For more information contact: Abbey Driscoll, Community Liaison 541-388-6064 abbey.driscoll@odot.state.or.us
Region 4 Weekly Construction Update
Week of September 10, 2018
The Oregon Department of Transportation is committed to providing a safe, efficient transportation system. ODOT invests in Oregon’s future through roadway improvement projects. The following projects are located in ODOT's Region 4 encompassing Central Oregon from The Dalles to Klamath Falls on the east side of the Cascades.
All work is dependent on weather conditions and schedules are subject to change.
Where traffic is routed through or around a work zone, pedestrians,
including those with disabilities, will also be provided alternate routes through the work zone.
Crook County
OR 126 @ Tom McCall Roundabout (Prineville) - Alex Hodge Construction will be performing miscellaneous shoulder work and installing signs throughout the project. No traffic impacts are expected.
Deschutes County
US 97: Sunriver Interchange to OR 31 (La Pine) - Roy Houck Construction will continue excavating for drainage swales and sidewalk ramps on US 97 in La Pine between 4th Street and 6th Street . There will be shoulder closures and slow traffic. The Contractor will also be grinding and paving at night on US97 between Sunriver and La Pine, with one-way traffic with flaggers and pilot cars between 6 pm and 7 am, with traffic delays of up to 20 minutes.
US 20: Jack Lake Road to Pine Street (Sisters) - Oregon Mainline Paving will continue installing signs and other safety features. There may be corrective work at night, with one-way traffic with flaggers and pilot cars between 7 pm and 7 am Sunday to Thursday nights, and traffic delays of up to 20 minutes. There may be shoulder work during the day.
Jefferson County
US 97: US 26 Jct. to NW 10th Street (Madras - Terrebonne) - Knife River is complete except for corrective work. There may be passing lanes closed at the Crooked River Bridge, as well as shoulder work during the day.
US 97: Spanish Hollow Creek & Trout Creek Bridges - Stellar J Corporation is performing bridge replacement work. Traffic is reduced to a single lane through the work zone and is controlled by temporary signals, minor delays anticipated.
Klamath County
OR 140: Buck Creek Bridge- Marcum & Sons Construction is replacing the Buck Creek Bridge (MP 22). Traffic will be controlled by a temporary signal and limited to a single lane. Work will take place Monday through Friday during daytime hours. Drivers can expect delays up to 10 minutes.
OR 140: Brown Creek (Beatty) - La Duke Construction will be completing survey and earthwork. A temporary signal will be installed this week. Expect delays up to 15 minutes.
OR 140: Greensprings Interchange to Klamath Falls/Malin Hwy - Rocky Mountain Construction will be completing sidewalk and shoulder work during the day. Minor delays are expected.
US 97: Algoma Road to Miller Island Road - Rocky Mountain Construction will be on site completing night paving work from 7pm to 7am Sunday night through Friday morning. The work zone is controlled with flaggers and pilot cars. Expect delays up to 20 minutes.
US 97: Spring Creek Hill to Modoc Point - Rocky Mountain Construction will be on site completing night work from 7pm to 7am Sunday night through Friday morning. The work zone is controlled with flaggers and pilot cars, expect 20 minute delays.
Lake County
US 395: South Fork Crane Creek - No on site work expected.
OR 140: Antelope Creek to Odegaard Road - LaDuke Construction will be on site completing shoulder work. Expect minor delays.
Sherman County
US 97: Spanish Hollow Creek & Trout Creek Bridges - The contractor will be performing work onsite 24 hours a day, and will have single closures controlled with flaggers periodically. Expect minimal Delays.
US 97: Shaniko to Trout Creek - High Desert Aggregate and Paving will not be on site this week. Expect no delays.
Wasco County
I-84: Hood River to Tower Road - Oregon Mainline Paving will not be onsite this week. Expect no delays.
Various
Region 4 Curve Warning Signs - Baker Rock Resourceswill be installing signs on the Shaniko to Fossil Highways (OR 218) between milepost 0 and 42. Traffic can expect one-way traffic with flaggers and delays of up to 20 minutes.