Area 3 construction update

Having trouble viewing this email? View it as a Web page.

 

ODOT Region 2 | February 12, 2021 | 2-21-R2 | For Immediate Release

Marion, Polk, and Yamhill Counties state highway construction update: February 13 to February 20, 2021

Area 3

OR 99W: McDougall Jct. to McDonald Way

Project Description: This project is primarily grading, drainage, and paving the roadway from the west side of McMinnville through the town of Lafayette.   This job includes bridge structure surface improvements, bridge rail replacement, guard railing, signal improvements, sidewalks and ADA ramp improvements and roadside development.

Traffic Impacts: Motorist should expect intermittent, lane closures:

  • MP 29.79 (OR18 Junction) to MP 31.34 (McDougall Road)
      • Daily, Monday through Thursday, between 9:00 a.m. and 11:00 a.m.
      • Nightly, Sunday night through Friday morning, between 6:00 p.m. and 7:00 a.m.
  • MP 31.34 (McDougall Road) to MP 32.97 (Mineral Springs Road)
      • Daily, any time.
  • MP 32.97 (Mineral Springs Road) to MP 35.18 (Riverside Drive)
      • Daily, Monday through Thursday, between 9:00 a.m. and 4:00 p.m.
      • Nightly, Sunday night through Friday morning, between 6:00 p.m. and 6:00 a.m.
  • MP 35.18 (Riverside Drive) to MP 36.36 (McDonald Way)
  • Nightly, Sunday night through Friday morning, between 7:00 p.m. and 10:00 a.m.

Project Website: https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18611

 

 

OR 18: Willamina River Bridge Rail Repair

Project Description: This is a bridge rail repair project that involves restoring the concrete “F” Rail and aluminum tube rail section on one side of the bridge. This is on the business route section in the City of Willamina.

Traffic Impacts: On Willamina – Sheridan Hwy (OR18B) motorist should expect intermittent, lane closures:

  • Daily, Monday through Friday, between 9:00 a.m. and 4:00 p.m.
  • Nightly, Sunday night through Friday morning, between 6:00 p.m. and 6:00 a.m.

 

 

 

I-5: Bioswale at MP 275.29

Project Description: This is a water quality enhancement project that involves the construction of a new bioswale at one section and NB I-5 between Hubbard and Donald. This work will not occur in the travel lanes, however the shoulder will be closed and trucks will enter and exit the interstate at that location.

Traffic Impacts: On I-5 motorist should expect intermittent, lane disruptions:

  • Daily, Monday through Friday, between 9:00 a.m. and 4:00 p.m.
  • Nightly, Sunday night through Friday morning, between 6:00 p.m. and 6:00 a.m.

 

OR 99W: 1st St. to Parks Dr. (Dundee)

Project Description: This project is primarily grading, drainage, and paving the roadway from the west side of McMinnville through the town of Lafayette.   This job includes extensive roadway structure improvements, drainage, waterline, street lighting, signal improvements, pedestrian safety crossing, sidewalks and ADA ramp improvements and roadside development.

Traffic Impacts: Motorist should expect the following:

  • During the daytime, one lane of traffic, each direction, will be open to traffic.
  •  
  • Expect Intermittent, lane closures with flaggers, Pacific Hwy West (OR99W), MP 25.37 to MP 26.58
  • Nightly, Sunday night through Friday morning, between 9:00 p.m. and 4:00 a.m.

Project Website: https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17882

Region 2 bridge screening project

 

ODOT Project Manager: Bill Ness, PE

Consultant Project Manager: Riad Alharithi, Emerio Design

Contractor: Ryan Gescher, HP Civil

 

Construct standard protective screening on the following five bridges:

 

OR22 overcrossing at Albus Road - Bridge #08077

OR22 overcrossing at 72nd Avenue - Bridge #08074

OR22 overcrossing at Cordon Road - Bridge #08473

OR22 overcrossing at Lancaster Drive - Bridge #07770

OR126 overcrossing at Dersham Road - Bridge #06519A

 

Traffic Impacts:  Intermittent traffic delays (20 minute maximum) on the following overpasses and State highways below them are expected between 07:00 and 17:00 / February 8 to February 12, 2021:

 

Dersham Road – Feb 8 to Feb 12 Install posts and screening (screening to arrive Feb 10)

 

Project Website:

https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20681

 

 

 

Access for pedestrians, including those with disabilities, will be available and identified through or around work zones.