East and westbound I-240 will be closed between Bryant Ave. and
Sunnylane Rd. from 7 p.m. tonight to 6 a.m. Saturday for bridge resurfacing.
Traffic will be diverted to Sunnylane Rd. off-ramps and immediately back onto
I-240 bypassing the bridge. Motorists should be prepared for delays and
plan an alternate route if possible.
Sunnylane Rd. will be closed between S.E. 59th St. and S.E. 89th
St. from 7 p.m. tonight to 6 a.m. Saturday as part of the bridge resurfacing
project.
Additionally east and westbound I-240 will be closed between Bryant Ave. and Sunnylane Rd. from 7 p.m. Monday to 6 a.m. Tuesday continuing daily through Thursday for bridge resurfacing. Traffic will be diverted to Sunnylane Rd. off-ramps and immediately back onto I-240. Sunnylane Rd. will be closed between S.E. 59th St.
I-35 narrows at S.E. 15th St. Saturday, next week;
Compress Ave., S.W. 3rd St. closed downtown through 2016
Other closures for work on the Oklahoma City Boulevard include:
Northbound
I-35 will be narrowed to one lane between S.E. 15th St. and the
I-235/I-40/I-35 Dallas Junction from 8 a.m. to 8 p.m. Saturday. for an
ongoing construction project related to the OKC Boulevard. Motorists are
advised to expect delays or locate an alternate route.
Northbound I-35 will be narrowed to one lane between S.E. 15th St. and the
I-235/I-40/I-35 Dallas Junction from 9 a.m. to 5:30 p.m. Monday through
June 10
Compress
Ave. is closed east of E.K. Gaylord Blvd. and south of Oklahoma Ave. in Bricktown.
S.W.
3rd St. is closed at the E.K. Gaylord Blvd. intersection. This street will be
reconstructed in a future phase of the OKC Boulevard.
Motorists can expect intermittent, temporary lane closures on Shields Blvd./E.K. Gaylord Blvd. through 2016 for ongoing construction of the new BNSF railroad bridge just to the east of E.K. Gaylord Blvd.
The speed limit remains reduced to 35 mph along E.K. Gaylord Blvd.
due to the ongoing nearby work.
I-44 narrows at Classen Blvd.; ramp at Northwest Expressway closed Sunday
Westbound I-44 will be narrowed to one lane between Classen Blvd. and Northwest Expressway from 8 a.m. to 5 p.m. Sunday for bridge repair.
Additionally the westbound I-44 off-ramp to Northwest Expressway will be closed from 8 a.m. to 5 p.m.
I-35 narrows in Goldsby tonight
through June
Drivers can expect the following lane closures on I-35 in Goldsby
daily beginning tonight and continuing through June for a cable barrier
installation project. No work will be done on weekends.
Southbound
I-35 will be narrowed to one lane between SH-9 West and Ladd Rd. from 6
a.m. to 4 p.m. daily.
Northbound
I-35 will be narrowed to one lane between Ladd Rd. and SH-9 West from 9
a.m. to 8 p.m. daily.
I-235 narrows near N. 6th St. Monday
Southbound I-235 will be intermittently narrowed to one lane between N. 6th St. and I-40 from
1 p.m. to 4 p.m. Monday for drainage structure repair.
I-44 ramp at N.W. 10th St. closes next week
The westbound I-44 (going south) on-ramp from N.W. 10th St. will be closed intermittently from 7 a.m. to 5:30 p.m. daily starting Monday continuing daily through June 10 as part of an on-going bridge rehabilitation project. Drivers must locate an alternate route.
I-35 narrowed near Guthrie
through fall 2016
Motorist can expect the following lane closures for a resurfacing
project that continues through fall 2016:
Northbound
I-35 is narrowed to one lane from the SH-33 to the Cimarron River.
Southbound I-35 is narrowed to one lane from the
Cimarron River to US-77.
On-going Construction Projects:
SH-74 (Portland Ave.) lanes
shifted at N.W. 164th St.; intersection at N.W. 164th St. a four-way stop
Southbound
SH-74 (Portland Ave.) traffic is shifted to the new southbound lanes
between N.W.164th St. and Memorial Rd.
Northbound
SH-74 (Portland Ave.) traffic is shifted to the new northbound lanes
between Memorial Rd. and N.W. 164th St.
North
and southbound traffic will remain one lane at this time as highway
widening continues.
The
intersection of SH-74 and N.W. 164th St. will remain a four-way stop
through early June for ongoing traffic signal work.
The
speed limit is also reduced to 35 mph until the project is complete in
summer 2016. Drivers should plan extra travel time and use caution in the
work zone.
I-240 lane and ramp closures at
Shields Blvd., I-240 Service Rd.
Motorist can expect the following lane and ramp closures for ramp
reconstruction as part of the ongoing I-35/I-240 Crossroads interchange
reconstruction:
The
eastbound I-240 off-ramp to Shields Blvd. is closed. Drivers should use
the Santa Fe Ave. off-ramp as an alternate route.
The
westbound I-240 on-ramp from Shields Blvd. is closed. Drivers should use
the Santa Fe Ave. on-ramp as an alternate route.
Westbound
I-240 Service Rd. is narrowed to one lane at Shields Blvd. Drivers can
make left turns to Shields Blvd.
The
eastbound I-240 Service Rd. will be narrowed to one lane at Shields Blvd.
This phase of
reconstruction of the I-35/I-240 Crossroads interchange continues through fall
2017. The speed limit is reduced and drivers should plan extra travel
time. More information: https://www.ok.gov/odot/Crossroads_Renewal_240.html
33rd St. traffic shifted to new lanes at US-77 (Broadway) in
Edmond through summer 2016
Drivers can expect lane shifts and the following closures at the
intersection of US-77 (Broadway) and 33rd St. in Edmond:
US-77
(Broadway) will have intermittent lane closures
Northbound
US-77 (Broadway) is narrowed to one left-turn lane
Eastbound
and westbound 33rd St. is narrowed to one lane through the intersection,
and traffic has shifted to the new pavement on the south half of the
roadway. Drivers may still turn right or left at the intersection.
Drivers should expect lengthy delays and are strongly encouraged
to plan for extra time or to use an alternate route. This reconstruction and
widening project continues through summer 2016. More
information: http://www.ok.gov/odot/33rd_Broadway.html
I-40 narrows to one lane at I-40 Business near El Reno through
June
Drivers can expect intermittent lane closures on both east and
westbound I-40 at I-40 Business through June for bridge work. Eastbound
will be open during morning rush hour, westbound will be open during evening
rush hour.
I-40 narrows intermittently in El Reno through 2016
Drivers can expect intermittent lane closures on I-40 two miles
east of US-81 for on-going interchange construction at Radio Rd. continuing
through 2016.
The City of El Reno has a companion widening project on Radio Rd.
For more information about this project, call the City of El Reno at
405-262-4070.
I-40 ramps at Anderson Rd. closed through summer for city project
The east and westbound I-40 on and off-ramps at Anderson Rd. are
closed through summer for a City of Oklahoma City project. For questions,
contact the City's Department of Public Works at 405-297-2581.
I-240 Service Rd. turnaround closes, May Ave. narrows at I-240
nightly through May
The westbound I-240 Service Rd. protected turnaround (Texas
turnaround) at May Ave. will be closed and northbound May Ave. will be narrowed
to one lane at I-240 from 7 p.m. to 3 a.m. nightly through May for bridge
painting. The westbound I-240 off-ramp will remain open to traffic.
SH-9 lanes shifted at 36th Ave. in Norman through 2016
Drivers can expect lane shifts and a reduced speed limit on SH-9
between 36th Ave. S.E. and 72nd Ave. S.E. through 2016 for ongoing highway
reconstruction and widening.
Lindsey St. bridge, ramps at I-35 in Norman closed; detour on SH-9
East through early 2017
The
Lindsey St. bridge over I-35 and all I-35 on- and off-ramps at Lindsey St.
are closed through early 2017 for interchange reconstruction.
Drivers,
including University of Oklahoma traffic, should use the I-35 on-and
off-ramps at SH-9 East.
Lindsey
St. traffic is detoured on Ed Noble Parkway/28th Ave. S.W., SH-9 East and
24th Ave. S.W.
Speed limits are reduced and drivers should expect delays on I-35,
especially during peak travel periods, and plan extra time or consider an
alternate route such as SH-77H (Sooner Rd.)
Meridian Ave. narrowed at S.W. 29th St. through fall 2016
Meridian Ave. is narrowed to one lane in each direction between
S.W. 29th St. and just north of S.W. 15th St. for a resurfacing and widening
project in partnership with the City of Oklahoma City. The project is expected
to continue through fall 2016.
MacArthur Blvd. narrows intermittently at N.W. 50th St. through
June
Drivers can expect intermittent lane closures on MacArthur Blvd.
at N.W. 50th St. continuing through June for an on-going
intersection and streetscape project in partnership with the City of Warr
Acres.
Follow @OKDOT on twitter.com and Know B4 U Go! Check www.oktraffic.org for real-time traffic information ODOT strongly discourages texting or tweeting while driving.