Through the week ending October 2, 2021: The following traffic advisory includes restrictions on the state highway system in Hamilton County. All work will be contingent upon the weather. For construction information and statewide information regarding road conditions, visit ODOT on the web at www.Ohgo.com.


I-71_Small

INTERSTATE 71 CONSTRUCTION

I-71 Major Rehabilitation - Widening to three lanes between S.R. 126 (Ronald Reagan Cross-County Highway) and S.R. 562 (Norwood Lateral), as well as bridge work at multiple structures and removing the Ridge Road exit and adding an exit to Kennedy Avenue on northbound I-71. Intermittent single-lane closures will be in effect through the work zone during late evening and overnight hours. In addition, the ramp from Kennedy Avenue to I-71 North is closed through late August for paving work. All work is anticipated to be complete by mid-October.

 


I-74_small

INTERSTATE 74 CONSTRUCTION

I-74 Slide Repair - At the Colerain/Beekman ramp to I-74 West. Traffic will be maintained, and intermittent restrictions may be in effect on I-74 at the interchange. The project is scheduled for completion in the fall of 2021.

I-74/I-275 Bridge Maintenance - In the eastbound direction at the Wesselman Road overpass, just east of the S.R. 128 on-ramp. Single-lane closure beginning at 6 p.m. Friday, Sept. 24, followed by a double-lane closure at 8 p.m. The double-lane restriction will be in effect until 6 a.m. Monday, Sept. 27.


I-75_large

INTERSTATE 75 CONSTRUCTION

I-75/Mill Creek Expressway Major Rehabilitation  - Major rehabilitation project at the I-74/75 interchange to widen and resurface I-75 between Paddock Road and the Western Hills Viaduct and reconfigure the interchange. Work also includes interchange improvements at Hopple Street, I-74, Mitchell Avenue, Norwood Lateral and Paddock Road. Various lane closures will be in effect in the construction zone, including one lane of I-74 West that is closed between I-75 North and the ramp from I-75 South through early October for paving.

I-75 Thru the Valley Major Rehabilitation - Between Glendale-Milford Road and the Kemper Road overpass. Construction includes adding a fourth lane in each direction, as well as adding capacity at the Sharon Road interchange and at Sharon Road and Chester Road. Lane and shoulder restrictions will be in effect on the mainline, as well as on the ramps at the Sharon Road interchange.

I-75 Utility Work - Aerial cable crossings at Second Street. The ramp from I-75 South to Second Street will be closed from 10 p.m. Tuesday, Sept. 28 to 5 a.m. Wednesday, Sept. 29.  

I-75/U.S. 50 (Sixth Street) Bridge Maintenance - At the Sixth Street Viaduct over I-75. Effective Monday, Sept. 27, through Saturday, Oct. 2, single-lane restrictions on I-75 South between the on ramp from Western Avenue and the Sixth Street overpass nightly, from 10 p.m. to 6 a.m. the following day.  The ramp from I-75 South to Seventh Street will also be closed nightly, from 10 p.m. to 6 a.m. the following day.

 


I-275_small

I-275 Slide Repair - Near the Kilby Road interchange. Traffic will be maintained through the work zone; however, I-275 may be subject to intermittent lane restrictions, and the ramps to/from Kilby Road may be subject to intermittent, short-term full closures during overnight hours. The project is scheduled to be completed in early fall 2021.

I-275 Slide Repair - Along the left side of the entrance ramp from southbound Loveland Madeira Road to I-275 West. Intermittent restrictions may be in place on the slip ramp; however, traffic will be maintained. The project is scheduled to be completed in the fall.

I-275 Paving - At the Four Mile Road overpass, near Kellogg Road. Single-lane closure in the westbound direction from 8 p.m. Friday, Sept. 24, to 6 a.m. Saturday, Sept. 25.


NEW  IMPACTS

S.R. 562/Norwood Lateral Utility Work - The shoulder of the Norwood Lateral is closed in the westbound direction between the Norwood Avenue exit and entrance ramps. The restriction will be in effect through late September or until all work is completed. Motorists are reminded of the need for additional caution through the area.

U.S. 50 Environmental Field Operations - At State Line Road and the Ohio-Indiana border. Single-lane closure in the westbound direction will be in effect Sept. 7-Oct. 1. Traffic will be maintained in the left lane through the area.

 

CONTINUING IMPACTS

Brent Spence Bridge Maintenance - A bridge repair project on Brent Spence Bridge by the Kentucky Transportation Cabinet through mid-November 2021.

  • I-75 South is open to two, 11-foot lanes on the bridge.
  • The ramps from southbound I-71 to the bridge, as well as from Fort Washington Way and Third Street to I-71 South and the bridge, are closed. Southbound I-71 traffic is being detoured via I-471 and I-275. 

John A. Roebling Bridge Restoration - The suspension bridge between Cincinnati and Covington is closed for a bridge restoration by the Kentucky Transportation  Cabinet. Motorists may detour via the Clay Wade Bailey (U.S. 25/42/127) Bridge or the 4th Street/Veterans Bridge. Interim completion is scheduled for late November 2021, and the entire project is scheduled to be completed by Dec. 31.

Weller Road Bridge Rehabilitation - Over I-275, between Bridgewater Lane and Indian Woods/Weller Woods Drive. The bridge is closed through early December 2021, and traffic is being detoured by way of Weil Road, Kemper Road and U.S. Route 22 (Montgomery Road). 

Deer Park Pedestrian Connector - On St. John's Terrace, Blue Ash Road and Orchard Lane. Replacement of curb and gutter, drive aprons, installation of signage and pavement markings. Traffic will be maintained by flaggers as needed through the work zone. Construction is scheduled to be completed by late fall of 2021.

C.R. 251 (Blue Ash Road) Sidewalk & Signalization - Between Duneden and Galbraith roads. Construction has resumed to complete sidewalk, curb ramp and other paving operations. Traffic will be maintained by flaggers as needed through the work zone. All work is scheduled to be completed in late summer.

S.R. 125 Beechmont Bridge Connector/LMSRT - Intermittent, single-lane closures in either direction on S.R. 125 (Beechmont Avenue), between the S.R. 32 interchange and Beechmont Circle. Effective Friday, Sept. 24, the right lane of westbound Beechmont Avenue will be closed at the S.R. 32 interchange, and the temporary signal at the ramp from S.R. 32 West to westbound Beechmont will be turned off. This restriction will be in effect through Monday, Oct. 4; following this, the ramp will be closed for up to 30 days for culvert installation. The entire project is scheduled for completion in the summer of 2022.

U.S. 22 (Gilbert Avenue) Bridge Repair -  Over Eggleston Avenue and Culvert Street in Cincinnati. Single-lane closures are in effect between Court and Broadway streets, and the sidewalk along the bridge is closed, and restrictions will also be in place in the parking area beneath the bridge to within five feet of the work area.

U.S. 27 (Colerain Avenue) Sidewalk Construction - On the west side of Colerain Ave. between Byrneside Drive and Banning Road. Southbound Colerain Avenue will be reduced to one lane in the work zone; other intermittent restrictions may in effect in the northbound direction. Completion is scheduled for mid-summer 2021.

U.S. 42 (Reading Road) Bridge Rehabilitation - Over Cooper Creek, near Cooper Road and the Reading corporation limit. Lane restrictions will be in effect through mid-fall. Traffic will be maintained in a minimum of one lane in each direction.

U.S. 42 (Reading Road) Sidewalk Construction - On the west side of U.S. 42, between Sunnybrook Drive and the S.R. 126 East exit ramp. Traffic impacts should be minimal; however, traffic will be maintained in the work area.

U.S. 42 Intersection Improvement - At the intersection/interchange with I-275 and at Hauck Road. Nightly, single-lane closures will be in effect on U.S. 42 (Lebanon Road) North and South between Executive Drive and Fields Ertel Road from 7 p.m. to 6 a.m. Traffic will be maintained through the work zone.

U.S. 50/Martin Drive Bridge Repair - On eastbound U.S. 50 (Columbia Parkway) to Martin Drive. Martin Drive has been reopened to traffic; however, intermittent lane restrictions may be in effect on Columbia Parkway, and additional ramp restrictions from I-471 and Eggleston Avenue to Columbia Parkway will be in effect as well. The project is scheduled to be completed in early fall.

 

###

For more information contact: 
Kathleen Fuller, 513-933-6517
Liz Lyons, 513-933-6534


OHGO.com logo

Know Before You Go!

For more detailed traffic information, and to get personalized traffic alerts for your commute, download the OHGO app or visit OHGO.com.