Through the week ending March 13, 2021: The following traffic advisory includes restrictions on the state highway system in Hamilton County. All work will be contingent upon the weather. For construction information and statewide information regarding road conditions, visit ODOT on the web at www.Ohgo.com.


I-71_Small

INTERSTATE 71 CONSTRUCTION

I-71 Major Rehabilitation  - Widening to three lanes between S.R. 126 (Ronald Reagan Cross-County Highway) and S.R. 562 (Norwood Lateral), as well as bridge work at multiple structures and removing the Ridge Road exit and adding an exit to Kennedy Avenue on northbound I-71. Various lane restrictions will be in effect during nighttime hours for pavement work. The entire project is scheduled for completion in the summer of 2021.

I-71 Stream Stabilization - Along I-71 North at the Stewart Road exit. Traffic on the exit ramp has been shifted and is being maintained in one lane.


I-74_small

INTERSTATE 74 CONSTRUCTION

I-74 Slide Repair - At the Colerain/Beekman ramp to I-74 West. Traffic will be maintained, and intermittent restrictions may be in effect on I-74 at the interchange.


I-75_large

INTERSTATE 75 CONSTRUCTION

I-75/Mill Creek Expressway Major Rehabilitation  - Major rehabilitation project at the I-74/75 interchange to widen and resurface I-75 between Paddock Road and the Western Hills Viaduct and reconfigure the interchange. Construction also includes interchange improvements at Hopple Street, I-74, Mitchell Avenue, Norwood Lateral and Paddock Road. Various lane closures will be in effect in the construction zone. The project is scheduled to be completed in the fall of 2022.


NEW IMPACTS

Brent Spence Bridge Maintenance - A bridge repair project on the Brent Spence Bridge by the Kentucky Transportation Cabinet. Southbound I-75 is being maintained in two, 11-foot lanes on the bridge, and the ramp from southbound I-71 to the bridge is closed, as well as the ramps to I-71 southbound from Fort Washington Way and Third Street. Southbound I-71 traffic will be detoured via I-471. The scheduled completion date is Nov. 15, 2021.

John A. Roebling Bridge Restoration - The suspension bridge between Cincinnati and Covington is closed for a bridge restoration by the Kentucky Transportation Cabinet. Motorists may detour via the Clay Wade Bailey (U.S. 25/42/127) Bridge or the 4th Street/Veterans Bridge. Interim completion is scheduled for late November 2021, and the entire project is scheduled to be completed by Dec. 31.\

U.S. 27 Sidewalk Construction - On the west side of U.S. 27 between Byrneside Drive and Banning Road. One lane of traffic will be maintained in each direction. Completion is scheduled for mid-summer 2021.

I-275 Utility Work - Power line installation over I-275 in Ohio, Kentucky and Indiana during the weekends of March 6, March 13 and March 20. Rolling road blocks will be in effect between Miami Fort Station in North Bend, Ohio to Tanners Creek in Lawrenceburg, Indiana for up to 45 minutes at various intervals from approximately 8 a.m. to 5 p.m. each weekend day. Various ramp closures within the project area will also be in effect.

 

CONTINUING IMPACTS

S.R. 125 Bridge Rehabilitation - Between Berkshire Lane and Brachman Avenue, midway between S.R. 32 and Five Mile Road. Traffic will be maintained in a minimum of one lane in either direction throughout construction. Berkshire Lane will be maintained by flaggers as needed during hours of operation. All work is scheduled for completion in late summer 2021.

U.S. 22/S.R. 126 Roundabout  - At the intersection of U.S. 22 (Montgomery Road) and S.R. 126 (Ronald Reagan Cross-County Highway) for the Montgomery Quarter Development project. Traffic is being maintained in a minimum of one lane on Montgomery Road; however, intermittent lane restrictions and closures may be in effect at the interchange ramps to and from Montgomery Road. The project is scheduled for completion in Summer 2021.

 

###

For more information contact: 
Kathleen Fuller, 513-933-6517
Liz Lyons, 513-933-6534


OHGO.com logo

Know Before You Go!

For more detailed traffic information, and to get personalized traffic alerts for your commute, download the OHGO app or visit OHGO.com.