COLUMBIANA COUNTY: Weekly Construction Update
WEEK OF AUGUST 31, 2020
New Philadelphia, Ohio (August 27, 2020) - The following construction projects are anticipated to affect highways in Columbiana County in the coming weeks. All outlined work is weather permitting.
The following projects are ongoing in Columbiana County:
 |
|
U.S. Route 30 Projects
U.S.Route 30 (Lincoln Way) traffic signal upgrade: Project includes signal upgrades at the intersections of U.S. 30 (Lincoln Way) with SR 45/SR 154, Beaver Street, Market Street, and Jefferson Street. Completion date is October 31, 2020.
U.S. Route 30 resurfacing project: Resurfacing of U.S. Route 30 from SR 7/SR 267 to SR 170. During this work, one lane of traffic will be maintained in each direction. Completion date: October 31, 2020.
|
 |
|
State Route 11 Project
State Route 11 resurfacing project: Project includes the resurfacing of SR 11 from the Columbiana/Mahoning County line to just south of the SR 344 interchange. During this work one 11-foot lane of traffic maintained. Completion date: September 30, 2020.
|
 |
|
State Route 7 Projects
SR 7 resurfacing project: from Stratton to Wellsville. During this work, one lane of traffic will be maintained in each direction with a 15' width restriction. Completion date is October 31, 2020.
SR 7 bridge replacement: located east of Columbiana between SR 14 and Metz Road. Traffic maintained via temporary traffic signals. Completion date: June 30, 2021.
|
Safety project in East Palestine: Project includes the installation of pavement markings, traffic signal upgrades, and pedestrian signal upgrades. Traffic maintained via flaggers when necessary. Completion date: September 30, 2020
Multiple Columbiana County routes to be resurfaced: Project includes the resurfacing of multiple routes including SR 45 in Salem from Township Road 410 to U.S. Route 62, SR 558 from SR 45 to SR 517, and SR 9 from the Carroll/Columbiana County line to U.S. Route 30.
State Route 45 slide repair project: SR 45 is currently restricted to one lane of traffic between Zacharias Road and Pleasant Valley Road for a slide repair project. Traffic is maintained via temporary traffic signals. Completion date is September 30, 2020.
State Route 172 roadway rehabilitation: Resurfacing of SR 172 from the Stark/Columbiana County line to New Garden. Traffic will be maintained via flaggers. Completion date: October 31, 2020.
Know Before You Go!
For more detailed traffic information, and to get personalized traffic alerts for your commute, download the OHGO app or visit OHGO.com.
|
|