Thief River Falls Project Update: June 12, 2020
Katie and Leslie say hello to TRF! You may have seen us out and about today capturing the latest project progress from the drone.
Highway 32 roundabout
Detour begins on Highway 32 resurfacing project in Thief River Falls June 15
Motorists on Highway 32 will detour beginning June 15 as crews begin resurfacing Highway 32 between St. Hilaire and Thief River Falls. Motorists on Highway 32 will use CR 3, CR 20 and Highway 59. Access to residences and businesses will be maintained. Motorists traveling north on Highway 32 can access the Sanford Medical center by use of the detour. Those traveling south can access the Sanford Medical Center by use of a flagger on site, however will not be able to access Highway 32 further south.
Hwy 1- Construct three roundabouts, frontage road and multi-use trail between Hwy 59 and Kinney Ave
- This projects is in Stage 1 and currently removing the surface from Kinney Avenue to Brooks Avenue. Motorists are currently detoured onto First Street West. (See picture below)
- mndot.gov/d2/projects/2020/hwy1-roundabouts
Hwy 1- Replace culvert west of the intersection with Hwy 59
Hwy 1- Resurface between Hwy 219 and Pennington CR 18 east of Thief River Falls
Hwy 32- Construct roundabout at the intersection with Pennington CR 8 and CR 16
Hwy 32- Replace culvert south of Pennington CR 7
-
Detour beginning on June 15. Motorists will use CR 3, CR 20 and Highway 59. Traffic coming from south headed north, must take detour. From the north, going to hospital can still get through, using flaggers on site. Only able to get to hospital, not further south. For both the resurface on hwy 32 resurface. Residents will have access maintained.
Hwy 32- Resurface between Thief River Falls and St. Hilaire
-
Detour beginning on June 15. Motorists will use CR 3, CR 20 and Highway 59. Traffic coming from south headed north, must take detour. From the north, going to hospital can still get through, using flaggers on site. Only able to get to hospital, not further south. For both the resurface on hwy 32 resurface. Residents will have access maintained.
- mndot.gov/d2/projects/2020/hwy32-resurface
Hwy 32- Pedestrian improvements in St. Hilaire
Pennington CR 8/Mark Blvd- Connect road with the construction of a new bridge over the Red Lake River
Pennington CR 8/Mark Blvd- Construct roundabout at Pennington Ave S/Pennington CR 17 near Challenger Elementary
Westside Flood Damage Reduction Project- Construct a diversion channel and drainage infrastructure on the west side of Thief River Falls. Underground storm sewer will be installed along Barzen Ave and Greenwood St, along with a new sanitary sewer.
- Motorists can expect lane closures along Greenwood St., Oakland park Rd., and Highway 32
www.mndot.gov/d2/projects/2020/westside-drainage-project
Challenger Elementary Roundabout
Highway 1-Brooks roundabout
CR 8-Bridge project.
Visit: www.mndot.gov/d2/projects/2020/thief-river-falls/index.html
|