January 5, 2024
Web: metrotransit.org/gold-line-construction
Construction Hotline: 651-602-1919
Email: goldline@metrotransit.org
Twitter: @GoldLineBRT
View an interactive map for specific construction location information.
Over the winter, work will continue, including retaining walls, noise walls, bridges, and the Woodlane Station Park and Ride ramp.
Activities continue this week throughout the project area. Expect to see construction crews in St. Paul, Maplewood, Oakdale, and Woodbury. View a timelapse video of bridge construction in St. Paul and Woodbury.
Downtown St. Paul highlights
Ongoing:
- Limited construction activities this winter in Downtown St. Paul.
East St. Paul highlights
Ongoing:
- Crews drill holes and place posts for the construction of a noise wall near the intersection of Maria Avenue and Hudson Road. Residents in the area will experience an increase in noise and vibrations during these activities.
- Crews continue constructing a retaining wall between Mounds Boulevard and Maria Street.
- Crews finish noise wall construction this week along Hudson Road between Maple Street and Earl Street.
- Between Earl Street and Frank Street crews continue to construct noise walls.
- Crews construct foundations and walls for the Earl Station at Hudson Road and Earl Street.
- Between Frank Street and Griffith Street, crews install noise wall posts.
- Bridge construction is underway at Johnson Parkway. Crews continue pile driving for bridge foundations. Expect intermittent closures of Johnson Parkway underneath I-94 during pile driving activities and additional noise and vibrations during this activity. Follow the posted detour route.
- Work continues on a retaining wall near Old Hudson Road and Luella Street. Pile driving activities continue for retaining wall construction near Old Hudson Road and Luella Street. Expect additional noise during this activity. The closure will remain through January 2024.
- This week, crews began pile-driving activities near the intersection of McKnight Road and Hudson Road for a pedestrian and bus-only bridge.
- Crews grade the area for bridge work and install sanitary and stormwater sewers near the intersection of McKnight Road and Hudson Road.
- Private utility relocation work continues along Hudson Road and McKnight Road in East St. Paul.
 Image: Johnson Parkway Detour Map
 Image: Map of Old Hudson Road and Luella Street Closure
 Image: McKnight Work Zone Map
Traffic Impacts:
- Maple Street pedestrian bridge will reopen in summer 2024.
- Hudson Road east of Frank Street to Griffith Street will remain closed this winter. Access to properties maintained from the west to Frank Street.
- Concrete lanes on Hudson Road are future bus-only lanes for the Gold Line route. They are closed to regular vehicle traffic.
- Expect intermittent closures on Johnson Parkway between Wakefield Avenue and Hudson Road underneath Interstate 94. Follow posted detour route.
 Crews pour concrete for noise walls in East St. Paul.
 Crews pile-drive for foundations of a bus-only bridge over Johnson Parkway in East St. Paul.
Maplewood/Landfall/Oakdale highlights
Upcoming:
- Starting the week of January 15, the 4th Street Bridge over I-694 in Oakdale will close. Crews will begin preparations for bridge demolition. Follow posted detour route Helmo Avenue to 10th Street to Hadley Avenue.
Ongoing:
- This week, crews began pile-driving activities near the intersection of McKnight Road and Hudson Road for a pedestrian and bus-only bridge.
- Construction activities continue on Century Avenue/Highway 120 as crews construct foundations for the pedestrian and bus-only bridge over Century Avenue.
- Private utility relocation work continues along 4th Street Street, Hadley Avenue, and Hudson Boulevard in Oakdale.
Traffic impacts:
- Lane shifts and lane closures near McKnight Road and Hudson Road will continue this winter.
- Century Avenue/Highway 120 is reduced to a single lane in each direction between Innovation Blvd and Brookview Drive, on either side of the I-94 overpass.
- Helmo Avenue south of 4th Street in Oakdale is reopened.
 Image: Oakdale-Landfall Construction Map
Woodbury highlights
Upcoming:
- Expect daytime intermittent lane closures in the next few weeks on Guider Drive between Woodlane and Bielenberg Drive as crews construct a retaining wall.
Ongoing:
- Crews install signals along Bielenberg Drive between Hudson Road and Tamarack Road. Vehicle access will be maintained during this work.
- South from Tamarack Road along Bielenberg Drive, crews install signals. Private utility relocation work continues along Bielenberg Drive in Woodbury.
- Construction continues for the new Woodlane Park & Ride near the intersection of Woodlane Drive and Guider Drive. Crews install underground utilities, a retaining wall, and pour concrete for the future park & ride structure.
- This week, crews prepare to pour retaining wall foundations along Guider Drive near the Queens Station area.
Traffic Impacts:
- Northbound and southbound traffic on Bielenberg Drive between Hudson Road and Guider Drive is returned to a regular configuration running on either side of the center median. Both directions for traffic will be reduced to one lane during installation of traffic signals.
- Guider Drive between Bielenberg Drive and Queens Drive is temporarily reopened for the winter.
 Image: Map of Bielenberg Work Zone
 Crews install foundations for bus-only bridge over Century Avenue in Maplewood and Oakdale.
Nearby Projects:
Nearby Projects Being Planned
-
MnDOT Highway 61 Study
- A study along Hwy 61 from I-94 to Lower Afton Rd. in St. Paul to determine what safety, mobility and accessibility improvements are needed for a 2027 resurfacing project.
-
MnDOT East Seventh Street and Arcade Street Improvements
- Safety improvements for all users along East 7th St./Hwy 5 and Arcade St./Hwy 61 from I-94 in St. Paul to Roselawn Ave. in Maplewood.
|