Area 3 construction update

Having trouble viewing this email? View it as a Web page.

ODOT Region 2 | February 4, 2021 | 2-16-R2 | For Immediate Release

Marion, Polk, and Yamhill Counties state highway construction update: February 6 to February 13, 2021

Area 3

OR 99W: McDougall Jct. to McDonald Way

Project Description: This project is primarily grading, drainage, and paving the roadway from the west side of McMinnville through the town of Lafayette.   This job includes bridge structure surface improvements, bridge rail replacement, guard railing, signal improvements, sidewalks and ADA ramp improvements and roadside development.

Traffic Impacts: Motorist should expect intermittent, lane closures:

  • MP 29.79 (OR18 Junction) to MP 31.34 (McDougall Road)
      • Daily, Monday through Thursday, between 9:00 a.m. and 11:00 a.m.
      • Nightly, Sunday night through Friday morning, between 6:00 p.m. and 7:00 a.m.
  • MP 31.34 (McDougall Road) to MP 32.97 (Mineral Springs Road)
      • Daily, any time.
  • MP 32.97 (Mineral Springs Road) to MP 35.18 (Riverside Drive)
      • Daily, Monday through Thursday, between 9:00 a.m. and 4:00 p.m.
      • Nightly, Sunday night through Friday morning, between 6:00 p.m. and 6:00 a.m.
  • MP 35.18 (Riverside Drive) to MP 36.36 (McDonald Way)
  • Nightly, Sunday night through Friday morning, between 7:00 p.m. and 10:00 a.m.

Project Website: https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18611

 

OR 99W: 1st St. to Parks Dr. (Dundee)

Project Description: This project is primarily grading, drainage, and paving the roadway from the west side of McMinnville through the town of Lafayette.   This job includes extensive roadway structure improvements, drainage, waterline, street lighting, signal improvements, pedestrian safety crossing, sidewalks and ADA ramp improvements and roadside development.

Traffic Impacts: Motorist should expect the following:

  • During the daytime, one lane of traffic, each direction, will be open to traffic.
  •  
  • Expect Intermittent, lane closures with flaggers, Pacific Hwy West (OR99W), MP 25.37 to MP 26.58
  • Nightly, Sunday night through Friday morning, between 9:00 p.m. and 5:00 a.m.

Project Website: https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17882

 

OR 18: Willamina River Bridge Rail Repair

Project Description: This is a bridge rail repair project that involves restoring the concrete “F” Rail and aluminum tube rail section on one side of the bridge. This is on the business route section in the City of Willamina.

Traffic Impacts: On Willamina – Sheridan Hwy (OR18B) motorist should expect intermittent, lane closures:

  • Daily, Monday through Friday, between 9:00 a.m. and 4:00 p.m.
  • Nightly, Sunday night through Friday morning, between 6:00 p.m. and 6:00 a.m.

 

OR 221: Michigan City Lane to Edgewater Street (West Salem)

Project Description: This project is primarily to enhance safety for pedestrians and resurfacing OR 221 in West Salem. This job also includes drainage, signing, signal, roadside development improvements.

Traffic Impacts: None at this time.

Project Website: https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20122

Region 2 bridge screening project

Construct standard protective screening on the following five bridges:

 

OR22 overcrossing at Albus Road - Bridge #08077

OR22 overcrossing at 72nd Avenue - Bridge #08074

OR22 overcrossing at Cordon Road - Bridge #08473

OR22 overcrossing at Lancaster Drive - Bridge #07770

OR126 overcrossing at Dersham Road - Bridge #06519A

 

Traffic Impacts:  Intermittent traffic delays (20 minute maximum) on the following overpasses and State highways below them are expected between 07:00 and 17:00 / February 1 to February 5, 2021:

 

Albus Road – February 4 – Install Screening

Dersham Road – February 1 to February 3 – Install posts and screening

 

Intermittent traffic delays (20 minute maximum) on the following overpasses and State highways below them are expected between 07:00 and 17:00 / Feb 8 to Feb 12, 2021 as follows:

 

Albus Road – February 8– Install Screening

72nd Avenue – February 9 to February 10 - Install Screening

Cordon Road – February 11 - Install Screening

 

Project Website:

https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20681

 

 

 

Access for pedestrians, including those with disabilities, will be available and identified through or around work zones.