Reminder: I-94 closure scheduled April 19-22

Having trouble viewing this email? View it as a Web page.

MnDOT logo

Metro - I-94 East Metro Interchange: 2019-2022 study

Reminder: I-94 closure scheduled April 19-22

Motorists should be aware of ramp and road closures along eastbound I-94 in Washington County as crews begin bridge work at the I-94/I-494/I-694 interchange.

Beginning 8 p.m. Fri, April 19, we’ll be closing EB I-94 at the I-94/I-494/I-694 interchange to all traffic. Westbound I-94 will remain open to traffic. Crews will also need to close the following loop ramps off I-94:

  • SB I-694 to EB I-94 ramp
  • EB I-94 to NB I-694 ramp

You’ll be directed to follow the posted detour of SB I-494 to the Tamarack exit, then back onto NB I-494.

In addition, by 7 p.m. Fri, April 19, both directions of Tamarack Rd. between Weir Dr. and Bielenberg Dr. and the I-494 Tamarack interchange ramps will be closed to local traffic to accommodate the I-94 detour traffic using the Tamarack Rd. interchange.  Local traffic will be detoured to the Valley Creek Rd. interchange.

Crews will reopen all lanes and ramps by 5 a.m. Mon, April 22, weather permitting.

More about this project

The I-94/I-494/I-694 interchange and bridge reconstruction project is being done to provide a smoother, safer, long-lasting road with updated bridges and some mobility improvements. Performing periodic pavement repairs at the appropriate times can greatly increase a road’s lifespan. The project helps ensure MnDOT’s transportation system will continue to serve the state for many years. Construction is expected to be complete by fall 2020.

For more information, visit the project website at: mndot.gov/metro/projects/i94-494-694.

Stay connected