Central Oregon Highway Construction Update
For further information contact:
Peter Murphy
541-388-6224
Central Oregon Highway Construction Update
Week of August 6, 2018
The Oregon Department of Transportation is committed to providing a safe, efficient transportation system. ODOT invests in Oregon’s future through roadway improvement projects. The following projects are located in ODOT's Region 4 encompassing Central Oregon from The Dalles to Klamath Falls on the east side of the Cascades.
All work is dependent on weather conditions and schedules are subject to change.
Where traffic is routed through or around a work zone, pedestrians, including those with disabilities, will also be provided alternate routes through the work zone.
Crook County
OR 126 @ Tom McCall Roundabout - Contractor will be grinding and paving the tie-ins to the new Tom McCall and other connecting roads south of the roundabout, as well as installing new sidewalks and signs. There may be flagging operations on side roads, but no traffic impacts are expected to Hwy 126.
Deschutes County
US 97: Sunriver Interchange to OR 31 - Contractor will continue excavating and installing storm drains, sidewalks and ramps on the westside of US 97 in La Pine. There will be shoulder closures and slow traffic. Contractor will also be grinding and paving at night on OR31, with one-way traffic with flaggers and pilot cars between 7 pm and 7 am, with traffic delays of up to 20 minutes. Grinding and paving may move to US 97 between Sunriver and La Pine late in week.
US 20: Jack Lake Road to Pine Street (Sisters) - Contractor will be installing striping and grading shoulders. Work will occur Sunday to Thursday night. There will be one-way traffic with flaggers and pilot cars between 7 pm and 7 am, with traffic delays of up to 20 minutes.
Jefferson County
US 97: US 26 Jct. to NW 10th Street (Madras - Terrebonne) - Contractor will be installing striping and other safety features. There will be one-way traffic with flaggers and pilot cars between 7 pm and 7 am Sunday to Thursday nights, with traffic delays of up to 20 minutes. There may be shoulder work during the day, and passing lanes may be closed.US 97:
Spanish Hollow Creek & Trout Creek Bridges - Stellar J Corporation is performing bridge replacement work. Traffic is reduced to a single lane through the work zone and is controlled by temporary signals, minor delays anticipated.
Klamath County
OR 140: Buck Creek Bridge - Marcum & Sons Construction is replacing the Buck Creek Bridge (MP 22). Bridge Work, temporary signal installed expect 10 minute delays.
OR 140: Brown Creek (Beatty) - Sign installation, survey, and earthwork. Expect minor delays.
OR 140: Greensprings Interchange to Klamath Falls/Malin Hwy - Sidewalk and shoulder work during the day, expect minor delays.
US 97: Algoma Road to Miller Island Road - No work expected this week.
US 97: Spring Creek Hill to Modoc Point - Night paving work from 7:00 pm to 7:00 am Sunday thru Friday. Work zone controlled with flaggers and pilot cars, expect 20 minute delays.
Lake County
US 395: South Fork Crane Creek - Box Culvert work, expect minor delays.
OR 140: Antelope Creek to Odegaard Road - Shoulder work, expect minor delays.
Sherman County
US 97: Spanish Hollow Creek & Trout Creek Bridges - The contractor will be performing work onsite 24 hours a day, and will have single closures controlled with flaggers periodically.
Expect minimal Delays.
South Work Zone - US97 over Trout Creek (MP 75) – Stellar J Corporation is performing bridge replacement work. Traffic is reduced to a single lane through the work zone and is controlled by temporary signals, minor delays anticipated.
US 97: Shaniko to Trout Creek - High Desert Aggregate and Paving will not be on site until late August.
Wasco County
I-84: Hood River to Tower Road - The Contractor will be onsite this week working on signs and other misc. items throughout the project from MP76 to MP64. There will be single lane closures East and West Bound. Expect no delays.
Various
Region 4 Curve Warning Signs - Baker Rock Resources will be installing signs on the Paulina Highway (OR 380). There may be one-way traffic with flaggers and delays of up to 20 minutes.