|
October 1, 2021 For more information: Lou Torres, 503-986-2880
10-136-R2 louis.c.torres@odot.state.or.us
Astoria-Megler Bridge to close to motorists for annual 10K event on Sunday, October 10
The closure is from 8:30 to 11 a.m.
ASTORIA—The Astoria-Megler Bridge will be closed to all motorists from 8:30 to 11 a.m. on Sunday, October 10 for the annual Great Columbia Crossing 10K Run/Walk.
The Oregon Department of Transportation (ODOT), which has jurisdiction over the bridge, closes the bridge to vehicles to enhance the safety and security for participants, volunteers and motorists. ODOT works closely with the Oregon State Police, Washington Department of Transportation, City of Astoria and the event organizer, the Astoria-Warrenton Area Chamber of Commerce.
In addition, ODOT will not allow vehicles to line up to wait to cross the bridge on either the Oregon or Washington side. Motorists will be dispersed and directed away from the bridge during the event. A possible detour route during the closure is using the Lewis and Clark Bridge that connects U.S. 30 and SR 4 at Rainier and Longview.
The public needs to take note of the closure time and avoid trying to cross the bridge during that time. In order to get the bridge open by 11 a.m., participants still on the bridge at 10:50 a.m. will be picked up by shuttle bus to clear the bridge.
ODOT will post variable message signs at both ends of the bridge before the event warning motorists of the closure. TripCheck will also be updated to reflect the closure.
For updates on traffic, go to www.TripCheck.com or call 511. Access for pedestrians, including those with disabilities, is available and identified through or around work zones.
##ODOT##
|