curb ramps at 15 intersections and make other safety improvements.

During spring break (March 27-31), construction will focus on the area of 12th Street in front of Driftwood Elementary School. Watch for intermittent lane, shoulder and sidewalk closures. During sidewalk closures, alternate pedestrian routes will be identified and signed.

In early April, work contractors plan to work in south Port Orford at the Jefferson and Jackson Street intersections.

U.S. 101 (Oregon Coast Highway), MP 312, Arizona Slide repair

Watch for intermittent lane closures 12 miles south of Port Orford due to repairs on the Arizona Slide. Flaggers will provide traffic control as needed. Watch for construction vehicles entering and exiting the travel lanes. Expect brief delays.

 

DOUGLAS COUNTY

INTERSTATE 5 (Pacific Highway), MP 99-136, ADA sidewalk replacement ($1.7 million)

Project is mostly complete. No traffic impacts are expected this week.

INTERSTATE 5 (Pacific Highway), MP 104, MP 119 and MP 130, VMS and curve warning signs ($2.6 million)

The project will install variable message signs and curve warning signs along I-5.

Watch for intermittent nighttime lane and shoulder closures along I-5 at MP 104, MP 119 and MP 130.

INTERSTATE 5 (Pacific Highway), MP 118-126, Garden Valley to Roberts Creek paving ($17 million)

Project is mostly complete. No traffic impacts are expected this week.

INTERSTATE 5 (Pacific Highway), MP 81-89, Azalea to Glendale paving ($11.5 million)

This project will pave I-5 between Azalea and Glendale, replace guardrail and make other safety improvements.

During March and April, contractors will replace guardrail between Glendale and Quines Creek and construct a new crossover for emergency service vehicles in the median.

Watch for intermittent weekday lane and shoulder closures. Motorists should also watch for workers and equipment through the work zone, as well as construction vehicles entering and exiting the travel lanes.

OREGON 38 (Umpqua Highway), MP 16, Scottsburg Bridge replacement ($39.5 million)

A short section of Main Street will remain closed under Scottsburg Bridge until spring. Hamilton Construction will resume work rebuilding the road when weather improves. Scottsburg West Road motorists are advised to use Oregon 38 to reach other areas of Scottsburg.

OREGON 38 (Umpqua Highway), MP 35-36 (Elkton), ADA curb ramp replacement ($4.2 million)

This project will improve safety for pedestrians by bringing several highway curb ramps along Oregon 38 in Elkton into compliance with the Americans with Disabilities Act. The project also will replace ADA sidewalk ramps in Bandon, Gardiner, Reedsport and Drain.

Watch for intermittent lane and shoulder closures along Oregon 38 through Elkton due to sidewalk construction.

OREGON 138E (North Umpqua Highway), MP 17.9 (Glide), Lone Rock Bridge repairs ($3.8 million)

This project will increase the vertical clearance of Lone Rock Bridge, paint the steel truss, repair concrete sections of the bridge, and replace the driving surface. This two-bridge project will also repair Dodge Bridge on Oregon 234 in Jackson County. Construction will continue until summer 2024.

At Lone Rock Bridge, watch for intermittent lane closures and brief delays. Flaggers will provide traffic control as needed

OREGON 138E (North Umpqua Highway), MP 22-38, Archie Creek Wildfire response and repairs

Remaining work zone activities include repairing and replacing delineators, signs, and damaged fencing.

Watch for intermittent weekday lane closures from milepost 22 to 38. Expect delays up to 20 minutes. Flaggers and pilot cars will provide traffic control as needed. Remaining work is expected to continue through the end of winter.

OREGON 99 (Oakland-Shady Highway/NE 1st Street), Oakland Bridge replacement ($22.6 million for two-bridge bundle)

This two-year project will replace the 1925 Oakland Bridge on Oregon 99 (NE 1st Street) at the north end of Oakland. The bridge will be built on a new alignment, just north of the existing bridge. This project is part of a two-bridge bundle that also includes replacing a bridge in the Melrose area west of Roseburg.

Watch for intermittent lane and shoulder closures. Flaggers will provide traffic control as needed and most delays will be brief.

MELROSE ROAD (Douglas County Road 167), Conn-Ford Bridge replacement ($22.6 million for two-bridge bundle)

This two-year project will replace the 1964 Conn-Ford Bridge, which spans the south Umpqua River on Melrose Road about one mile west of Roseburg. This project is part of a two-bridge bundle that also includes replacing a bridge in Oakland. 

Melrose Road traffic will use a bypass bridge at the South Umpqua River until 2024. Motorists should slow down and drive with caution due to curves at both ends of the bridge and a traffic signal at the east end.

Watch for construction vehicles entering and exiting the travel lanes.

U.S. 101 (Oregon Coast Highway), MP 211.7-213.2 (Reedsport), ADA curb ramp replacement ($4.2 million)

This project will improve safety for pedestrians in Reedsport by bringing several highway curb ramps along U.S. 101 and Frontage Road into compliance with the Americans with Disabilities Act. The project also will replace ADA sidewalk ramps in Bandon, Gardiner, Elkton and Drain.

In Reedsport, watch for daytime lane and shoulder closures along U.S. 101 north of Schofield Creek. In the southern part of Reedsport (U.S. 101 south of Schofield Creek) watch for on-street parking closures and bicycle lane closures. Watch for intermittent lane closures on Frontage Road.

 

JACKSON COUNTY

INTERSTATE 5 (Pacific Highway), MP 14.7, East Main Street Bridge deck rehabilitation

Watch for nighttime I-5 single-lane closures in both directions under the East Main Street Bridge. Work crews are preparing the bridge for a deck rehabilitation project in April.

INTERSTATE 5 (Pacific Highway), MP 26-24, Right of way fence replacement ($51,000)

Watch for southbound shoulder closures Monday to Friday, 7 a.m. to 5 p.m., as contractors replace the right of way fence.

INTERSTATE 5 (Pacific Highway), MP 33, VMS and curve warning signs ($2.6 million)

This project will install variable message signs and curve warning signs at several locations along I-5 in Douglas and Jackson counties.

Watch for intermittent nighttime lane and shoulder closures along I-5 near milepost 33.

INTERSTATE 5 (Pacific Highway), MP 40-45 (southbound), Hazard tree and brush removal

From 7 a.m. to noon on Sunday, March 26, expect possible rolling slowdowns northbound to allow contractors to fell hazard trees. This work may be postponed due to weather.

Watch for southbound I-5 shoulder closures Monday to Friday, 7:30 a.m. to 4 p.m., as contractors remove hazard trees and brush along the roadside for wildfire mitigation.

OREGON 99 (Rogue Valley Highway), MP 0.4 to 1.6, Interstate 5 to Scenic Avenue improvement project, Central Point ($3.5 million)

Watch for construction along the side of Oregon 99 for storm pipe installation.

The work zone speed limit has been reduced to 45 mph for worker safety.

This safety project installs new traffic signals, constructs ADA compliant curb ramps, upgrades the existing railroad crossing, and paves and restripes the project area.

OREGON 99, I-5 area curb ramp Americans with Disability Act curb ramp upgrades, Ashland area ($4.8 million)

Crews will replace ADA curb ramps in Ashland throughout the spring.

Weather-permitting, contractor will continue to work when and where they can, including:

  • North Main at Nursery, east side
  • North Main at Van Ness, both sides, flashing beacon
  • North Main at Manzanita, SW side
  • North Main at Bush, NW corner
  • North Main at Water, NE side
  • Siskiyou Blvd. at Clay, SE corner
  • Siskiyou Blvd and Tolman Creek Rd., NW corner

Temporary pedestrian access will be maintained. Construction hours are 7 a.m. to 3 p.m. Expect possible short delays of up to 20 minutes.

This project installs ADA compliant curb ramps in Ashland on North Main, the downtown area and Siskiyou Boulevard. Curb ramps will also be replaced at a few other intersections in south Medford and Talent.

OREGON 140 (Lake of the Woods Highway), MP 1.03, Turn lanes at Lakeview Drive ($1.7 million)

Watch for workers and equipment on the roadside as the contractor builds center turn lanes.

Project constructs center turn lanes from OR 140 to Lakeview Drive.

 

JOSEPHINE COUNTY

INTERSTATE 5 (Pacific Highway), Exit 58, north Grants Pass, Seismic bridge improvements and retrofitting ($12.7 million)

Watch for possible shoulder closures under the I-5 Exit 58 bridges through May. The contractor is strengthening these bridges to better withstand earthquakes.

This is part of a larger seismic reinforcement project in southern Oregon.

INTERSTATE 5 (Pacific Highway), Hillcrest Road Bridge, north Grants Pass, seismic bridge improvements and retrofitting ($5 million)

The Hillcrest Road undercrossing is closed for seismic repairs until May 15. Use alternate local routes. I-5 traffic is not affected.

OREGON 99, 238, 62, 140 and U.S. 199, Americans with Disabilities Act curb ramp upgrades, Grants Pass area ($3.7 million)

Weather permitting, the contractor will continue work on curb ramps throughout the project area.

Temporary pedestrian access will be maintained. Expect workers Monday-Friday, 7 a.m. to 3 p.m., with possible split shifts depending on the work.

U.S 199 (Redwood Highway), MP 7-41, Maintenance brushing and clearing

Expect short delays and watch for flaggers and crews working to improve safety and sight distance by clearing brush and hazard trees along the highway.

 

For more information:

Gary Leaming, ODOT Public Information (Jackson, Josephine), 541-774-6388

Dan Latham, ODOT Public Information (Douglas, Coos, Curry), 541-817-5200

##ODOT##