Region 1: Portland metro area Dec. 10-17, 2022
Dec. 9, 2022
22-49
There are three ways to learn about construction taking place the week of Dec. 10-17, 2022.
-
Visit TripCheck. Constantly updated with construction and crash data, TripCheck is the best way to learn about roadway conditions around the state.
-
Scroll down to the highways listed below to see impacts that affect you. Construction information is shown for one week, giving you the most up-to-date information for targeted areas in the Portland metro area.
-
Review this "quick glance" schedule. Construction information is shown for one week in a visual format, giving you information for targeted areas in the Portland metro area.
*Schedules are subject to change due to weather and other conditions.
Interstate 5 – Pacific Highway – Rose Quarter Investigations
Project Description: This project will conduct geotechnical exploration work in the I-5 Rose Quarter Improvement Project area along I-5.
Traffic Impacts: No traffic impacts.
Project website: www.i5RoseQuarter.org
Interstate 5 – Pacific Highway – SW Portland Ramp Improvements
Project Description: ODOT is repairing three ramps that access I-5 in SW Portland. These structural improvements will maintain and extend the life of our roadway system and give travelers a smoother ride.
Traffic Impacts: No traffic impacts.
Project website: https://bit.ly/swi-5repair
Interstate 84 – Columbia River Highway – A Better Red (TriMet)
Project description: TriMet is constructing a new bridge over I-84 at Gateway as part of its Better Red Project.
Traffic impacts: Nighttime single lane closures on I-84 east and west.
Shoulder closure on I-205 north between Glisan Street and Exit 22, on I-84 east and west.
Project website: https://trimet.org/betterred/
Interstate 84 – Columbia River Highway – Paving
Project Description: Paving between Multnomah Falls and Cascade Locks; repair the aging floor of the historic Toothrock Tunnel and several bridges.
Traffic impacts: Nighttime lane closures from 7 p.m. to 7 a.m. Sunday through Thursday nights as weather allows. Periodic shoulder closures.
Project website: www.i84gorgeconstruction.org
Interstate 84 – Columbia River Highway – Landslide
Project Description: Repairs to a 2021 landslide a mile west of Multnomah Falls, including a new culvert under I-84.
Traffic Impacts: Eastbound right shoulder closed. Nighttime single lane closure on I-84 west from 6 p.m. Wednesday to 7 a.m. Thursday as weather allows.
Interstate 84 – Columbia River Highway – Viento State Park to Mitchell Point Trail
Project Description: This 2.7-mile segment of trail connects the existing Historic Highway State Trail at the Viento Trailhead to Mitchell Point and includes reconnecting 0.67 miles of original sections of the Historic Highway.
Traffic impacts: Periodic single lane closures on I-84 east Monday through Thursday as weather allows.
Project website: www.i84gorgeconstruction.org
Interstate 84 – Columbia River Highway – Mitchell Point Tunnel
Project Description: The iconic Mitchell Point Tunnel was a highlight of the original Historic Highway, but the construction of Interstate 84 destroyed the tunnel. Now, we are constructing a new tunnel and Historic Highway State Trail segment adjacent to I-84 east near Exit 58.
Traffic Impacts: I-84 Exit 58 to Mitchell Point Overlook closed around-the-clock.
Project website: www.i84gorgeconstruction.org
Interstate 205 – East Portland Freeway – Exit Ramps at Division Street
Project Description: ODOT is improving safety around the intersection of I-205, SE Division Street and SE 96th Avenue through lane and ramp reconfigurations, signal improvements, new accessible curb ramps, and buffered bike lanes.
Traffic Impacts: No traffic impacts.
Project website: https://tinyurl.com/i205DivisionRamps
Interstate 205 – East Portland Freeway – Improvements Project Phase 1A Abernethy Bridge
Project Description: The I-205 Improvements Project is part of a regional Urban Mobility Strategy to comprehensively reduce congestion and crashes, while also making travel times shorter and more predictable. The first phase of the project will upgrade the Abernethy Bridge to withstand a major earthquake, improve interchanges at OR 43 and OR 99E, along with improving on- and off- ramps to improve safety. Abernethy Bridge will also be widened to accommodate a third lane in each direction. Final lane configuration will be completed in a future phase.
Traffic Impacts: Single lane closure on Clackamette Drive and OR 43 north. Auxiliary lane closure on OR 99E north. Pedestrian detours on OR 43.
Project website: i205corridor.org
U.S. 26 – Sunset Highway – Cornell Road to Sylvan interchange paving project
Project Description: We are improving approximately six miles of U.S. 26 by repaving both directions from Cornell Road to the Sylvan interchange, including several on- and off-ramps. We are also repairing bridges and bridge joints in the project area and upgrading curb ramps at each repaved on- and off-ramp to meet Americans with Disabilities Act (ADA) standards.
Traffic impacts: No traffic impacts.
Project website: bit.ly/us26pavingcornelltosylvan
U.S. 26 – Powell Boulevard – Outer Powell Transportation Safety Project
Project Description: We are constructing safety improvements to help people travel Outer SE Powell Boulevard more safely from SE 99th Avenue to SE 122nd Avenue and SE 136th Avenue to just east of SE 174th Avenue (the Portland/Gresham city limits). The first phase, from SE 122nd Avenue to SE 136th Avenue, is complete.
The overall Outer Powell Project will add a center turn lane, sidewalks and bike lanes. These improvements reduce the frequency and severity of crashes as well as help people driving, taking transit, walking and biking share the road with fewer conflicts. Pre-construction activities begin October 2022. Road construction begins in spring 2023 and will last five years.
Traffic impacts: Lane closures, traffic shifts and shoulder closures from 150th to 174th weekdays.
Project website: www.OuterPowellSafety.org
U.S. 26 – Mt. Hood Highway – Ten Eyck Road/Wolf Drive to Vista Loop Drive sidewalk
Project description: We are installing over half a mile of six-foot-wide sidewalk on the north side of U.S. 26 between Ten Eyck Road/Wolf Drive and Vista Loop Drive on the east edge of Sandy to give people a safe place to walk and roll.
Traffic impacts: Periodic daytime single lane closures on U.S. 26 west.
Project website: https://tinyurl.com/odotUS26TenEyck
U.S. 26 – Mt. Hood Highway – sidewalk curb ramps
Project Description: This project rebuilds sidewalk curb ramps along U.S. 26 in Sandy between Royal Lane and Revenue Avenue to meet ADA accessibility standards. Work will be complete the end of 2021.
Traffic Impacts: No traffic impacts. This project is complete.
Project website: www.R1ADA.org
U.S. 30 – Historic Columbia River Highway – Landslide repair
Project Description: Repairs to a 2021 landslide a mile west of Multnomah Falls, including a new culvert under the Historic Highway.
Traffic Impacts: Periodic short-term delays for trucks entering the work zone.
U.S. 30 (NW St. Helens Road) – NW Industrial Paving Project
Project description: We are making safety improvements for people walking, biking, rolling, driving and moving freight on U.S. 30 (NW St. Helens Road), between NW Bridge Avenue and NW Kittridge Avenue. We are repaving the roadway, replacing traffic signals, adjusting vehicle lane widths, building curb ramps to meet Americans with Disabilities Act (ADA) requirements and improving conditions for people biking.
Traffic impacts: Daytime single lane closures. Pedestrian detours.
Project website: bit.ly/NWIndustrialAreaRepavement
U.S. 30 BY – N Lombard Street – Safety Project
Project description: ODOT is building safety and travel-time predictability improvements for all travelers along U.S. 30 Bypass/North Lombard Street between North Fiske Avenue and North Boston Avenue. Construction impacts include lane closures through summer 2022.
Traffic impacts: Periodic daytime lane or shoulder closures.
Project website: bit.ly/LombardSafetyProject
U.S. 30 BY – St. Johns Bridge – Bridge Repair
Project description: We are improving the long-term safety and lifespan of the St. Johns Bridge by repairing the concrete on the pier columns and arches under the bridge. Repairing the concrete will protect the bridge's steel internal frame and reinforcements from corrosion, maintaining the service life of this beloved Portland Historic Landmark.
Traffic impacts: Intermittent single lane closures and signal disruptions at night.
Project website: https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899
Oregon 8 – Tualatin Valley Highway – Safety improvements project
Project Description: This project will improve traffic signals and pedestrian connectivity at eight intersections along Canyon Road (OR 8) in Beaverton and Aloha, between 110th Avenue and 192nd Avenue.
Traffic Impacts: Single lane closures from 8 p.m. to 5:30 a.m. weekdays at SW 117th, SW Hall, SW Watson, and the on-ramp to OR 217 north. Pedestrian detours.
Project website: www.OR8construction.org
Oregon 99E – McLoughlin Boulevard – Sidewalk curb ramps
Project Description: This project rebuilds sidewalk curb ramps along OR 99E from Oregon City to Milwaukie to meet ADA accessibility standards. Work will be complete the end of 2022.
Traffic Impacts: The right lane of OR 99E north at 11th Street in Oregon City is closed through Friday.
Lane closures and shifts, flaggers directing traffic, shoulder closures and sidewalk closures with pedestrian detours at 13th Street.
Project website: www.R1ADA.org
Oregon 99E – McLoughlin Boulevard – Maintenance
Project Description: Repairs to sidewalk, railing and benches along OR 99E near Sixth Street in Oregon City.
Traffic Impacts: No traffic impacts.
Oregon 99E – McLoughlin Boulevard – Paving in Canby
Project description: This project will repave and reconstruct sections of Oregon 99E between South Pine Street and Southwest Berg Parkway in Canby and make safety improvements.
Traffic impacts: Short segments of lane closures in either direction around-the-clock beginning Monday.
Project website: Bit.ly/canbypaving
Oregon 127 – Cornelius Pass Road – Arterial corridor management project
Project Description: This project will install new traffic signal controllers, vehicle detection equipment, traffic monitoring cameras and curve warning signs on Cornelius Pass Road between U.S. 30 and OR 8.
Traffic Impacts: Nighttime lane closures with flaggers directing traffic 9 p.m. to 7 a.m. Monday through Thursday.
Intersections include Cherry Drive, Quatama Street and Butler Street/Walker Road.
Project website: tinyurl.com/CorneliusPassITS
Oregon 141 – SW Hall Boulevard – ADA Ramp Improvement Project
Project Description: We are upgrading sidewalk curb ramps at approximately 14 existing intersections along Oregon 141 (SW Hall Boulevard) between SW Scholls Ferry Road and SW Locust Street. The improvements create safer and more accessible highway connections for all sidewalk users along SW Hall Boulevard.
Traffic Impacts: No traffic impacts.
Project Website: tinyurl.com/HallCurbRamps
Oregon 211 – Woodburn-Estacada Highway – sidewalk curb ramps
Project Description: This project rebuilds sidewalk curb ramps along OR 211 in Molalla between Ridings Avenue and Mathias Road and in Estacada between 2nd Avenue and Acacia Road to meet ADA accessibility standards.
Traffic Impacts: Lane shifts with bike and pedestrian detours at Beach in Estacada.
Project website: www.R1ADA.org
Oregon 212 – Clackamas Highway – Traffic Signal Upgrades
Project Description: We are installing modern traffic signal controllers, additional vehicle radar detection equipment and traffic monitoring cameras along on OR 212 (Clackamas Highway) from OR 213 (SE 82nd Drive) to Rock Creek Junction (OR 224). The new equipment will allow ODOT engineers and technicians to monitor traffic signal performance, manage congestion and improve safety along this corridor.
Traffic Impacts: Periodic daytime single lane closures.
Project Website: tinyurl.com/TrafficSignalUpgrades
Oregon 217 – Beaverton-Tigard Highway – Auxiliary Lanes
Project Description: This project will address long-standing congestion on OR 217 between Beaverton-Hillsdale Highway and OR 99W due to too many closely spaced interchanges: 10 interchanges in just over seven miles! This is some of the shortest merging spacing in the region.
Traffic impacts: Overnight traffic signal shutdown Thursday on Allen Boulevard at the southbound ramps. Flaggers directing traffic.
The right turn lane on the OR 99W southbound off-ramp is closed for several months. Right turns permitted from the middle lane. Auxiliary lane closures on OR 217 south from Scholls Ferry Road to OR 99W. Left-turns closed to/from the Allen Boulevard southbound ramps 24/7 through Dec 15.
Daytime shoulder closures on OR 217 and local roads near the highway ramps. On- and off-ramps temporarily narrowed. Short-term pedestrian detours on the north side of Hall Boulevard near Cascade Avenue and the north side of the Denney Road overpass.
Project website: www.hwy217.org
Oregon 217 – Beaverton-Tigard Highway – Pipeline (Willamette Water Supply)
Project Description: The Willamette Water Supply Program is adding a seismically-resilient water supply for Tualatin Valley Water District, City of Hillsboro, and City of Beaverton water customers.
Traffic impacts: No traffic impacts on ODOT highways.
Project website: www.OurReliableWater.org/mpe
Oregon 224 – Milwaukie Expressway – Traffic Signal Upgrades
Project Description: We are installing modern traffic signal controllers, additional vehicle radar detection equipment and traffic monitoring cameras along Oregon 224 (Milwaukie Expressway) from SE 17th Avenue to I-205. We are also adding new thermal imaging sensors at five signalized intersections on OR 224 to detect bicyclists and trigger longer green lights, allowing them more time to cross wide intersections. The new equipment will allow ODOT engineers and technicians to monitor traffic signal performance, manage congestion and improve safety along this corridor.
Traffic Impacts: Nighttime lane closures with flaggers directing traffic at the intersection of OR 224 and 82nd Drive and the on-ramp to I-205 south.
Project Website: tinyurl.com/TrafficSignalUpgrades
Various Highways – Portland metropolitan bridge screening and rail retrofit
Project Description: This project will improve safety on twelve bridges over ODOT highways in the Portland metro area by installing new fencing that will prevent fallen or thrown objects from hitting the highways below. We will also install new railings on four bridges to bring the bridges up to current safety standards. Bridges are in Portland, Hillsboro, Milwaukie, Boring, and Lake Oswego and Tigard.
Traffic impacts: Nighttime lane closures on the Ross Island Bridge Monday through Thursday.
Project website: tinyurl.com/r1BridgeScreening
Tips for driving safely in work zones
An inattentive driver is the most common cause of work zone crashes. Drivers and their passengers — not workers — make up the majority of work zone fatalities. What you can do:
-
SLOW DOWN!
- Pay attention
- Obey signs and flaggers
Know before you go! Call 511 or visit www.TripCheck.com to check routes, work zones and road and weather conditions before you head out.
|