OR 99E Canby Paving and Improvements Project

Having trouble viewing this email? View it as a Web page.

Canby OR 99E Paving and Improvements Project

Do you use OR 99E in Canby? We’re planning to repave OR 99E in Canby between South Pine Street and Southwest Berg Parkway.

We need your input! Read about the project below and visit our interactive map to describe your safety concerns or fill out a short comment form.


About the project

We are in the early design phase of a project that will repave and reconstruct sections of OR 99E between South Pine Street and Southwest Berg Parkway in Canby.

This 1-mile stretch of highway, also known as First Avenue, is a busy corridor where people visit businesses, locals connect to important places like the high school and library, and many travel through to reach homes and work. The project will add features to help everyone get around more safely when driving, biking, walking, taking transit or using mobility devices such as a wheelchair.

Schedule

Design began in 2019 and continues into 2021. Construction is planned to begin 2022.


Project Map of OR 99E in Canby

Project elements and safety benefits

  • ​​Repave the highway for the entire length of the project for a safer, smoother ride.
  • Improve traffic signals and crosswalks at South Elm Street, South Grant Street and South Ivy Street to increase safety for everyone. We are studying locations where people cross OR 99E and may close crosswalks that don’t meet safety guidelines.
  • Redesign and reconstruct the Southwest Fourth Avenue intersection near Southwest Berg Parkway for safer access near an essential destination.
  • Reconstruct sidewalk on the south side of OR 99E between La Conasuper Market and Rite Aid.
  • Update striping along the highway for narrower and consistent lanes to encourage slower, safer speeds on the busy commercial street. This may allow for bicycle lanes on both sides of the highway between Southwest Berg Parkway and South Elm Street. 
  • Install sidewalk curb ramps at all intersections to meet Americans with Disabilities Act (ADA) standards.
  • Remove unused railroad tracks. Realign tracks still in use that cross OR 99E diagonally near South Pine Street to eliminate a hazard for anyone on two wheels.
  • Partner with Canby Area Transit on improvements to increase safety and access for transit users as bus shelters are added in the area.

Two easy ways to tell us your thoughts

A look at the interactive comment map
  1. Tell us about your safety concerns or ideas on our interactive map.
  2. Tell us how you use the road and what concerns could be addressed to improve safety in a short comment form.

Questions or comments?

Katelyn Jackson, ODOT Community Affairs
Phone: (503) 731-8503
Email: Katelyn.Jackson@odot.state.or.us

FIND MORE PROJECT INFORMATION HERE.

For ADA Title II or Civil Rights Title VI accommodations, translation/interpretation services or for additional information call 503-731-4128, TTY (800) 735-2900 or use the statewide Oregon Relay Service: 7-1-1.

¿Habla usted español? Podemos proveer la información en esta publicación en español. Para recibir la información en español, por favor llamé al (503) 731-4128.


Project website:

bit.ly/canbypaving