Bushaway Road paving begins

The contractor started paving yesterday on Bushaway Road (County Road 101) between Gray’s Bay and Eastman Lane/McGinty Road. This will ensure that people can travel between Minnetonka Boulevard and downtown Wayzata through the winter.

However, the roadway will not reopen just yet, as crews need to work on retaining walls. They will be driving sheeting for the walls just north of the causeway at the most narrow place in the road. Due to the confined working area, this work will require a crane to be parked in the road. For safety of both crews and drivers, the road remains closed to through traffic until further notice.

paving Bushaway

Construction update

Crews continue to work on several activities throughout the project corridor:

  • Excavating in the railroad corridor in preparation for the shoofly, or temporary tracks (pictured below)
  • Installing stone on retaining walls
  • Connecting and relocating utilities
  • Temporary paving of driveway aprons
  • Installing permanent grass seed in many areas

RR excavation

Work zone safety

Thank you for slowing down and paying attention in work zones. Staying alert and dedicating your full attention to driving keeps you and our crews safe. 

For more information

Hotline: 866-981-1101 

Email: countyroad101@hennepin.us

Website: www.hennepin.us/countyroad101       

Twitter: @hennepinCR101


See active projects on our interactive road construction map.

Learn more about how transportation is connecting people to places.