 Stage 3 of the roundabout construction will begin July 28, weather permitting. Highway 313 motorists will detour using Gladys, Main St. and CR 74. See detour map. Highway 11 east, west and south legs of the roundabout will be open to traffic. Motorists are encouraged to use additional caution in the work zone during this transition.
Highway 11 Warroad Construction: July 23
What's happening this week?
July 21-26
-
Traffic impacts: Temporary closures of entrances for paving operation. Traffic control transitions will begin therefore drivers should slow down and pay attention in the work zones
- Paving of the east, west and south portions of the roundabout will be completed
- Crews will install turf establishment and signage devices
- Prep project site for traffic to be transitioned onto roundabout
- Bridge project will finish installing sheeting. Remove old pier and piles and begin installing new piles and pier
What's happening next week?
July 28- August 1
-
Traffic impacts: traveling lanes will proceed east and west for Highway 11 on new roundabout surface. Cedar Ave to the south will be open as well.
-
Highway 313 closure will take place Monday morning, vehicles will not be able to travel north or south on Highway 313 from Highway 11. All vehicles must use detour route.
- Temporary bypass will be removed and work for Highway 313 will begin.
- Bridge project will have west abutment and pier caps constructed
About the project:
MnDOT, in collaboration with Roseau County and the City of Warroad, plans to reconstruct Highway 11 between County Road 5 and Highway 313/Cedar Avenue NW and Cedar Avenue NW between Highway 11 and Lake Street.
Construction is scheduled to take place in 2024-2026.
These roadways are in need of long-term improvements to address aging infrastructure, safety, and access issues. This project will resurface deteriorating pavement, replace storm sewer, and incorporate landscaping along the project area.
2024: Resurface Hwy 11 south of the bridge and Cedar Ave. Begin Hwy 11/313 roundabout.
2025: Construct Highway 11/313 roundabout. Begin half of the bridge construction.
2026: Continue other half of the bridge construction.
The bridge will be constructed in 2025 and 2026. The bridge will remain open during the winter months.
How about a roundabout?
Traffic impacts:
 Stage 2: Construct east, west and south legs of the roundabout. Cedar Avenue will be closed at Hwy 11 during this stage, approximately 3-4 months. Stage 2 is expected to wrap up this week and begin Stage 3 next week.
 Once Stage 2 of the roundabout construction is complete, Stage 3 will begin. Stage 3: Construct north leg of the roundabout. Hwy 313 will be closed during this stage, approximately 2-3 weeks. See detour map.
  The truck detour is in place for the duration of the project. The Hwy 313 detour will only be in place during Stage 3 of the project which will begin July 28 and last approximately 2-3 weeks, weather permitting.