ODOT Region 1 Weekly Construction Update: June 1-8

Having trouble viewing this email? View it as a Web page.

Region 1: Portland metro area
June 1-8, 2019

May 31, 2019

19-22

There are three ways to learn about construction taking place the week of June 1-8, 2019

  1. Visit TripCheck. Constantly updated with construction and crash data, TripCheck is the best way to learn about roadway conditions around the state.
  2. Scroll down to the highways listed below to see impacts that affect you. Construction information is shown for one week, giving you the most up-to-date information for targeted areas in the Portland metro area.
  3. Review this "quick glance" schedule. Construction information is shown for one week in a visual format, giving you information for targeted areas in the Portland metro area. 

*Schedules are subject to change due to weather and site conditions.

Traffic impacts will be limited the weekend of May 24-May 27 due to the holiday.

Calendar of impacts

Interstate 5 – Pacific Highway – Interstate Bridge to Moda Center paving 

Project Description: This project will repave approximately six miles of Interstate 5 and exit and entrance ramps between the Interstate Bridge and the Moda Center. The project will also replace and upgrade existing signs on the mainline and on exit ramps, upgrade ADA ramps and replace the median barrier on the Hayden Island Bridge and near the North Broadway exit.

Traffic Impacts: Nighttime lane and ramp closures weekdays.

Nighttime ramp closures at Broadway/Weidler, Going Street, Rosa Parks Way, Lombard Boulevard, Victory Boulevard, Marine Drive and Jantzen Beach from 9 p.m. to 5 a.m.

Project website: i5PDXConstruction.org

Interstate 5 – Pacific Highway – Paving and Auxiliary Lane

Project Description: This project will add a southbound auxiliary lane on I-5 from Lower Boones Ferry Road to I-205, add a second lane to the Lower Boones Ferry Road off-ramp from I-5 north, and pave I-5 from OR 99W to I-205.

Traffic Impacts: Nighttime lane and ramp closures in both directions. Periodic shoulder closures.

The southbound on- and off-ramps at Lower Boones Ferry (exit 290) will be closed at night between 10 p.m. and 5 a.m. Shoulder closures.

Project website: www.tinyurl.com/I5ODOTProject


Interstate 84 – Columbia River Highway – Graham Road 

Project Description: This project replaces the two I-84 bridges over Graham Road (Exit 17) in Troutdale and widens Graham Road and constructs a sidewalk and bike lane.

Traffic Impacts: Nighttime lane closures from 10 p.m. to 5:30 a.m. Nighttime single lane closures on I-84 and daytime lane closures on Graham Road.

For more information: www.i-84Troutdale.org

Interstate 84 – Columbia River Highway – Wyeth to Lindsey Creek

Project Description: This project is constructing the next phase of the Historic Columbia River Highway State Trail. This segment will connect Wyeth Campgrounds to the State Trail at Lindsey Creek. Construction will occur through summer 2019.

Traffic Impacts: Single lane closure for eastbound I-84 and shoulder closures from 8 a.m. to 6 p.m. Monday through Thursday.

For more information: www.oregon.gov/ODOT/Regions/Pages/State-Trail.aspx


Interstate 205 – East Portland Freeway – Glenn Jackson Bridge to Johnson Creek Boulevard

Project description: This project will pave 9 miles of I-205 between Johnson Creek Boulevard and the Glenn Jackson Bridge, including some ramps, build auxiliary lanes in three locations, install ODOT RealTime electronic signs and make pedestrian improvements at Glisan Street.

Traffic impacts: Nighttime lane and ramp closures. 

Periodic nighttime single and double lane closures in both directions and periodic ramp closures.

Periodic nighttime ramp closures at the northbound Exit 20 toward Washington and Stark Streets, the southbound Washington Street on-ramp, and northbound Exit 23B to Killingsworth Street/U.S. 30 Bypass.

Periodic daytime single lane closures in both directions on Glisan Street and on Washington and Stark. Pedestrian detours at Washington, Stark and Glisan Streets.

For more information: www.i205construction.org

Interstate 205 – East Portland Freeway – Northbound Auxiliary Lane at Sunnybrook

Project description: ODOT is improving safety and operations on Interstate 205 by building a northbound auxiliary lane between the Oregon 224 (Sunrise Expressway) on-ramp and the Sunnyside Road/Sunnybrook Boulevard interchange exit ramp (Exit 14).

Traffic impacts: Nighttime lane closures from 8 p.m. to 5 a.m.

For more information: www.i205construction.org


Interstate 405 – Stadium Freeway – Ramp repairs

Project description: ODOT is repairing and replacing a number of freeway joints on the elevated sections of Interstate 405 on either side of the Fremont Bridge and from I-405 north to U.S. 26 west. Major traffic impacts will occur in 2019 and 2020.

Traffic impacts: Nighttime lane closures on the ramp from I-5 south to I-405 south and nighttime Interstate Avenue southbound closure.

Lane closures on the ramp from I-5 south to I-405 south from 9 p.m. to 5 a.m. Monday through Friday nights.

North Interstate Avenue will be closed to southbound vehicles from south of the Kaiser Permanente Building to North Knott Street from 8 p.m. to 5 a.m. Monday through Thursday nights. Bicycle and Pedestrian access maintained until North Graham Street. Follow signed detours.

Shoulder closure on N Kerby/N Cook on-ramp to I-405 south from 8 p.m. to 6 a.m. weekdays.

Single lane 24/7 closure on N Kerby/N Cook on-ramp until fall 2020.

For more information: www.i405ramps.org


U.S. 26 – Powell Boulevard – Safety Improvements

Project Description: This project will make safety improvements on Powell Boulevard from Southeast 20th to 34th Avenues. Improvements include installing pedestrian activated beacons, new signs improved lighting, and crosswalk and sidewalk improvements.

Traffic Impacts: Periodic daytime single lane closures from 7 a.m. to 3:30 p.m. and nighttime single lane closures from 8 p.m. to 5 a.m. in both directions.

For more information: www.powellblvdsafety.org

U.S. 26 – Powell Boulevard – Outer Powell Safety

Project Description: This project will construct roadway improvements on Powell Boulevard from SE 122nd Avenue to SE 136th Avenue to address the high rate of collisions on Outer Powell for the past several years. The purpose of this project is to increase safety for people who walk, drive, take the bus and ride bikes, making Outer Powell a safer place for everyone.

Traffic Impacts: Weekday shoulder closures. Watch for crews and equipment. Nighttime single lane closures from 8 p.m. to 6 a.m. Monday through Thursday.

For more information: www.outerpowellsafety.org


U.S. 30 – Lower Columbia River Highway – McCarthy Creek Bridge Repair

Project Description: ODOT is resurfacing the U.S. 30 bridge over McCarthy Creek in Multnomah County just east of the intersection of U.S. 30 and NW Cornelius Pass Road.

Traffic Impacts: No traffic impacts. This project is complete.

For more information: https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20077


Oregon 8 – Tualatin Valley Highway – Regional Connections 

Project description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently.

Traffic Impacts: Lane closures and pedestrian detours on 185th Avenue.

For more information: www.odotrealtime.org


Oregon 43 – Hood/Macadam Avenues – Bridge Maintenance

Project description: This project will improve the load rating and maintain long-term safety of the bridge carrying I-5 traffic over SW Hood Avenue.

Traffic Impacts: Daytime shoulder closures.  

For more information: tinyurl.com/HoodAveMaintenance


Oregon 99E – McLoughlin Boulevard – Tunnel Improvements 

Project description: This project improves the lighting in the vehicle and pedestrian tunnels on McLoughlin Boulevard near downtown Oregon City. It also installs a new variable message sign on the side of the tunnel to alert northbound drivers of conditions ahead.

Traffic Impacts: Single and double lane closures with flaggers directing traffic from 7 p.m. to 5 a.m. weekdays.

For more information: www.bit.ly/OCTunnellighting

Oregon 99W – Pacific Highway – Sidewalk Improvements

Project description: This project will add sidewalk in two different locations in King City: on OR 99W southbound from SW Royalty Parkway to SW Durham Road and on SW Royalty Parkway from SW 116th Avenue up to the existing sidewalk.  Work will conclude in summer 2019.

Traffic impacts: Daytime bike lane closure and shoulder closures. Periodic nighttime single lane closures on southbound OR 99W.

Project website: www.tinyurl.com/KingCitySidewalks


Oregon 281 – Tucker Road – County intersection improvements

Project description: ODOT and Hood River County are constructing intersection improvements, including widening the roadway at the intersections to better accommodate truck turning movements at two locations in Hood River County: OR 281, also known as Tucker Road, at Guignard Drive and Country Club Road at Barrett Drive.

Traffic impacts: Daytime lane closures with flaggers directing traffic at both intersections (Tucker Road at Guignard and Country Club at Barrett).   

Project website: www.tinyurl.com/HRintersections


Tips for driving safely in work zones

An inattentive driver is the most common cause of work zone crashes. Drivers and their passengers — not workers — make up the majority of work zone fatalities. What you can do:

  • SLOW DOWN! 
  • Pay attention
  • Obey signs and flaggers

Know before you go! Call 511 or visit www.TripCheck.com to check routes, work zones and road and weather conditions before you head out.​

For questions about the Region 1 Weekly Construction Update, contact Katelyn Jackson at 503-731-8503 or Katelyn.Jackson@odot.state.or.us.