ODOT Region 1 Weekly Construction Update: October 13-20
Oregon Department of Transportation sent this bulletin at 10/12/2018 12:20 PM PDTOctober 12, 2018
For more information: Katelyn Jackson 503-731-8503
Katelyn.Jackson@odot.state.or.us
Weekly Construction Update:
October 13-20, 2018*
*Schedules are subject to change due to weather and site conditions.
1. Visit TripCheck. Constantly updated with construction and crash data, TripCheck is the best way to learn about roadway conditions around the state.
2. Scroll down to the highways listed below to see impacts that affect you. Construction information is shown for one week, giving you the most up-to-date information for targeted areas in the Portland-metro region
3. Review this "quick glance" schedule. Construction information is shown for one week in a visual format, giving you the most up-to-date information for targeted areas in the Portland-metro region.
Interstate 5 – Pacific Highway – at I-84 interchange
Project Description: This project will repair and resurface the bridges that connect I-84 and I-5.
Traffic Impacts: Expect nighttime and weekend closures of the ramp from I-5 south to I-84 east until Oct. 22 and the ramp from I-84 west to I-5 north beginning Tuesday.
Nighttime closures are 10 p.m. to 5 a.m. and weekend closures are 10 p.m. Friday to 5 a.m. Monday.
For more information: www.i84construction.org
Interstate 5 – Pacific Highway – Interstate Bridge to Moda Center paving
Project Description: This project will repave approximately six miles of Interstate 5 and exit and entrance ramps between the Interstate Bridge and the Moda Center. The project will also replace and upgrade existing signs on the mainline and on exit ramps, upgrade ADA ramps and replace the median barrier on the Hayden Island Bridge and near the North Broadway exit.
Traffic Impacts: Periodic nighttime lane and ramp closures in both directions of I-5 from 8 p.m. to 5 a.m. between the Interstate Bridge and Moda Center.
Daytime work at Victory Boulevard, Marine Drive and Rosa Parks Way Monday through Thursday.
For more information: www.oregon.gov/odot/projects/pages/project-details.aspx?project=17516
Interstate 5 – Pacific Highway – Paving and Auxiliary Lane
Project Description: This project will add a southbound auxiliary lane on I-5 from Lower Boones Ferry Road to I-205, add a second lane to the Lower Boones Ferry Road off-ramp from I-5 north, and pave I-5 from OR 99W to I-205.
Traffic Impacts: Nighttime lane closures and ramp closures. Saturday night, Oct. 13 traffic in both directions will detour at Lower Boones Ferry Road using the off- and on-ramps.
Southbound and northbound I-5 will be closed at Lower Boones Ferry Road from 11 p.m. Saturday, Oct. 13 to 6 a.m. Sunday. All traffic in both directions will be detoured off at Lower Boones Ferry Road and will be directed to re-enter the freeway via the Lower Boones Ferry on-ramp.
The following southbound ramps will be closed at night next week: Exit 291 toward Carman Drive, Exit 290 toward Lower Boones Ferry, Exit 289 on-ramp toward Nyberg Street and the ramp from I-5 south to I-205.
For more information: www.tinyurl.com/I5ODOTProject
Interstate 5 – Pacific Highway – Sagert Street Bridge repairs
Project Description: Repairs on the Sagert Street overpass for I-5 in Tualatin are underway after an overheight vehicle damaged the structure.
Traffic Impacts: Expect flagging on Sagert Street at night. Periodic closures of the Nyberg Street on-ramp to southbound I-5 (exit 289).
For more information: www.tualatinoregon.gov/publicworks/sagert-street-overpass-repairs
Interstate 84 – Banfield Expressway – Regional Connections
Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently. New electronic signs will be installed on I-84 between I-5 and I-205. During sign installations, there will be several full nighttime freeway closures.
Traffic Impacts: No traffic impacts.
For more information: www.odotrealtime.org
Interstate 84 – Banfield Expressway – Bridge joint maintenance
Project Description: This project will perform maintenance work on bridge joints at NE 148th Avenue, NE 162nd Avenue I-84 bridges.
Traffic Impacts: Nighttime lane closures on I-84 eastbound at 162nd Avenue.
Interstate 84 – Columbia River Highway – Wyeth to Lindsey Creek
Project Description: This project is constructing the next phase of the Historic Columbia River Highway State Trail. This segment will connect Wyeth Campgrounds to the State Trail at Lindsey Creek. Construction will occur through summer 2019.
Traffic Impacts: Daytime single lane closures for eastbound I-84 from milepost 51-53 Monday through Wednesday from at 6 a.m. to 6 p.m. and until 2 p.m. Thursday.
Periodic shoulder closures.
For more information: www.oregon.gov/ODOT/Regions/Pages/State-Trail.aspx
Interstate 205 – East Portland Freeway – Glenn Jackson Bridge to Johnson Creek Boulevard
Project Description: This project will pave 9 miles of I-205 between Johnson Creek Boulevard and the Glenn Jackson Bridge, including some ramps, build auxiliary lanes in three locations, install ODOT RealTime electronic signs and make pedestrian improvements at Glisan Street.
Traffic Impacts: Nighttime double lane closures in both directions from 8 p.m. to 5:30 a.m.
The southbound auxiliary lane between Stark Street and Division Street is now open during the day.
For more information: www.i205construction.org
Interstate 205 – East Portland Freeway – Shared Use Path at Maywood Park
Project Description:This project repaves the section of the I-205 Shared Use Path that runs through Maywood Park between the pedestrian bridge at I-84 near Northeast Fremont Street until Northeast Prescott Street.
Traffic Impacts: Expect pedestrian and cyclist detours for path users and up-to 20 minute delays.
For more information: http://bit.ly/I205MUP
Interstate 405 – Stadium Freeway – Striping maintenance
Project Description: This Friday and Saturday night crews will be painting new stripes on I-405 northbound as well as some on and off ramps. One lane of traffic at a time will see rolling slow-downs to allow paint to dry, which takes about 20 minutes. Some on and off ramps may close for up to 20 minutes. Striping activities may continue on I-405 over the next few weekends, as weather allows.
Traffic Impacts: Nighttime lane closures on I-405 northbound and short term ramp closures Friday, Oct. 12 and Saturday, Oct. 13.
U.S. 26 – Sunset Highway – Cornelius Pass Road to 185th Avenue
Project Description: This project will widen U.S. 26 to three lanes in each direction between Cornelius Pass Road and NW 185th Avenue, replace the two Rock Creek bridges with one bridge, improve the north side of the Cornelius Pass Road interchange and build a sound wall on the north side of U.S. 26 westbound in the Rock Creek neighborhood.
Traffic Impacts: Periodic shoulder closures.
For more information: www.cornpass185.org
U.S. 26 – Sunset Highway – Regional Connections
Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently. New electronic signs will be installed on U.S. 26 between I-405 and OR 217 and on I-84 between I-5 and I-205. New technology will be installed on TV Highway from OR 217 to Brookwood Parkway and on local Washington County roads.
Traffic Impacts: No traffic impacts.
For more information: www.odotrealtime.org or 24-hour noise hotline at 971-673-5239.
U.S. 26 – Powell Boulevard – Safety Improvements
Project Description: This project will make safety improvements on Powell Boulevard from Southeast 20th to 34th Avenues. Improvements include installing pedestrian activated beacons, new signs improved lighting, and crosswalk and sidewalk improvements.
Traffic Impacts: Daytime single lane closures from 9 a.m. to 3 p.m.
For more information: www.powellblvdsafety.org
U.S. 26 – Mt. Hood Highway – Boring Road Bridge Raising
Project Description: The SE 282nd Avenue/Boring Road overpass will be raised, repaired and resurfaced in 2018
Traffic Impacts: Westbound lane closures from 9 a.m. to 3 p.m. and eastbound lane closures from 8 a.m. to 2 p.m. Narrow shoulders.
For more information: www.boringrdbridge.org
U.S. 26 – Mt. Hood Highway – Mirror Lake (Milepost 52)
Project Description: Relocate the Mirror Lake trailhead and parking lot along U.S. 26 west of Government Camp.
Traffic Impacts: Flaggers will direct travelers weekdays during daylight hours. Expect 20-minute delays.
For more information: flh.fhwa.dot.gov/projects/or/mirror-lake
Oregon 8 – Tualatin Valley Highway – Regional Connections
Project Description: This project is the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently.
Traffic Impacts: Pedestrian detours on local roads.
For more information: www.odotrealtime.org
Oregon 213 – 82nd Avenue – SE Lindy Street to SE King Road
Project Description: This project will pave SE 82nd Avenue from SE Lindy Street to SE King Road and install new sidewalk curb ramps.
Traffic Impacts: Expect periodic day and nighttime single lane closures.
For more information: lmsc.82ndaveprojects.com
Oregon 213 – 82nd Avenue – Signal Upgrades
Project Description: This project will upgrade traffic signals and install sidewalk curb ramps on SE 82nd Avenue at the intersections of SE Foster Road, SE Woodstock Boulevard and SE Flavel Street. Construction is expected through 2018.
Traffic Impacts: Day and nighttime single lane closures from 7 p.m. to 3 p.m. weekdays and pedestrian detours at Foster, Woodstock and Flavel.
For more information: www.Tinyurl.com/82ndAveSignals
Oregon 213 – Cascade Highway South – South Union Mills
Project Description: This project will improve safety on OR 213 at the intersection of South Union Mills Road by leveling out the crest of the hill to increase driver’s ability to see oncoming and turning traffic. This project will also add a standard right-turn lane on Union Mills and a center turning lane on OR 213 for southbound traffic.
Traffic Impacts: Minor delays on Union Mills Road during driveway repair.
For more information: www.OR213UnionMills.org
Oregon 213 – Cascade Highway South – Highway repairs in Mulino
Project Description: Crews are constructing a pavement repair at the site of an ancient landslide on OR 213 in Mulino near South Eldorado Road.
Traffic Impacts: Flaggers will be periodically directing traffic. Travelers should expect delays.
For more information: www.oregon.gov/odot/projects/pages/project-details.aspx?project=SHHR
Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону (503) 731-4128.
이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: (503) 731-4128.
如果 您想了解这个项目翻译成简体中文的相关信息,请致电 (503) 731-4128.
For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information call (503) 731-4128, TTY (800) 735-2900 or Oregon Relay Service 7-1-1.