ODOT Region 1 Weekly Construction Update: November 2-9

Having trouble viewing this email? View it as a Web page.

Region 1: Portland metro area
October 26 - November 2, 2019

November 1, 2019

19-44

There are three ways to learn about construction taking place the week of November 2-9, 2019.

  1. Visit TripCheck. Constantly updated with construction and crash data, TripCheck is the best way to learn about roadway conditions around the state.
  2. Scroll down to the highways listed below to see impacts that affect you. Construction information is shown for one week, giving you the most up-to-date information for targeted areas in the Portland metro area.
  3. Review this "quick glance" schedule. Construction information is shown for one week in a visual format, giving you information for targeted areas in the Portland metro area. 

*Schedules are subject to change due to weather and site conditions.

weekly construction calendar

Interstate 5 – Marine Drive to Fremont Bridge RealTime signs 

Project Description: This project will install advisory speed signs and traveler information signs in seven locations along I-5 between Marine Drive and I-405 in North Portland. Work will be complete in summer 2020.

Traffic Impacts: Single lane closures on Mississippi Avenue under the I-5/I-405 interchange with flaggers directing traffic, 7 a.m. to 5 p.m. Monday through Thursday.

Project website: tinyurl.com/ODOTRealTime

Interstate 5 – Marquam Bridge – Electrical and Lighting Replacement

Project Description: This project will replace the existing electrical and lighting systems for both the upper and lower decks of the Marquam Bridge.

Traffic Impacts: Intermittent nighttime lane closures on both the top and bottom decks of the Marquam Bridge 10 p.m. to 5 am. Sunday through Thursday.

Project website: bit.ly/MarquamBridge

Interstate 5 – Pacific Highway – Paving and Auxiliary Lane 

Project Description: This project will add a southbound auxiliary lane on I-5 from Lower Boones Ferry Road to I-205, add a second lane to the Lower Boones Ferry Road off-ramp from I-5 north, and pave I-5 from OR 99W to I-205.

Traffic Impacts: Periodic daytime and nighttime shoulder closures in both directions of I-5.

Project website: www.tinyurl.com/I5ODOTProject


Interstate 84 – Banfield Expressway – Regional Connections 

Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently.

Traffic Impacts: No traffic impacts. This project is complete.

For more information: www.odotrealtime.org

Interstate 84 – Columbia River Highway – Graham Road 

Project Description: This project replaces the two I-84 bridges over Graham Road (Exit 17) in Troutdale and widens Graham Road and constructs a sidewalk and bike lane.

Traffic Impacts: Daytime single lane or shoulder closures on I-84 eastbound Mondays through Fridays.

Daytime single lane or shoulder closures on Graham Road.

For more information: www.i-84Troutdale.org

Interstate 84 – Columbia River Highway – Wyeth to Lindsey Creek

Project Description: This project is constructing the next phase of the Historic Columbia River Highway State Trail. This segment will connect Wyeth Campgrounds to the State Trail at Lindsey Creek. Construction will occur through summer 2019.

Traffic Impacts: No traffic impacts.

For more information: www.oregon.gov/ODOT/Regions/Pages/State-Trail.aspx


Interstate 205 – East Portland Freeway – Glenn Jackson Bridge to Johnson Creek Boulevard

Project description: This project will pave 9 miles of I-205 between Johnson Creek Boulevard and the Glenn Jackson Bridge, including some ramps, build auxiliary lanes in three locations, install ODOT RealTime electronic signs and make pedestrian improvements at Glisan Street.

Traffic impacts: Nighttime two-lane closures northbound from Johnson Creek to the Glenn Jackson Bridge 10 p.m. to 5:30 a.m. Nighttime ramp closures on I-205 north.

Beginning as soon as Tuesday night, expect up to three lanes closed at night on I-205 north at the Glenn Jackson Bridge. Expect delays.

For more information: www.i205construction.org

Interstate 205 – East Portland Freeway – Northbound Auxiliary Lane at Sunnybrook

Project description: ODOT is improving safety and operations on Interstate 205 by building a northbound auxiliary lane between the Oregon 224 (Sunrise Expressway) on-ramp and the Sunnyside Road/Sunnybrook Boulevard interchange exit ramp (Exit 14).

Traffic impacts: No traffic impacts.

For more information: www.i205construction.org


Interstate 405 – Stadium Freeway – Ramp repairs

Project description: ODOT is repairing and replacing a number of freeway joints on the elevated sections of Interstate 405 on either side of the Fremont Bridge and from I-405 north to U.S. 26 west. Major traffic impacts will occur in 2019 and 2020.

Traffic impacts: U.S. 30 east to I-405 south closed from 8 p.m. Friday, October 25 to 10 a.m. Monday, November 4. Follow signed detour to I-405 north and I-5 south.

I-5 south ramp to I-405 south and Going St on-ramp to I-5 south are closed from 11 a.m. Friday, November 8 to 10 a.m. Monday, November 11 and have nighttime lane closures Monday through Thursday. Nighttime lane closures on I-405 north and south.

Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020.  

For more information: www.i405ramps.org


U.S. 26 – Powell Boulevard – Outer Powell Safety

Project Description: This project will construct roadway improvements on Powell Boulevard from SE 122nd Avenue to SE 136th Avenue to address the high rate of collisions on Outer Powell for the past several years. The purpose of this project is to increase safety for people who walk, drive, take the bus and ride bikes, making Outer Powell a safer place for everyone.

Traffic Impacts: Shoulder closures Monday through Saturday. Nighttime single lane closures from 8 p.m. to 6 a.m. Monday through Friday nights.

For more information: www.outerpowellsafety.org


Oregon 8 – Tualatin Valley Highway – Regional Connections 

Project description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently.

Traffic Impacts: No traffic impacts. This project is complete.

For more information: www.odotrealtime.org


Oregon 99W – Pacific Highway – Access to Transit Tigard

Project description: This project will improve safety and access to transportation at three sites on OR 99W/Pacific Highway West in Tigard and two sites on OR 99W/SW Barbur Boulevard in Portland. Improvements include bus stops, sidewalk infill, enhanced pedestrian and bike crossings, and transit operations improvements.

Traffic impacts: Intermittent daytime lane and shoulder closures on OR 99W between Naeve Street and Beef Bend Road.

Intermittent lane closures on SW Commercial Street between Lincoln Ave and Main Street from 9 a.m. to 3 p.m. Accessible detours in place.

For more information: http://tinyurl.com/OR99WTransitAccess

Oregon 99W – Barbur Blvd – Access to Transit Portland

Project description: This project will improve safety and access to transportation at three sites on OR 99W/Pacific Highway West in Tigard and two sites on OR 99W/SW Barbur Boulevard in Portland. Improvements include bus stops, sidewalk infill, enhanced pedestrian and bike crossings, and transit operations improvements.

Traffic impacts: Daytime and nighttime lane and shoulder closures on OR 99W/Barbur Blvd at 53rd Ave and at Barbur Blvd/Naito Pwky and Lane St.

Intermittent daytime traffic control at SW Lane St and SW 53rd Ave.

For more information: http://tinyurl.com/OR99WTransitAccess


Tips for driving safely in work zones

An inattentive driver is the most common cause of work zone crashes. Drivers and their passengers — not workers — make up the majority of work zone fatalities. What you can do:

  • SLOW DOWN! 
  • Pay attention
  • Obey signs and flaggers

Know before you go! Call 511 or visit www.TripCheck.com to check routes, work zones and road and weather conditions before you head out.​

For questions about the Region 1 Weekly Construction Update, contact Hope Estes at 503-731-4812 or Hope.Estes@odot.state.or.us