I-240 lane and ramp closures at
Shields Blvd., S.E. 74th St. (I-240 Service Rd.)
The
eastbound I-240 off-ramp to Shields Blvd. is closed for ramp
reconstruction and reversal as part of the ongoing I-35/I-240 Crossroads
interchange reconstruction. Motorists are advised to find an alternate
route.
The
westbound I-240 on-ramp from Shields Blvd. is closed
Westbound
S.E. 74th St. (I-240 Service Rd.) is narrowed to one lane at Shields Blvd.
Drivers can make left turns to Shields Blvd.
The
eastbound I-240 Service Rd. will be narrowed to one lane at Shields Blvd.
This phase of reconstruction of the I-35/I-240 Crossroads
interchange continues through fall 2017. The speed limit is reduced and
drivers should plan extra travel time. More information: https://www.ok.gov/odot/Crossroads_Renewal_240.html
SH-74 (Portland Ave.) lanes shifted at N.W. 164th.; intersection at N.W. 164th St. a four-way stop
Southbound SH-74 (Portland
Ave.) traffic is shifted to the new
southbound lanes between N.W.164th St. and Memorial Rd.
Northbound SH-74 (Portland Ave.)
traffic is shifted to the new northbound lanes between Memorial Rd. and N.W. 164th
St.
The intersection of SH-74 and
N.W. 164th St. will remain a four-way stop through early June for ongoing
traffic signal work.
North and southbound traffic will
remain one lane at this time as highway widening continues.
The speed limit is also reduced
to 35 mph until the project is complete in summer 2016. Drivers should plan
extra travel time and use caution in the work zone.
The eastbound N.W. 39th Expwy (SH-66) ramp to northbound SH-74
(Lake Hefner Pkwy) will be closed until 5 p.m. today as part of bridge
rehabilitation project. Drivers must locate an alternate route.
I-240 closes at Sunnylane Rd.
tonight
East and westbound I-240 will be closed between Bryant Ave. and
Sunnylane Rd. from 7 p.m. tonight to 6 a.m. Friday for bridge resurfacing.
Traffic will be diverted to Sunnylane Rd. off-ramps and immediately back onto
I-240 bypassing the bridge. Motorists should be prepared for delays and
plan an alternate route if possible.
Additionally Sunnylane Rd. will be closed between S.E. 59th St.
and S.E. 89th St. from 7 p.m. tonight to 6 a.m. Friday as part of the bridge
resurfacing project.
I-40 narrows at Rockwell Ave. Friday
Westbound I-40 will be narrowed to two lanes between Rockwell Ave.
and Council Rd. from 9 a.m. to 1 p.m. Friday for surface repairs.
I-40 narrows at Air Depot Blvd.
through Saturday
Eastbound I-40 will be intermittently narrowed to two lanes
between Air Depot Blvd. and Anderson Rd. from 8 p.m. Thursday to 8 a.m. Friday
and nightly through Saturday morning for surface repairs.
I-44 ramp at N.W. 10th closes
this week
The westbound I-44 (going
south) on-ramp from westbound N.W. 10th will be closed intermittently from 7
a.m. to 5 p.m. daily through Sunday as part of an on-going bridge
rehabilitation project. Drivers must locate an alternate route.
On-going Construction Projects:
33rd St. traffic shifted to new lanes at US-77 (Broadway) in
Edmond through summer 2016
Drivers can expect lane shifts and the following closures at the
intersection of US-77 (Broadway) and 33rd St. in Edmond:
US-77
(Broadway) will have intermittent lane closures
Northbound
US-77 (Broadway) is narrowed to one left-turn lane
Eastbound
and westbound 33rd St. is narrowed to one lane through the intersection,
and traffic has shifted to the new pavement on the south half of the
roadway. Drivers may still turn right or left at the intersection.
Drivers should expect lengthy delays and are strongly encouraged
to plan for extra time or to use an alternate route. This reconstruction and
widening project continues through summer 2016. More
information: http://www.ok.gov/odot/33rd_Broadway.html
I-40 narrows to one lane at I-40 Business near El Reno through
June
Drivers can expect intermittent lane closures on both east and
westbound I-40 at I-40 Business through June for bridge work. Eastbound
will be open during morning rush hour, westbound will be open during evening
rush hour.
I-40 narrows intermittently in El Reno through 2016
Drivers can expect intermittent lane closures on I-40 two miles
east of US-81 for on-going interchange construction at Radio Rd. continuing
through 2016.
The City of El Reno has a companion widening project on Radio Rd.
For more information about this project, call the City of El Reno at
405-262-4070.
I-40 ramps at Anderson Rd. closed through summer for city project
The east and westbound I-40 on and off-ramps at Anderson Rd. are
closed through summer for a City of Oklahoma City project. For questions,
contact the City's Department of Public Works at 405-297-2581.
I-35 narrowed near Guthrie through fall 2016
Southbound I-35 is narrowed to one lane from the Cimarron River to
SH-33 in Guthrie for a resurfacing project that continues through fall 2016.
I-240 Service Rd. turnaround closes, May Ave. narrows at I-240
nightly through May
The westbound I-240 Service Rd. protected turnaround (Texas
turnaround) at May Ave. will be closed and northbound May Ave. will be narrowed
to one lane at I-240 from 7 p.m. to 3 a.m. nightly through May for bridge
painting. The westbound I-240 off-ramp will remain open to traffic.
SH-9 lanes shifted at 36th Ave. in Norman through 2016
Drivers can expect lane shifts and a reduced speed limit on SH-9
between 36th Ave. S.E. and 72nd Ave. S.E. through 2016 for ongoing highway
reconstruction and widening.
Lindsey St. bridge, ramps at I-35 in Norman closed; detour on SH-9
East through early 2017
The
Lindsey St. bridge over I-35 and all I-35 on- and off-ramps at Lindsey St.
are closed through early 2017 for interchange reconstruction.
Drivers,
including University of Oklahoma traffic, should use the I-35 on-and
off-ramps at SH-9 East.
Lindsey
St. traffic is detoured on Ed Noble Parkway/28th Ave. S.W., SH-9 East and
24th Ave. S.W.
Speed limits are reduced and drivers should expect delays on I-35,
especially during peak travel periods, and plan extra time or consider an
alternate route such as SH-77H (Sooner Rd.)
Compress Ave., S.W. 3rd St. closed in downtown through 2016
Motorists can expect intermittent, temporary lane closures on
Shields Blvd./E.K. Gaylord Blvd. through 2016 for ongoing construction of the
new BNSF railroad bridge just to the east of E.K. Gaylord Blvd.
Other closures for work on the Oklahoma City Boulevard include:
Compress
Ave. east of E.K. Gaylord Blvd. and south of Oklahoma Ave. in Bricktown as
part of the construction of the new OKC Boulevard.
S.W.
3rd St. at the E.K. Gaylord Blvd. intersection. This street will be
reconstructed in a future phase of the OKC Boulevard.
The speed limit remains reduced to 35 mph along E.K. Gaylord Blvd.
due to the ongoing nearby work.
Meridian Ave. narrowed at S.W. 29th St. through fall 2016
Meridian Ave. is narrowed to one lane in each direction between
S.W. 29th St. and just north of S.W. 15th St. for a resurfacing and widening
project in partnership with the City of Oklahoma City. The project is expected
to continue through fall 2016.
MacArthur Blvd. narrows intermittently at N.W. 50th St. through
June
Drivers can expect intermittent lane closures on MacArthur Blvd.
at N.W. 50th St. continuing through June for an on-going
intersection and streetscape project in partnership with the City of Warr
Acres.
Follow @OKDOT on twitter.com and Know B4 U Go! Check www.oktraffic.org for real-time traffic information ODOT strongly discourages texting or tweeting while driving.