SPEC NUMBER
|
TYPE
|
TITLE
|
EFFECTIVE DATE
|
DESIGNER NOTE
|
|
420
|
Proposal Note
|
Surface Smoothness Requirements For Pavements
|
1/17/2025
|
See Document
|
|
555
|
Proposal Note
|
Surface Smoothness for Bridges and Approaches
|
1/17/2025
|
This note should be included on all projects with new bridge decks and approach slabs and at least 100 feet of approach pavement on each side of the approach slabs.
|
|
800
|
Supplemental Spec
|
Revisions To The 2023 Construction & Material Specifications
|
1/17/2025
|
The current revision date used on the Title Sheet should match the revision date that will be in effect when the Engineers Estimate is complete. This date is approximately 8 weeks prior to the Letting Date for the project.
|
|
804
|
Supplemental Spec
|
Fiber Optic Cable And Components
|
1/17/2025
|
This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices and Components.
|
|
807
|
Supplemental Spec
|
Wet Reflective Liquid Applied Pavement Markings
|
1/17/2025
|
Supplemental Specification 850 Pavement Grooving for Recessed Markings is recommended to be included anytime permanent wet reflective pavement markings are specified.
|
809
|
Supplemental Spec
|
Intelligent Transportation System (ITS) Devices And Components
|
1/17/2025
|
This specification shall be used for any project that contains Intelligent Transportation System (ITS) Devices And Components
|
|
833
|
Supplemental Spec
|
Conduit Renewal Using Spray Applied Structural Liner
|
1/17/2025
|
This specification may be used for relining existing conduit that is 36-inch diameter or greater in size Contact the manufacturers for the required thickness of the liner.
|
|
837
|
Supplemental Spec
|
Liner Pipe
|
1/17/2025
|
This specification is for using liner pipe to rehabilitate existing conduits; Design the liner pipe according to the Location and Design Manual, Volume 2, Drainage Design.
|
|
840
|
Supplemental Spec
|
Mechanically Stabilized Earth Wall
|
1/17/2025
|
This Supplemental Specification (SS) is to be included on all projects using MSE Walls. See the Bridge Design Manual for technical design information.
|
|
844
|
Supplemental Spec
|
Concrete Patching With Embedded Galvanic Anode Protection
|
1/17/2025
|
Do not use this specification for patch areas less than 5 ft2. Anode spacing shall be specified by the designer; See note in document.
|
|
851
|
Supplemental Spec
|
Precast Gravity And Semigravity Retaining Wall
|
1/17/2025
|
See Document
|
|
858
|
Supplemental Spec
|
Thin Polymer (Epoxy) Overlays for Structural Slabs
|
1/17/2025
|
See Document
|
|
862
|
Supplemental Spec
|
Rockfall Protection
|
1/17/2025
|
Consult with the Office of Geotechnical Engineering when considering the use of Rockfall Protection.
|
|
870
|
Supplemental Spec
|
Prefabricated Modular Retaining Wall
|
1/17/2025
|
See Document
|
|
872
|
Supplemental Spec
|
Void Reducing Asphalt Membrane
|
1/17/2025
|
See Document
|
|
875
|
Supplemental Spec
|
Longitudinal Joint Adhesive
|
1/17/2025
|
Recommended rates of material to be used on longitudinal joints on plans for quantity calculations. This specification is to be used for surface courses only.
|
|
881
|
Supplemental Spec
|
Full Depth Reclamation With Emulsified Asphalt
|
1/17/2025
|
This specification is intended for use on full depth flexible pavements that require significant quantities of full depth repairs which may not be cost effective to perform. Do not use this specification for rigid or composite pavements.
|
|
899
|
Supplemental Spec
|
Close-Fit Pipe Liner
|
1/17/2025
|
See Document
|
|
905
|
Supplemental Spec
|
Wet Reflective Optics Materials
|
1/17/2025
|
None
|
|
908
|
Supplemental Spec
|
Digital Speed Limit (DSL) Sign Assembly
|
1/17/2025
|
None
|
|
909
|
Supplemental Spec
|
Intelligent Transportation System (ITS) Devices And Components
|
1/17/2025
|
None
|
|
1008
|
Supplement
|
Method Of Test For Glass Beads (740.09) And Wet Reflective Optics (SS905)
|
1/17/2025
|
None
|
|
1043
|
Supplement
|
Calibration and Test Procedures for Use of Asphalt Concrete Nuclear Gauges
|
1/17/2025
|
None
|
|
1046
|
Supplement
|
Vehicular Signal Lamps Prequalification Procedure (732.041)
|
1/17/2025
|
None
|
|
1051
|
Supplement
|
Resistance Of Compacted Bituminous Concrete To Moisture Induced Damage
|
1/17/2025
|
None
|
|
1053
|
Supplement
|
Storage And Introduction Of Antistrip Additives Into An Asphalt Concrete Plant
|
1/17/2025
|
None
|
|
1058
|
Supplement
|
Surface Smoothness Equipment And Operator Requirements
|
1/17/2025
|
None
|
|
1069
|
Supplement
|
Pre-qualified Aggregate Supplier Program
|
1/17/2025
|
None
|
|
1077
|
Supplement
|
Dynamic Message Sign Prequalification Procedure
|
1/17/2025
|
None
|
|
1083
|
Supplement
|
Certification of Graffiti Protection Coatings for Concrete
|
1/17/2025
|
None
|
|
1089
|
Supplement
|
Traffic Marking Material Sampling And Shipping Requirements
|
1/17/2025
|
None
|
|
1101
|
Supplement
|
Asphalt Concrete Mixing Plants
|
1/17/2025
|
None
|
|
1103
|
Supplement
|
Prequalification Procedure For Wet Reflective Optics
|
1/17/2025
|
None
|
|
1126
|
Supplement
|
Developing And Submitting A Portland Cement Concrete; Mix Design For Approval
|
1/17/2025
|
None
|
|
1140
|
Supplement
|
Material Supplier Vendor Certification Program
|
1/17/2025
|
None
|
|
2023
|
Spec Book
|
Construction and Materials Specifications
|
1/17/2025
|
|