Rooted in racial and economic equity, the 20-Year Neighborhood Park Plan (NPP20) transforms parks across the city by: 

  • Protecting current levels of MPRB funding

  • Dedicating an additional $11 million-plus annually, through 2036, in NPP20 funds for neighborhood parks: capital investments and rehabilitation at prioritized locations, plus increased maintenance at all locations

  • Helping to address racial and economic equity through a data-driven, criteria-based system, which allocates NPP20 funds first where they're most needed

NPP20 Highlight: Currie Park

Currie Park splash pad
Currie Park splash pad with girl and onlookers

 

The newest place to beat the heat in Minneapolis opened last month at Currie Park. With separate areas for younger and older children, the splash pad accommodates twice as many people as the wading pool it replaced. That's a welcome feature, since Cedar-Riverside is one of the city's densest neighborhoods, with a high youth population.


The splash pad was the final element of a now-complete project that included a new restroom building; a full-sized basketball court that replaced two defunct half-courts; path improvements; and new lighting. The $3.3 million invested at Currie Park is the largest NPP20 funding allocation for a park since this long-term initiative was enacted in 2017.


NPP20-funded capital investment projects

Bassett's Creek Park playground

5 new playgrounds

 

Bassett's Creek (pictured), ClevelandFarviewLovell Square and Phelps parks all saw new play areas open last fall and this spring.

Additional improvements at some locations included picnic facilities, landscaping and path improvements and flexible-use areas.

 

 

Peavey Park construction scene

6 projects under construction this summer and fall


McRae Park and Kenny Park - new playgrounds

 

Perkins Hill Park - all-wheel pump track; natural-surface mountain-bike skills trail

 

Phelps Park - splash pad (follows 2020 construction of a play area, landscaping, lighting, path/parking lot accessibility improvements)

Stewart Park - 6,000 square-foot multi-use field, paths, fencing, storm sewer improvements

Victory Park - splash pad with seating, landscaping, other improvements

 

Farwell Park master plan

7 new projects - construction planned for 2022

 

CorcoranFarwell (pictured) and Hall parks - MPRB staff and community members are engaging to prioritize improvements from approved master plans for each park

Jordan Park - wading pool, restroom/mechanical building

 

North Commons Community Center and Water Park - new community center with expanded gym space, reconfigured/relocated parking, water park expansion/reconstruction

 

Painter Park - skate park, gathering spaces, paths, landscaping; reconstruction of tennis and basketball courts

 

Sibley Park - playground, wading pool

 

Other capital projects completed since 2017 


Bossen Field Park - play equipment, relocated play area; basketball court; additional parking and paths; new and renovated athletic fields || Central Gym Park - new athletic field, basketball court, playground, paths and expanded gathering space || Folwell Park - play area, renovated tennis courts, lighting for west athletic field, paths and path lighting || Luxton Park - play area ||  Northeast Recreation Center - new building opened in 2018 || Peavey Field Park - three-court basketball complex, play areas, multi-purpose field, central promenade, site grading, park lighting |Phillips Aquatics Center / Phillips Community Center - renovation of existing indoor pool and additional new indoor pool, building upgrades, parking lot || Powderhorn Park - wading pool renovation and new amenities; equipment, surfacing and renovations for three play areas


NPP20-funded rehabilitation

Farview Recreation Center entrance

 

Projects are prioritized based on the need for repair, restoration or replacement, along with equity rankings and other factors; when possible, projects are combined for efficiency and cost savings. 

 

 

 

 

NPP20 Highlight: Farview Park and Recreation Center

While Farview had a wading pool and athletic field constructed before NPP20 funding launched in 2017, it's also had a series of NPP20-funded rehabilitation projects since then: 

  • Siding and roof replacement
  • HVAC/electrical replacements and overhaul
  • Restroom renovation
  • Accessibility improvements for parking lot, paths, recreation center entry

Taken together - along with the new playground mentioned above - these projects indicate the level of work needed at some parks. Now Farview is in good shape to continue serving the community for another 20 years. Put simply, that's why NPP20 exists! As the initiative continues across the neighborhood park system, more parks and recreation centers will see a similar renewal. 

Additional rehabilitation projects (2019 - 2021)

Restroom renovations for current ADA requirements and equitable access at Bryant Square, MatthewsLyndale Farmstead (part of a larger capital project with other funding) and Audubon (with furnaces and air conditioning) recreation centers

 

Roof replacements (2020 and 2019) at Farview, Logan and Luxton recreation centers; Cavell Park (restroom building), Loring Park (maintenance building) 

Concrete sidewalk rehabilitation for smoother, safer sidewalks at 66 neighborhood parks since 2017, including 23 parks in 2020


Heating, ventilation and air conditioning (HVAC) projects - higher efficiency furnaces at Beltrami, Kenwood, McRae and North Commons recreation centers in 2020

 

Park lighting repairs and replacements at Elliot, FarviewMatthews parks

 

North Commons Water Park - new equipment (to be transferred to a future reconstructed water park), concrete repairs


2019 NPP20 Report

NPP20 Annual Reports

 

Available online at minneapolisparks.org/NPP20, the reports provide an overview of the initiative and key financial details on NPP20-funded projects; the latest report, for 2020, covers projects in 2019, 2020 and 2021.  

 

More on MPRB park care and improvements

Visit the current projects page to explore and get details on the full range of work in progress to maintain, restore and upgrade the U.S.'s #1 park system. 


 Every neighborhood deserves a great park. 

  ~ Visit minneapolisparks.org/NPP20

  ~ Subscribe to updates 