New Traffic Pattern at I-670/270/US 62 Starts Tonight

Having trouble viewing this email? View it as a Web page.

Wordmark

TRAFFIC ADVISORY 

SmartLane


I-670 at I-270 and US 62 (East Side)

Starting tonight, construction is RAMPING UP on the I-670 SmartLane project, literally. Crews begin work on the ramp from I-670 east to I-270 north and US 62 east, which means ramp traffic will be reduced to two lanes on the bridge over I-270 for six months.

I-270 north traffic can use either lane, but drivers headed to US 62 east MUST be in the right lane (see graphic below). Instead of two lanes each for I-270 north and US 62 east, the exit to US 62 east will be one lane only beginning Monday. 

New traffic pattern shown on ramp from 670 east to 270 and 62


To shift traffic into this new pattern, lanes and ramps will be closed TONIGHT:

  • 7 PM: I-670 EB will be reduced to two lanes between Cassady Ave. and I-270 and the ramp from I-670 EB to I-270 NB will be reduced to one lane.
  • 8 PM: The ramp from US 62 WB to I-270 NB will close.
    Detour: US 62 WB to I-270 SB to Hamilton Rd. to I-270 NB.
  • 10 PM: The ramp from International Gateway/Stelzer Rd. to I-670 EB will close.
    Detour: International Gateway/Stelzer Rd. to I-670 WB to 5th Ave. to I-670 EB.
  • 11 PM: I-670 EB will be reduced to one lane between Cassady Ave. and I-270.
  • 12 AM: The ramps from I-670 EB to I-270 NB and US 62 EB will close.
    Detour: I-670 EB to I-270 SB to Hamilton Rd. to I-270 NB (to US 62 EB). 
  • 5 AM TOMORROW: All lanes and ramps open.

Learn more about the project and see the final interchange configuration HERE.  

All work is weather dependent; it may be postponed or cancelled without prior notice.

For more information, contact:
Breanna Badanes at (740) 833-8222


OHGO.com logo

Know Before You Go!

For more detailed traffic information, and to get personalized traffic alerts for your commute, download the OHGO app or visit OHGO.com.